Photo

ATHER AHMED Chief Engineer

Karachi Pakistan
VERTICAL MULTISTAGE PUMPS AND ROTARY PUMPS INSTALLATION

ATHER AHMED.
FATHER NAME: –                                RAFIQ AHMED QURESHI (Late).

ADDRESS: –                                         L – 10.SECTOR 11- K NORTH KARACHI.

Phone #:-                                            0092 – 0300 – 2435524, 0336-2387537.

DATE OF BIRTH: –                              2ND JULY 1969.

NATIONALITY: –                                  PAKISTANI.

N.I.C #                                                 42101-1803171-9

MARITAL STATUS: –                           MARRIED

CHILDREN: –                                        THREE (STUDIES).

PASSPORT #                                       JM1161711. ISSUE DATE 15 – 03 – 2013

EXPIRY DATE 13 – 03 – 2023.

Email Address: –                                 [email protected]

[email protected]

Linked In Profile URL.                        https://www.linkedin.com/in/ather-ahmed-93070543/detail/contact-  info

VISA STATUS: –                                   REQUIRED SPONSOR SHIP VISA.

NOTICE PERIOD: –                                  As per Interview Selection and Recruiter requirement.

SKYPE I.D: –                                              aries.sagi1

CURRENT SALARY: –                              2500 $ / MONTH + 1300 C.C COMPANY MAINTAIN

EXPECTED SALARY:                                8000 $ / Minimum / Month.

EDUCATION.

DEGREE: –                                            Pass B, Tech Pass Mechanical.

INSTITUTE: –                                        MEHRAN ENGINEERING UNIVERSITY JAMSHORO SINDH.

INSTITUTE LOCATION: –                    Hyderabad, Pakistan

START DATE: –                                    MARCH 1998 Completion Date: February 2001

MARKS OBTAIN: –                              GPA: 2.54

PROJECT: –                                          Industrial Operation Training at Sugar Mill Steam Generation department.

DEGREE / DIPLOMA:-,                        POWER TECHNOLOGY

(ELECTRO MECHANICAL).

INSTITUTE: –                                        GOVERNMENT COLLEGE OF TECHNOLOGY S.I.T.E KARACHI.

INSTITUTE LOCATION: –                    Karachi, Pakistan

STARTING DATE: –                              JUNE 1986 Completion Date: June 1989

MARKS OBTAIN: –                             FIRST DIVISION.

VOCATIONAL TRAINING: –                 Attend Six Month Technical Training Program at K.E.S.C Thermal Power                                                                                                       West Wharf Karachi and S.I.T.E Gas Turbine Station.

HIGHER SCHOOL or S.S.C:-                  Pas Secondary School Examination in Science, Math, Physics, Chemistry and Biology.

INSTITUTE: –                                        K.P.T BOYS SECONDARY SCHOOL MANORA KARACHI # 10

INSTITUTE LOCATION: –                     Karachi, Pakistan

STARTING DATE: –                              JAN 1982 Completion Date: March 1984

MARKS OBTAIN: –                              Grade (D).

 

 

 

TECHNICAL CERTIFICATE COURSE.

 

·         COMPLETE 56 HOURS S.I.T.A ENGINE COURSE FROM ALLIED ENGINEERING S.I.T.E.KARACHI.

SPECIALTIES.

Gas Engine Co – Generation Captive Power Plant fabrication.

Gas Engine Co – Generation and Diesel Engine Captive Power Plant Maintenance Planning.

Gas Engine Co – Generation and Diesel Engine Captive Power Plant Operations.

Gas Engine Co – Generation and Diesel Engine Captive Power Plant Maintenance & Services

Gas Engine Co – Generation and Diesel Captive Power Plant Installation.

ENERGY CONSERVATION.

Jacket Water and Engine Exhaust Heat Recovery System installation, Erection and commissioning.

Engine Exhaust Fire Tube Waste Heat Recovery Boiler Installation, Operation and Maintenance.

