Photo

BENEDICT F. HUFANA BUILDING ELECTRICIAN

Philippines
Emergency LightFDASFire Suppression System & BACS)Grounding SystemGrounding System).Installation of Distribution Board and Main Distribution BoardLay-outing & Piping(LightingPerforms continuity & insulation resistance (IR) test for cables and motor windings for fire pump motors.PowerPower and Air Condition)Power)Responsible in Cable PullingSupervision of electrical works roughing installation and wiring installation (LightingTermination and Final Dressing of Cable and Distribution Board and Main Distribution BoardsVAC SystemWiring Installation (Lighting Emergency LightWiring Installation of Controls for ACCU’S & FCU’S including Trouble Shooting

BENEDICT L. HUFANA

24 SITIO BANGEN, CABARITAN SUR, NAGUILIAN, LA UNION, PHILIPPINES 2511

CELLPHONE NO. +639207864672

E-MAIL ADDRESS: [email protected]

PROFESSIONAL OBJECTIVES:

To work in a company that will fit my qualifications that allow me to use my Intellectual abilities, communication skills and quantitative knowledge. And be a part of the companies’ success all throughout.

 

 

 

❑ PROFESSIONAL EXPERIENCE:

 

Company: ALCCO GROUP OF COMPANIES

Inclusive Date: July 18,2019-up to present

Project: Sub- Contractor

Convention Hall Training Center

DMMMSU-NLUC

Sapilang, Bacnotan, La Union

 

Position:

Electrical Foreman

 

Job Summary:

Assigned to all Electrical works Lay Outing , Piping for Lighting, Power,

Emergency Light and Air Conditioning and Istalllation of Distribution Board and Cable Pulling

 

Duties and Responsibilities:

Lay-outing & Piping(Lighting,Emergency Light,Power and Air Condition)

Wiring Installation (Lighting Emergency Light,Power)

Wiring Installation of Controls for ACCU’S & FCU’S including Trouble Shooting

Installation of Distribution Board and Main Distribution Board

Responsible in Cable Pulling,Termination and Final Dressing of Cable and Distribution Board and Main Distribution Boards

 

 

Company: CEM ESTERO SPA

Inclusive Date: September 6, 2016 to March 18, 2018

Project: Doha Metro-Red Line North Underground-AL QASSAR STATION

MAIN CONTRACTOR: ISG JV

SUB CONTRACTOR : TCS JV

Doha, State of Qatar

 

Position:

Electrical Foreman

Job Summary:

Assigned to all electrical works (Cable tray installation, Power supply for power sockets & lightings, CRAC units, FCU, VAC system, FDAS, Fire Suppression System, BACS, Grounding System and performs all testing for cables.

 

 

 

 

 

 

Duties and Responsibilities:

 

Perform tool box meeting before start of works.

Supervision of electrical works roughing installation and wiring installation (Lighting, Power, VAC System, Grounding System, FDAS, Fire Suppression System & BACS).

Ensures the implementation of the electrical plans on area of responsibility.

Interprets and execute plans and specification.

Responsible to make decision and to be coordinated with electrical supervisor for the implementation of site condition of electrical works.

Coordination of the plan that will be implemented to the other MEP foremen.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and motor windings for fire pump motors.

Coordinates directly with the QC Inspector before offering inspection to GENCON any comments during pre-inspection with regards to the type of installation to be rectified accordingly to the specification.

 

Company: ADVANCE VISION FOR ELECTRO-MECHANICAL

Inclusive Date: February 07, 2014 to July 29, 2015

Jeddah, Kingdom of Saudi Arabia

 

Project : King Abdulaziz International Airport

MAIN CONTRACTOR: Saudi Binladin Group of Companies

SUB. CONTRACTOR : Advance Vision

Jeddah , Kingdom of Saudi Arabia

 

Position:

Electrical Foreman

 

Job Summary:

Assigned to all electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, termination of LV & MV distribution System & perform continuity and insulation resistance (IR) test.

 

 

Duties and Responsibilities:

 

Supervision of electrical works roughing installation and wiring installation (Lighting, Power, Grounding System).

Ensures the implementation of the electrical plans on area of responsibility.

Interprets and execute plans and specification.

Responsible to make decision and to be coordinated with electrical supervisor for the implementation of site condition of electrical works.

Coordination of the plan that will be implemented to the other MEP foremen.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and motor windings for fire pump motors.

Coordinates directly with the QC Inspector before offering inspection to GENCON any comments during pre-inspection with regards to the type of installation to be rectified accordingly to the specification.

 

 

 

 

 

 

 

Company: ASIA REGIONAL TELECOMMUNICATION SERVICE, INC.

 

Inclusive Date: March 26, 2012 to January 28, 2014

Fort Bonifacio, Taguig City, Manila

Position:

Installer / Rigger

 

Job Summary:

Assigned to cell site tower installation.

 

 

 

Duties and Responsibilities:

 

Responsible in measuring the height of cell site towers (guyed mast, monopole, 3 legged, 4legged).

Take panoramic photos of the line signal.

Measures the existing radio frequency antenna (2G-90091800MHz, 3G- 2100MHz, 4G-2500MHz)

Take photoshoot the line of existing radio frequency.

Measures the height of existing microwave.

