Photo

Arlan San Vicente HVAC Engineer

Philippines
direct expansion and chilled water system.  Fabrication of Duct  Piping Insulation  Auto Cad 2D  Plumbing & Fire Suppression system.  Management & Supervision Installation/construction of Heating Ventilation & Air conditioning (HVAC)

Arlan C. San Vicente
Registered Mechanical Engineer
Mobile : +639211832184
Email : [email protected]

Carriers Brief
With A total 14 years experience. 8 years & 7 months in Oil & Gas Industry in the construction/installation of HVAC, Fabrication of duct, Fire Fighting, Plumbing, Piping Insulation & Electrical Heat Tracing System. 5 years & 5 months in the operation and maintenance of HVAC and refrigeration in the manufacturing and residential facilities.
Area of expertise
 Installation/construction of Heating Ventilation & Air conditioning (HVAC), direct expansion and chilled water system.
 Fabrication of Duct
 Piping Insulation
 Auto Cad 2D
 Plumbing & Fire Suppression system.
 Management & Supervision

Professional Experience

Company Name: GS Engineering & Construction Corp.
Project : Ruwais Refinery West Restoration Project, Ruwais, Abu Dhabi, U.A.E
Position : Electrical Heat Tracing (EHT) Engineer
Industry : Construction in an Oil & Gas Industry
Duration : July 2017 – March 2019

Duties & Responsibilities:
 Plan & Supervise for the dismantling & re- installation of Electrical Heat Tracing System of Bunker pipe line 1 & 2 at Jetty , a 3.3KV (DC) supply, 6 nos of 5.8km electrical heat tracing scable.
 Re-commissioning of Electrical Heat Tracing System.
 Coordinate with Client, PMC, and other discipline, raise Inspection Test Request (ITR) and documentation as well.
 Plan & supervise for the erection/dismantling of scaffolding platform used in dismantling & erection of Electrical Heat Tracing Cable & for the restoration work and maintenance in RRW project.
 Supervise the painting repair jobs & Piping Insulation for the RRW Project.
 Permit Receiver/Job Performer in Abu Dhabi National Oil Company (ADNOC).

Company Name: GS Engineering & Construction Corp.
Project : Rumaitha/Shanayel, Phase –III Project, Rumaitha, Abu Dhabi, U.A.E
Position : HVAC Engineer
Industry : Construction in an Oil & Gas Industry
Duration : February 2016 – May 2017

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system for Substation 3, & 4 & ITR 3 & 4.
 Review HVAC drawings, check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system and Material approval request (MAR).
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct.
 Prepared Inspection Test Request (ITR) & as built drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in Abu Dhabi Company for Onshore Oil Operation (ADCO).

Company Name: Trinity Engineering Services WLL Qatar
Project : Nuwat Residential Tower Res 15 – 2B+G+22 Floors – Lusail City, Qatar
Position : Project HVAC Engineer
Industry : Construction
Duration : Feb. 10, 2015 – Dec 10, 2015

Duties & Responsibilities:
 Review HVAC drawings, check if meets the design criteria, equipment and unit are in a proper location and ensure access for maintenance, coordination drawing OF HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system,. Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
Floating inquiry and prepare comparative statement for the materials for HVAC system.
 Coordinate to other discipline and Consultant for the problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the installation of HVAC system.

Company Name: GS Engineering & Construction Corp.
Project : Inter Refineries Pipeline II Project, Abu Dhabi, U.A.E
Position : HVAC Engineer
Industry : Construction in an Oil & Gas Industry
Duration : February 2012 – May 2014

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system as well as Plumbing & Fire Fighting system for Substation & Control Building at Musafa, Al Ain & Madinat Sayed ADNOC Terminal..
 Review HVAC drawings; check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system, Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Supervision for the installation of Plumbing works & Fire Fighting System (Inergen) for Substation and Control Buildings.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct.
 Prepared Inspection Test Request (ITR) & As Built Drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in TAKREER & ADNOC.

Company Name: GS Engineering & Construction Corp.
Project : Green Deisel Project, Ruwais, Abu Dhabi, U.A.E.
Position : HVAC Engineer
Industry : Construction in an Oil & Gas Industry
Duration : October 2009 – September 2011

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system for Substation Building, Control Building & Workshop Building.
 Review HVAC drawings; check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system, Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct & equipment.
 Prepared Inspection Test Request (ITR) & As Built Drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in TAKREER.

Company Name: Hyundai Engineering & Construction Co. LTD
Project : Qatar Fertilizer Company (Ammonia and Urea 5 Project), Qatar
Position Title : HVAC Supervisor
Industry : Construction in an Oil & Gas Industry
Duration : March – August 2009

Duties & Responsibilities:
 Direct supervision for the completion of construction of site office, Piping work shop and Duct fabrication shop for DAEKYUNG ENGINEERING CO. LTD.
 Installation of machineries for the duct fabrication such as; Uncoiler machine, Shearing, Beading, Bending, Round bending, TDF Machines and etc.
 Supervise the fabrication and completion of the duct for COGEN 1 and COGEN 2.