Single Effect Hot Water Absorption Chiller Installation, Operation and Maintenance.

Cooling Tower Installation and Maintenance.

Softening Plant installation Operation.

 

WORK EXPERIENCE.

PRESENT JOB.

JOB TITLE: –                 CHIEF ENGINEER CAPTIVE POWER HOUSE.

EMPLOYER: –              LIBERTY TEXTILE MILLS LIMITED.

ADDRESS: –                Karachi, Pakistan, Plot # A – 51/ A S.I.T.E Karachi 75700.

Industry: –                   TEXTILE PROCESS.

START DATE: –           October 2011 to PRESENTLY WORKING.

As Chief Engineer looks after all activities of 4EK Series G – 3516 A, G – 3516 B, G – 3516 C & newly installed G – 3520 E Dry Manifolds and New Jenbacher JGS – 420 (B311). Caterpillar Gas Engine Co – Generation Captive Power Plant

CAT G -3516 A(4 EK)965 K.W X 1 = 0.965 M.W

CAT G -3516 A (CSZ) 1005 K.W X 1 = 1.005 M.W

JANBACHER JGS – 420(B311) 1500 K.W = 1.500 M.W (NEWLY INSTALLED)

CAT G – 3516 C (GZZ) 1450 K.W X 1 = 1.45 M.W

CAT G – 3520 E (GZE) 2022 K.W X 2 = 4.044 M.W

PLANT CAPACITY = 8.964 M.W

D – 3512 (24 Z) 1005 K.W X 2 CAT DIESEL = 2.010M.W STAND BY DIESEL GENERATORS.

1.3 M.W SOLAR POWER INSTALLED RECENTLY (REON ENERGY PROJECT).

Co-Generation Installation and erection work. 1.85 Tons D.D.F.C DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler.

2.26 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler. Installation 3.00 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler and erection with all auxiliaries, equipment, and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM – 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. 300 U.S.R.T L.G Model WC2H – 034 hot water absorption chiller installed. Planed all Required Top –End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare parts, Gas and Diesel Engine Fuel Oil, Engines Lube Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and emails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning, and Maintenance and arrange a meeting to achieve all targets for saving Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy-saving Issues.

 

JOB TITLE: –                 MANAGER POWER HOUSE AND UTILITY IN WEAVING                   DEPARTMENT.

EMPLOYER: –              YUNUS TEXTILE MILLS LIMITED LANDHI KARACHI.

ADDRESS: –                 H – 23 / 1 Landhi Industrial Area Karachi.

Industry: –                    Textile WEAVING

START DATE: –            May 2008        END DATE: –     October 2011(3.4 Years)

As Manager Captive Power House and Utility look after all activities of 4EK Series G – 3516 A –CSZ SERIES Dry Manifolds. Caterpillar Gas Engine Co – Generation Captive Power Plant Capacity.

965 K.W X 2= 1.930 M.W

1005 K.W X 1 = 1M.W

1005 K.W X 1 = 1 M.W

965 K.W X 3 = 2.895 M.W

PLANT CAPACITY = 6.825 M.W

Co – Generation Installation and erection work.

1.85 X 3 = 5.55 Tons D.D.F.C Duplex Type Exhaust Fired Waste Heat Recovery Boiler.

1.1 Ton D.D.F.C Simplex Type Exhaust Fired Waste Heat Recovery Boilers.

5 Tons D.D.F.C Gas fire Boiler.ZR 300 series Atlas Copco oil free screw compressor 6 Nos unit Installation and maintenance H.P & L.P elements replacement work carried out. Look after all operation and Maintenance activities of Utility Plant with all auxiliaries’ equipment’s and controllers.Installed 250 U.S.R.T L.G Single Effect Steam Fired Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals Planed all Required Top – End Overhauling and In Frame over Hauling and Major Overhauling as per O.E.M Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing required in all related systems and engines, chillers, Boilers, compressors. Maintain spare Parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water, ZR 300 Series Atlas Copco oil free screw Compressors Daily and Weekly Chemical Dozing Report checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Timely submitted all Power Generation, Steam Generation reports to Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, Air Leakages Inverters efficiency and day time energy saving Issues.

