Kili – Abra
• Assist installation of hydraulic ram pump to provide irrigation 5m above river level.
• Led community meetings with multiple stakeholders to evaluate the impacts of the existing micro hydro power system and conduct a needs assessment for the upgrade works.
Habag, Homonhon Island – Eastern Samar
• Designed turbines for the proposed micro hyro power plant based on fieldwork and technical survey. Worked as part of a multidisciplinary team to complete the mechanical chapters of the feasibility study.
• Completed a post implemention evaluation for both the technical and social aspects of two water systems installed by SIBAT in 2016.
Project management, NAPC (National Anti-Poverty Commission)
• Attended multiple meetings with the project funder and completed administrative documentation.
Solar water pump, Mulalupa – Ifugao
• Lead engineer of the SIBAT staff to condct technical survey to assess viability of implementing a solar water pump and water network pipes. Selected the optimal location for the water pump and solar panels.
• Lead author of the pre feasibilty study provided to the local government unit.
Rehabilitation of micro hydro power system, Lat-ey -Abra
• Assist Senior Mechanical Engineer in designing and implementing new T14 cross flow turbine.
• Led community meeting to determine labour costs and schedule for construction