Company Name: Saudi Binladin Group – Operation & Maintenance
Project : Arqa Palace, Riyadh, Saudi Arabia
Position : Mechancal Engineer/(HVAC)
Industry : Operation & Maintenance
Duration : August 2006 – September 2008

Duties & Responsibilities:
 Manage the operation, corrective and preventive maintenance of all HVAC equipment such as: Centralized air cooled chillers with a capacity of 1940 TOR, Cold Storage, Packaged type and Split type air conditioning and all Ventilation equipment. Equipped with Building Management System (BMS), Hotel Management System (HMS) and used MAXIMO 5.2 for the preventive maintenance of the equipment.
 Plans, organize and direct supervision for the installation of new equipment, project site modification related to HVAC system and the daily task for the HVAC department.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.

Company Name: Saudi Ceramic Company
Project : Ceramic Plant, Riyahd, Saudi Arabia
Position : Airconditioning Supervisor
Industry : Operation and Maintenance
Duration : July 2004 – March 2006

Duties & Responsibilities:
 Manage the Operation, corrective and preventive maintenance of all air conditioning unit of the plant.
 Plans, organize, and direct supervision for the repair and corrective maintenance of the air conditioning equipment.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.
 Initiate new strategy for the preventive maintenance for the air conditioning equipment of the plant resulting to minimized the downtime of the equipment and save 40% volume of the compressor replaced.

Company Name: Estrella Ice Plant and Cold Storage Company
Project : Ice Plant and Cold Storage, Quezon City, Philippines.
Position : Maintenance Engineer
Industry : Operation & maintenance
Duration : July 2002 – January 2004

Duties & Responsibilities:
 Manage the operation, repair, corrective and preventive maintenance of all machineries for the ICE Plant and Cold Storage of the company.
 Ensure the maximum and quality production of the Ice block and Tube Ice.
 Ensure the right temperature of all cold storage are attained and maintained at all times.
 Rectify the problem in maintaining the right temperature of the unions and the correct time cycle to produce quality tube ice.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.

Educational Back Ground

Field of Study : Engineering (Mechanical)
Course : Bachelors of Science in Mechanical Engineering
School/University : University of Nueva Caceres
Naga City, Philippines
Date : 1996 – 2001

Field Of study : Engineering (Marine)
Course : 3yrs Associate in Marine Engineering
School/University : Mariner’s Polytechnic Colleges Foundation
Canaman, Camariner Sur, Philippines
Date : 1993 – 1996

Seminars/Training

School Name: AHI Carrier FZC
Course Taken: Product & Control Training for TOSHIBA Air conditioning Equipment
Location: ACTS Centre, Sharjah, U.A.E
Duration (Month & Year): April 25, 2014

School Name: Green Engineered Training Center
Course Taken: Leed Green Associate Seminar
Location: Abu Dhabi, U.A.E
Duration (Month & Year): March 28, 2014

School Name: Philippine Society of Mechanical Engineers (PSME), Abu Dhabi Chapter
Course Taken; District Cooling and Control Guidelines and Double Wheel Concept Design for AHU’s
Location: Abu Dhabi, U.A.E
Duration (Month & Year): March 21, 2014

School Name: Philippine Society of Mechanical Engineers (PSME), Abu Dhabi Chapter
Course Taken; Expansion and Pressurization in Chilled and Heated Water System
Location: Abu Dhabi, U.A.E
Duration (Month & Year): February 28, 2014

School Name: Philippine Society of Mechanical Engineers (PSME), Abu Dhabi Chapter
Course Taken; Role of Mechanical Engineers in Green Building Construction
Location: Abu Dhabi, U.A.E
Duration (Month & Year): February 28, 2014

School Name: Philippine Society of Mechanical Engineers (PSME), Abu Dhabi Chapter
Course Taken; HVAC Design using VRV/VRF System
Location: Abu Dhabi, U.A.E
Duration (Month & Year): February 7, 2014

School Name: Microcadd Technologies Co., Inc.
Course Taken: AutoCad 2009 with Rendering level I & II
Location: Cubao, Philippnes
Duration (Month & Year): February 17- March 6, 2009

School Name: Saudi Binladin Group Training Center
Course Taken: Introduction to Maximo 5.2
Location: Riyadh, Saudi Arabia
Duration (Month & Year): May 11-12, 2008

Personal Particulars

Age : 43 years old
Date of Birth : 15 Nov 1976
Nationality : Filipino
Marital Status : Married
Permanent Address : Blk 7, Lot 9, Ph-2, Casabuena De Pulilan, Brgy. Cutcut, Pulilan, Bulacan.

References

Available upon request

Declaration
I hereby certify that all details stated in these curriculum vitae are true and correct and do not contain any false information whatsoever.