JOB TITLE: –                             CHIEF ENGINEER CAPTIVE POWER HOUSE.

EMPLOYER: –                          LIBERTY TEXTILE MILLS LIMITED.

ADDRESS: –                             Plot # A – 51/ A S.I.T.E Karachi 75700.

Industry: –                              Textile Process.

START DATE: –                        October 2000 END DATE: – May 2008 (7.7 Years)

As Chief Engineer look after all activities of 4EK Series G – 3516 A, G – 3516 B, G – 3516 C Dry Manifolds. Caterpillar Gas Engine Co – Generation Captive Power Plant

965 K.W X 2 = 1.930 M.W

1005 K.W X 1 = 1M.W

1110 K.W X 1 = 1.1 M.W

1450 K.W X 1 = 1.45 M.W

TOTAL PLANT CAPACITY = 5.48 M.W

1005 K.W X 2 CAT DIESEL = 2.010M.W STAND BY DIESEL GENERATORS.

Installation and erection work.

1.85 Tons D.D.F.C Exhaust Fired Waste Heat Recovery Boiler.

1.1 TON X 2 = 2.2 Tons Gresham Eastern Exhaust Fired Waste Heat Recovery Boilers.

Installation and erection with all auxiliaries’ equipment’s and controllers.

On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM – 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. Planed all Required Top – End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare Parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and mails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy saving Issues.

JOB TITLE: –                 ERECTION ENGINEER.

EMPLOYER: –              SIDDIQ SONS PROCESSING MILLS S.I.T.E KARACHI.

ADDRESS: –                 Siddiq Sons Processing Mills F – 205 S.I.T.E Industrial Area near S.I.T.E Fire Station Karachi.

Industry:                    Textiles Process.

START DATE: –            October 1999 END DATE: –     April 2000 ( 6 MONTHS )

Carried Out 4EK Series Wet Mani Fold Caterpillar Gas Engines Installation and erection work. Installed Jacket Water Heat Recovery and Exhaust Heat Recovery System. In Jacket Water Heat Recovery Installed Plate Type GEA Heat Exchanger and Motorize Control Actuator Valve with Barber Column Module 8000 attachments.

JOB TITLE: –                   Deputy Manager Captive Power House.

EMPLOYER: –              SAPPHIRE TEXTILE MILLS LIMITED KOTRI.

ADDRESS: –                 PLOT # D – 15 Sapphire Textile Mills UNIT #2 Kotri Industrial Area District Dadu Sindh.

Industry:                    Textile Spinning.

START DATE: –            November 1996 END DATE: –            March 1999 (2.4 Year )

Manage 4EK Series Wet Manifold Caterpillar Gas Engines

Perform 3RC Series 625 K.W Caterpillar Gas Engine Installation and Erection with Power panel and Control Panel Installation work.

Manage Power Plant Operation and all Maintenance work.

Plan Schedule Maintenance as per O.E.M Intervals.

Carry out Fault finding and rectification work perform and perform all Predictive Maintenance in time. Planed Top – End Overhauling and Major Over Hauling as per O.E.M Time frame S.M.U. Manage all required purchasing as per power plant demand and requirement. Maintain inventory records. Negotiate with Fabricators and vendors for outdoor maintenance and repairing work.

Arrange all required Parts and Auxiliaries in stock inventory.

 

JOB TITLE: –                 Shift Incharge.

EMPLOYER: –              LUCKY ENERGY LIMITED. (Project of Fazal Textile Mills Limited).

ADDRESS: –                  PLOT # L – A – 2 / B BLOCKS 21 Federal B Area Karachi.

