Arnold (Jibril) R. Tamang (Filipino)
UAE Address: Al Satwa, Dubai, UAE
Mobile # 056-9686982/ 050-1496431
E-mail Add – [email protected]
With UAE Manual Driving License
PROFESSIONAL SUMMARY:
▪ Having 13 years of competitive experience in engineering industry.
▪ Work in different System like Mechanical, Electrical, Plumbing (MEP), Security System, and Telecom System.
▪ Have a Good work ethics with excellent communication and interpersonal skills.
▪ Excellent Motivational, Leadership skills in a fast-paced environment.
▪ Capable to deliver into the new leading Technologies.
▪ Ability to work well in both a team environment and individual environment.
WORK EXPERIENCE:
MVP TECH. GENERAL TRADING – CCTV SYSTEM & ACS
AL Quoz, Industrial 4, 11b Street
Dec 15,2019 – to Present
FUJAIRAH NATIONAL CONSTRUCTION CO.LLC. – MEP SYSTEM Project Involved: Dubai Govt. Workshop
Khalid Bin Walled Street, Bur Dubai, Dubai, United Arab Emirates Meydan Height Retail Center, Zabeel Feed mill
January 12, 2017 – Dec 12,2019 Residential Building, United Medical Industries. & more
RED SOLUTIONS FZ-LLC. – CCTV & ACCESS CONTROL SYSTEM Project Involved: Dubai D3, Dubai Opera House
Dubai Biotechnology and Research Park, Block No.D20 Dubai UAE Butterfly Building.
February 15, 2015 – December 08, 2016
ATLAS TELECOMMUNICATION EST. – TETRA & CCTVSYSTEM Project Involved: Dubai Airport C4 – T1 & T2
Ras Alkhor Complex #10, Dubai UAE Dubai Tram. Dubai Fish Market, Dragon Mart 2
November 2012 – February 12, 2015 Al Awir HQ.Ajman NOC Project. Dubai Tunnel & more.
TILCA ELECTRO MECHANICAL LLC – MEP SYSTEM Project Involved: Oasis Hospital Al Ain
Lufthansa bldg., Dubai UAE Premier Inn Hotel
January 2012 – September 2012
LUNAR ELECTRO MECHANICAL LLC – MEP SYSTEM Project Involved: Oasis Hospital Al Ain
Al Satwa, Dubai UAE
January 2011 – January 2012
FIREPRO SYSTEM LLC – FIRE FIGHTING SYSTEM Project Involved: Ferrari World, ADAT Hangar,
Al Quoz, Dubai UAE Naem Mall, Mina Mall. Tameer Tower
July 2007 – January 2011
AutoCAD Operator / Draftsman
JOB DESCRIPTION:
Preparation of Shop Drawing base from Approved IFC, DM, DCD. Preparation of Coordination Drawing with Other Trades Follow the standard Tools for Drafting and Familiar in work load and under pressure. Arrange Drainage Sloping and Level, Prepare External and Site Works Layout. Prepare Drawing (Mechanical, Electrical (High Voltage & Electrical Low Voltage) for Approval.Floor Plan, Section & Details. Prepare CCTV Design Layout for submission according to IFC and Engineer Design. Prepare Drawing for Radio Tetra System and CCTV System Draft Detailed Layout, Schematic, and Floor Plan Layout for Submission. Designing Fire Fighting System, Fire Alarm System, Checked IFC Drawing and Tender Drawing as References for Shop Drawing. Prepare Drawing For Approval. Prepare Section and Details and Coordination drawing Modify Drawing and Resubmit According each Comment by Consultants, Print Drawing According to Scale. As Built Drawing According for submission. Follow Standard for Preparation of Drawing. Use Architectural Drawing as References for Coordination. Familiar the Terms and Symbol Associated with the Drawing Related to Activity. Assigned Pen Assignment for Final printing of Drawing for submission, Scale Drawing and arrange each Tittle Block for Submission.
EDUCATIONAL BACKGROUD: TECHNICAL SKILLS:
College:Philippine College of Criminology REVIT MEP / Architectural, AutoCAD 2d, Solid Work, MS Office
Bachelor of Science in Criminology
Arnold R.Tamang
Draftsman
ELV DRAFTSMAN