_________________________
Engr. Arlan San Vicente
Mechanical Engineer

Education

1996-2001 Bachelor of Science in Mechanical Engineer at University of Nueva Caceres
1993-1996 3 yrs Associate in Marine Engineering at Mariners Polytechnic Colleges oundation

Experience

July 2017-March 2019 Electrical Heat Tracing (EHT) Engineer at GS E &C

Duties & Responsibilities:
 Plan & Supervise for the dismantling & re- installation of Electrical Heat Tracing System of Bunker pipe line 1 & 2 at Jetty , a 3.3KV (DC) supply, 6 nos of 5.8km electrical heat tracing scable.
 Re-commissioning of Electrical Heat Tracing System.
 Coordinate with Client, PMC, and other discipline, raise Inspection Test Request (ITR) and documentation as well.
 Plan & supervise for the erection/dismantling of scaffolding platform used in dismantling & erection of Electrical Heat Tracing Cable & for the restoration work and maintenance in RRW project.
 Supervise the painting repair jobs & Piping Insulation for the RRW Project.
 Permit Receiver/Job Performer in Abu Dhabi National Oil Company (ADNOC).

February 2016 - May 2017 HVAC Engineer at GS E&C

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system for Substation 3, & 4 & ITR 3 & 4.
 Review HVAC drawings, check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system and Material approval request (MAR).
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct.
 Prepared Inspection Test Request (ITR) & as built drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in Abu Dhabi Company for Onshore Oil Operation (ADCO).

February 2015 - December 2015 Project HVAC Engineer at Trinity Engineering Services WLL Qatar

Duties & Responsibilities:
 Review HVAC drawings, check if meets the design criteria, equipment and unit are in a proper location and ensure access for maintenance, coordination drawing OF HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system,. Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
Floating inquiry and prepare comparative statement for the materials for HVAC system.
 Coordinate to other discipline and Consultant for the problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the installation of HVAC system.

February 2012 - May 2014 HVAC Engineer at GS E&C

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system as well as Plumbing & Fire Fighting system for Substation & Control Building at Musafa, Al Ain & Madinat Sayed ADNOC Terminal..
 Review HVAC drawings; check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system, Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Supervision for the installation of Plumbing works & Fire Fighting System (Inergen) for Substation and Control Buildings.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct.
 Prepared Inspection Test Request (ITR) & As Built Drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in TAKREER & ADNOC.

October 2009 - September 2011 HVAC Engineer at GS E&C

Duties & Responsibilities:
 Plan & Supervise for the installation of HVAC system for Substation Building, Control Building & Workshop Building.
 Review HVAC drawings; check if equipment and unit are in a proper location, ensure access for maintenance & coordination drawing of HVAC & other discipline for clashing.
 Prepared submittals for the following: methodology for installation of HVAC system, Material approval request (MAR) for the HVAC System.
 Prepared bill of quantity for the materials & Equipment for the HVAC System.
 Coordinate to PMC and other discipline for the inspection & problem arises in the construction and installation of HVAC System.
 Plans, organize, and direct supervision for the fabrication of duct & installation of HVAC system.
 Prepared shop drawing for detailed cutting list for the fabrication of duct as well as shop drawing for the installation of duct & equipment.
 Prepared Inspection Test Request (ITR) & As Built Drawings.
 Assist the commissioning team for the HVAC system and rectify the necessary things to meet the required parameter/criteria of the system.
 Permit Receiver/Job performer in TAKREER.

March - August 2009 HVAC Supervisor at Hyundai Engineering & Construction Co. LTD

Duties & Responsibilities:
 Direct supervision for the completion of construction of site office, Piping work shop and Duct fabrication shop for DAEKYUNG ENGINEERING CO. LTD.
 Installation of machineries for the duct fabrication such as; Uncoiler machine, Shearing, Beading, Bending, Round bending, TDF Machines and etc.
 Supervise the fabrication and completion of the duct for COGEN 1 and COGEN 2.

August 2006 - September 2008 Mechanical Engineer/(HVAC) at Saudi Binladin Group - Operation & Maintenance

Duties & Responsibilities:
 Manage the operation, corrective and preventive maintenance of all HVAC equipment such as: Centralized air cooled chillers with a capacity of 1940 TOR, Cold Storage, Packaged type and Split type air conditioning and all Ventilation equipment. Equipped with Building Management System (BMS), Hotel Management System (HMS) and used MAXIMO 5.2 for the preventive maintenance of the equipment.
 Plans, organize and direct supervision for the installation of new equipment, project site modification related to HVAC system and the daily task for the HVAC department.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.

July 2004 - March 2006 Airconditioning Supervisor at Saudi Ceramic Company

Duties & Responsibilities:
 Manage the Operation, corrective and preventive maintenance of all air conditioning unit of the plant.
 Plans, organize, and direct supervision for the repair and corrective maintenance of the air conditioning equipment.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.
 Initiate new strategy for the preventive maintenance for the air conditioning equipment of the plant resulting to minimized the downtime of the equipment and save 40% volume of the compressor replaced.

July 2002 - January 2004 Maintenance Engineer at Estrella Ice Plant and Cold Storage Company

Duties & Responsibilities:
 Manage the operation, repair, corrective and preventive maintenance of all machineries for the ICE Plant and Cold Storage of the company.
 Ensure the maximum and quality production of the Ice block and Tube Ice.
 Ensure the right temperature of all cold storage are attained and maintained at all times.
 Rectify the problem in maintaining the right temperature of the unions and the correct time cycle to produce quality tube ice.
 Hands on in trouble shooting and problem solving that may arise in the equipment/Unit.