Industry: –                  Energy

START DATE: –            March 1994 END DATE: –       October 1996 (2.7 Years)

4EK – Series Wet – Manifold Caterpillar Gas Engines

965 K.W X 11 = 10.725 M.W Captive Power Plant Installation.

All Gas Engine Erection on given Pads or Foundation with proper Isolators balancing and fixed all Attachments like Exhaust Mufflers Power and Control Panels cabling and erection work with All Auxiliaries equipment Cooling Towers, Water Softening Plant, Engine Lubricating Oil Storage and Supply System, K&SB Raw Water Circulating Pumps, Siemens H.T Transformer and Johnson’s and Philips Oil Circuit Breakers Trolleys Switchgear Installation and distribution work perform With all safety measures.

All operation and Predictive Maintenance perform. Maintain store inventory.

Maintain all log sheets and reports per forma.

Maintain Daily Generation Record on log books.

 

JOB TITLE: –                 Assistant Engineer

EMPLOYER: –             REGENT TEXTILE MILLS LIMITED.

ADDRESS: –                  PLOT # A / 66 Regent Textile Mills Manghopir Road S.I.T.E Karachi

START DATE: –           October 1990END DATE: –     January 1994             (3.3 Years)

* 3RC Series Caterpillar Gas Engines 625 K.W X 3 = 1.950 M.W Captive     Power

Plant Operation and Maintenance work carried out.

* Carry out all Schedule maintenance and predictive maintenance.

* Carry out Top – End Overhauling of Caterpillar 3RC Series Gas engines.

* Carry out In Frame Maintenance Overhaul.

* Carry out Major Overhauling.

 

SKILLS.

·         TIME MANAGEMENT.

·         Skill Level: Intermediate Experience: 27 years.

·         TEAM BUILDING.

·         Skill Level: Expert Experience: 27 years.

·         CONFLICT MANAGEMENT.

·         Skill Level: Intermediate Experience: 17 years.

·         NEGOTIATION AND COMMUNICATION.

·         Skill Level: Intermediate Experience: 17 years.

·         ROOT CAUSE ANALYSIS.

·         Skill Level: Intermediate Experience: 27 years.

·         H.R.S.G INSTALLATION, OPERATION AND MAINTENANCE.

·         Skill Level: Intermediate Experience: 17 years.

·         CHILLER OPERATION AND MAINTENANCE.

·         Skill Level: Intermediate Experience: 17 years.

·         POWER PLANT INSTALLATION AND ERECTION.

·         Skill Level: Expert Experience: More than 17 years.

·         POWER PLANT OPERATION.

·         Skill Level: Expert Experience: 27 years.

·         POWER PLANT MAINTENANCE.

·         Skill Level: Expert Experience:  27 years.

·         POWER PLANT PLANING.

·         Skill Level: Intermediate | Experience: More than 17 years.

·         POWER PLANT HIGH VOLTAGE TRANSFORMER 2500 Kva STEP UP AND STEP DOWN TRANSFORMER INSTALLATION AND MAINTENANCE.

·         Skill Level : EXPERT  | Experience: More than 17 years.

·         POWER PLANT HIGH VOLTAGE OIL CIRCUIT BREAKER 11 Kva TROLLEYS INSTALLATION, OPERATION AND              MAINTENANCE.

·         Skill Level: Intermediate | Experience: More than 17 years.

·         POWER PLANT POWER CABLING LAYING AND CONNECTION WITH CABLE LADDERS AND TRAYS.

·         Skill Level: EXPERT | Experience: More than27 years.

·         POWER PLANT CONTROL CABLING LAYING AND CONNECTION WITH LADDERS AND CABLE TRAYS.

·         Skill Level: Intermediate | Experience: More than 27 years.

·         SHELL AND PLATE TYPE HEAT EXCHANGERS INSTALLATION AND MAINTENANCE.

·         Skill Level: EXPERT | Experience: More than 27 years.

