To be able apply to all my knowledge and skills.To more flexible in work and to gain more potential in my expertise.Yearning for responsibility to earn personal growth.
Actual activity of wiring of light,socket bending of conduit,lay out and wiring of CCTV,smoke detector,fire alarm,strobe light and ect.Study the standard of electrical Installation and standard of materials to use for Electrical.
Reading the schematic diagram.Glanding and termination of main cable,control cable,lighting cable and socket.Installation of Panel Board,Switchgear,ATS Panel, MDP Panel and LP Panel,Installation of conduit pipe.Installation of cable tray and cable.Lay-out of lighting,socket and JB.
Installation of Feeder line and Raiser using by G.I pipe 4″.Fixing the light and wiring outside the building using by Suspended Cradle.Lay-out of light socket and etc. in slabing using PVC conduit pipe ½ and ¾.
Lay- out of lighting,socket and switch.Termination of lighting panel and socket.Installation of conduit pipe and wiring for CCTV,smoke detector,fire alarm and Telephone.