·         RECTANGULAR AND BOTTLE TYPE COOLING TOWER INSTALLATION AND MAINTENANCE.

·         Skill Level: EXPERT | Experience: More than 27 years.

·         CIRCULATING PUMPS, VERTICAL MULTISTAGE PUMPS AND ROTARY PUMPS INSTALLATION, OPERATION AND MAINTENANCE.

·         Skill Level: EXPERT  | Experience: More than 17 years.

·         .     GAS AND DIESEL ENGINE CYLINDER HEADS BORE SCOPING.

·         Skill Level: EXPERT  | Experience: More than 27 years.

·         .     EXHAUST AMMETIONS OXYGEN ANALYZING.

·         Skill Level: EXPERT  | Experience: More than 27 yea

·         GAS AND DIESEL ENGINE COOLANT( EYTHALINE GLYCOL )CONCENTRATION  CHECK AND MAINTAIN.

·         Skill Level: EXPERT  | Experience: More than 27 years

·         COOLING TOWER AND AUXILIARIES EQUIPMENT CHEMICAL DOZING AND T.D.S AND HARDNESS LEVEL AND PROTECT ELGE FORMATION IN SYSTEM MAINTAIN.

·         Skill Level: EXPERT  | Experience: More than 27 years

 

LANGUAGES.

 

English: –         Level: Intermediate             SINDHI: –         Conversational.

 

PUNJABI: –      Conversational

 

 

REFERENCES.

 

TANVEER AHMED.

 

Job Title: –              PROJECT DIRECTOR.

Company Name:    LIBERTY POWER TECH LIMITED M – 3 FAISALABAD

PAKISTAN.

Phone Number:     +920333 – 2145911

Email Address:     [email protected]

 

 

.ZULQARNAIN JAFRI.

 

Job Title:              REGIONAL MANAGER MARKETING.

Company Name: ALLIED ENGINEERING AND SERVICES KARACHI

PAKISTAN.

Phone Number: +92021 – 35066901 (Ext. 319).

Email Address: [email protected].

 

Memberships.

 

LIBERTY MILLS FIRE AND SAFETY DEPARTMENT.

 

Membership / Role: Member E.R.T TEAM Member since: – October 2011.

 

Education

March 1998/february 2001 B, Tech Pass Mechanical. at MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY JAMSHORO HYDERABAD SINDH

Completed with 2.54 G.P / 4.0 G.P.

JUNE 1986 / JULY 1989. DIPLOMA OF ASSOCIATE ENGINEER POWER TECHNOLOGY ( ELECTRO MECHANICAL ). at GOVERNMENT COLLEGE OF TECHNOLOGY S.I.T.E KARACHI.

COMPLETED WITH FIRST DIVISION MARKS OBTAIN 2829 OUT OF 4150 68%.

Experience

OCTOBER 2011 / PRESENT CHIEF ENGINEER CO-GENERTAION CAPTIVE POWER PLANT at LIBERTY MILLS LIMITED S.I.T.E KARACHI

As Chief Engineer looks after all activities of 4EK Series G – 3516 A, G – 3516 B, G – 3516 C & newly installed G – 3520 E Dry Manifolds and New Jenbacher JGS – 420 (B311). Caterpillar Gas Engine Co – Generation Captive Power Plant
CAT G -3516 A(4 EK)965 K.W X 1 = 0.965 M.W
CAT G -3516 A (CSZ) 1005 K.W X 1 = 1.005 M.W
JANBACHER JGS – 420(B311) 1500 K.W = 1.500 M.W (NEWLY INSTALLED)
CAT G – 3516 C (GZZ) 1450 K.W X 1 = 1.45 M.W
CAT G – 3520 E (GZE) 2022 K.W X 2 = 4.044 M.W
PLANT CAPACITY = 8.964 M.W
D – 3512 (24 Z) 1005 K.W X 2 CAT DIESEL = 2.010M.W STAND BY DIESEL GENERATORS.
1.3 M.W SOLAR POWER INSTALLED RECENTLY (REON ENERGY PROJECT).
Co-Generation Installation and erection work. 1.85 Tons D.D.F.C DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler.
2.26 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler. Installation 3.00 Tons RAZZAQ DUPLEX Type Exhaust Fired Waste Heat Recovery Boiler and erection with all auxiliaries, equipment, and controllers. On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM – 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. 300 U.S.R.T L.G Model WC2H – 034 hot water absorption chiller installed. Planed all Required Top –End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare parts, Gas and Diesel Engine Fuel Oil, Engines Lube Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and emails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning, and Maintenance and arrange a meeting to achieve all targets for saving Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy-saving Issues.

MAY 2008 / SEPTEMBER 2011 MANAGER POWER HOUSE WEAVING UTILITY at YUNUS TEXTILE LANDHI KARACHI

As Manager Captive Power House and Utility look after all activities of 4EK Series G – 3516 A –CSZ SERIES Dry Manifolds. Caterpillar Gas Engine Co – Generation Captive Power Plant Capacity.
965 K.W X 2= 1.930 M.W
1005 K.W X 1 = 1M.W
1005 K.W X 1 = 1 M.W
965 K.W X 3 = 2.895 M.W
PLANT CAPACITY = 6.825 M.W
Co – Generation Installation and erection work.
1.85 X 3 = 5.55 Tons D.D.F.C Duplex Type Exhaust Fired Waste Heat Recovery Boiler.
1.1 Ton D.D.F.C Simplex Type Exhaust Fired Waste Heat Recovery Boilers.
5 Tons D.D.F.C Gas fire Boiler.
ZR 300 series Atlas Copco oil free screw compressor 6 Nos unit Installation and maintenance H.P & L.P elements replacement work carried out.
Look after all operation and Maintenance activities of Utility Plant with all auxiliaries’ equipment and controllers.
Installed 250 U.S.R.T L.G Single Effect Steam Fired Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals.
Planed all Required Top – End Overhauling and In Frame over Hauling and Major Overhauling as per O.E.M Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing required in all related systems and engines, chillers, Boilers, compressors. Maintain spare Parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water, ZR 300 Series Atlas Copco oil free screw Compressors Daily and Weekly Chemical Dozing Report checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Timely submitted all Power Generation, Steam Generation reports to Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water, Air Leakages Inverters efficiency and day time energy saving Issues.

OCTOBER 2000 / MAY 2008 CHIEF ENGINEER CO-GENERATION CAPTIVE POWER PLANT at LIBERTY MILLS LIMITED S.I.T.E KARCHI

As Chief Engineer look after all activities of 4EK Series G – 3516 A, G – 3516 B, G – 3516 C Dry Manifolds. Caterpillar Gas Engine Co – Generation Captive Power Plant

965 K.W X 2 = 1.930 M.W
1005 K.W X 1 = 1M.W
1110 K.W X 1 = 1.1 M.W
1450 K.W X 1 = 1.45 M.W
TOTAL PLANT CAPACITY = 5.48 M.W
1005 K.W X 2 CAT DIESEL = 2.010M.W STAND BY DIESEL GENERATORS.

Installation and erection work.

1.85 Tons D.D.F.C Exhaust Fired Waste Heat Recovery Boiler.
1.1 TON X 2 = 2.2 Tons Gresham Eastern Exhaust Fired Waste Heat Recovery Boilers.
Installation and erection with all auxiliaries’ equipments and controllers.
On Jacket Water Heat Recovery installed 150 U.S.R.T L.G Model # LWM – 027 Single Effect Hot Water Absorption Chillers Installations and erection work. Planed all required Schedule maintenance as per O.E.M Intervals. Planed all Required Top – End overhauling and in Frame over Hauling and Major overhauling as per O.E.M Engine Time Intervals. Arrange Annual Maintenance of all Waste Heat Recovery Boilers and Chillers as per Due Dates. Manage All Chemical requirements and plan to control all dozing. Maintain spare Parts, Gas Engine Oil Stock and Inventory with consumable parts and all required local purchase. All Power Generation, Steam Generation, Raw Water Cooling Water Hot Water Daily and Weekly Chemical Dozing Report Checked. Arrange Staff In House Training. Attend seminars and represent the company as per invitations. Attend In House Fire and Safety Courses, Seminars and drills and Collaborate Mills Fire and Safety Department in Emergencies. Timely Submitted all correspondence reports and mails discussed b / w Higher Management and C.E.O and maintain its record properly. Timely Checked Energy Saving Activities in all required areas of Production, Planning and Maintenance and arrange meeting to achieved all targets for save Water, Chemical, Steam, Condensate Water, Raw Water, Processes Water and Cooling Systems Water, Machine Load and all Auxiliaries Load properly manage and day time energy saving Issues.

OCTOBER 1999 / APRIL 2000 ERECTION ENGINEER at SIDDIQ SONS DENIM MILLS LIMITED (PROCESSING UNIT).

Carried Out 4EK Series Wet Mani Fold Caterpillar Gas Engines Installation and erection work. Installed Jacket Water Heat Recovery and Exhaust Heat Recovery
System. In Jacket Water Heat Recovery Installed Plate Type GEA Heat Exchanger and Motorize Control Actuator Valve with Barber Column Module 8000 attachments.

NOVEMBER 1996 / MARCH 1999 DEPUTY MANAGER POWER HOUSE SPINNNG UTILITY at SAPPHIRE TEXTILE MILLS UNIT # 2 S.I.T.E KOTRI

Manage 4EK Series Wet Manifold Caterpillar Gas Engines Perform 3RC Series 625 K.W Caterpillar Gas Engine Installation and Erection with Power panel and Control Panel Installation work. Manage Power Plant Operation and all Maintenance work.Plan Schedule Maintenance as per O.E.M Intervals. Carry out Fault finding and rectification work perform and perform all Predictive Maintenance in time. Planed Top -End Overhauling and Major Over Hauling as per
O.E.M Time frame S.M.U. Manage all required purchasing as per power plant demand and requirement. Maintain inventory records. Negotiate with Fabricators and vendors for outdoor maintenance and repairing work.Arrange all required Parts and Auxiliaries in stock inventory.

MARCH 1994 / OCTOBER 1996 SHIFT INCHARGE at LUCKY ENERGY PRIVATE LIMITED F.B AREA KARACHI

4EK – Series Wet – Manifold Caterpillar Gas Engines
965 K.W X 11 = 10.725 M.W Captive Power Plant Installation.
All Gas Engine Erection on given Pads or Foundation with proper Isolators balancing and fixed all Attachments like Exhaust Mufflers Power and Control Panels cabling and erection work with All Auxiliaries equipment Cooling Towers, Water Softening Plant, Engine Lubricating Oil Storage and Supply System, K&SB Raw Water Circulating Pumps, Siemens H.T Transformer and Johnson’s and Philips Oil Circuit Breakers Trolleys Switch gear Installation and distribution work perform With all safety measures. All operation and Predictive Maintenance perform. Maintain store inventory. Maintain all log sheets and reports per forma.Maintain Daily Generation Record on log books

OCTOBER 1990 / JANUARAY 1994 ASSISTANT ENGINEER POWER HOUSE at REGENT TEXTILE MILLS LIMITED S.I.T.E KARACHI

* 3RC Series Caterpillar Gas Engines 625 K.W X 3 = 1.950 M.W Captive Power
Plant Operation and Maintenance work carried out.
* Carry out all Schedule maintenance and predictive maintenance.
* Carry out Top – End Overhauling of Caterpillar 3RC Series Gas engines.
* Carry out In Frame Maintenance Overhaul.
* Carry out Major Overhauling.