Take photoshoot the line of existing microwave.

Take the azimuth of existing radio frequency antenna and existing microwave.

Take the GPS (longitude and latitude) of the cell site tower.

Installation of BTS, antenna bracket (expansion 3G) & rectifier.

. Installation of antenna bracket and antenna (expansion 3G antenna).

 

 

Company: SAAD TRADING & CONTRACTING COMPANY

Inclusive Date: February 08, 2009 to April 24, 2011

Al Khobar, Kingdom of Saudi Arabia

Position:

Electrician

 

Job Summary:

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

 

Duties and Responsibilities:

 

Installation of electrical works roughing installation and wiring installation (Lighting, Power, Grounding System & Distribution boards).

Responsible in cable pulling, termination and final dressing of cables in panelboards.

Wiring installation of controls for ACCU’s & FCU’s including trouble shooting.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and including loop test.

Installation of cables trays.

 

 

 

 

Company: HAMTON TRADING AND CONTRACTING COMPANY

Inclusive Date: August 24, 2006 to September 05, 2008

P.O. Box 37965, Doha Qatar

Position:

Electrician

 

Job Summary:

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Cable glanding, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

 

Duties and Responsibilities:

 

Installation of electrical works roughing installation and wiring installation (Lighting, Power & Distribution boards).

Responsible in cable pulling, termination and final dressing of cables in Distribution boards.

Performs continuity & insulation resistance (IR) test for cables and including loop test.

 

 

Company: ACM ENGINEERING SERVICE

Inclusive Date: March 2003 to May 2006

San Fernando, La Union

Position:

Lineman

Job Summary:

Assigned to installation cables and post for primary and secondary including metering.

 

 

 

Duties and Responsibilities:

 

Installation of primary & secondary post

Cable pulling & termination.

Metering installation.

 

 

SCHOLASTIC BACKGROUND:

 

Tertiary Education

Bachelor of Science in Electrical Engineering

Don Mariano Marcos Memorial State University

Mid-La Union Campus

Catbangen, City of San Fernando, La Union

 

Secondary Education

La Union National High School

City of San Fernando, La Union

 

Primary Education

Sevilla Community School

City of San Fernando, La Union

 

 

 

 

 

 

 

 

PERSONAL BACKGROUND:

 

Date of Birth April 15, 1975

Age 44 years old

Civil Status Married

Gender Male

Height 5’8”

Weight 155 lbs.

 

 

 

 

 

 

 

 

 

CHARACTER REFERENCE:

 

Engr. Estela R. Paredes

IIEE-President La Union

ALCOO Group of Companies

 

 

Achille Zampollo

Station Manager-MEP

TCS-JV / ISG JV

Doha Metro-Red Line North Underground-Al Qassar Station

 

 

Engr. Elson H. Yumul

TCS-JV / ISG JV

Doha Metro-Red Line North Underground-Al Qassar Station

 

 

 

 

 

 

 

 

 

BENEDICT L. HUFANA

Applicant

 

 

To work in a company that will fit my qualifications that allow me to use my Intellectual abilities, communication skills and quantitative knowledge. And be a part of the companies’ success all throughout.

 

 

 

❑ PROFESSIONAL EXPERIENCE:

 

Company: ALCCO GROUP OF COMPANIES

Inclusive Date: July 18,2019-up to present

Project: Sub- Contractor

Convention Hall Training Center

DMMMSU-NLUC

Sapilang, Bacnotan, La Union

 

Position:

Electrical Foreman

 

Job Summary:

Assigned to all Electrical works Lay Outing , Piping for Lighting, Power,

Emergency Light and Air Conditioning and Istalllation of Distribution Board and Cable Pulling

 

Duties and Responsibilities:

Lay-outing & Piping(Lighting,Emergency Light,Power and Air Condition)

Wiring Installation (Lighting Emergency Light,Power)

Wiring Installation of Controls for ACCU’S & FCU’S including Trouble Shooting

Installation of Distribution Board and Main Distribution Board

Responsible in Cable Pulling,Termination and Final Dressing of Cable and Distribution Board and Main Distribution Boards

 

 

Company: CEM ESTERO SPA

Inclusive Date: September 6, 2016 to March 18, 2018

Project: Doha Metro-Red Line North Underground-AL QASSAR STATION

MAIN CONTRACTOR: ISG JV

SUB CONTRACTOR : TCS JV

Doha, State of Qatar

 

Position:

Electrical Foreman

Job Summary:

Assigned to all electrical works (Cable tray installation, Power supply for power sockets & lightings, CRAC units, FCU, VAC system, FDAS, Fire Suppression System, BACS, Grounding System and performs all testing for cables.

 

 

 

 

 

 

Duties and Responsibilities:

 

Perform tool box meeting before start of works.

Supervision of electrical works roughing installation and wiring installation (Lighting, Power, VAC System, Grounding System, FDAS, Fire Suppression System & BACS).

Ensures the implementation of the electrical plans on area of responsibility.

Interprets and execute plans and specification.

Responsible to make decision and to be coordinated with electrical supervisor for the implementation of site condition of electrical works.

Coordination of the plan that will be implemented to the other MEP foremen.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and motor windings for fire pump motors.

Coordinates directly with the QC Inspector before offering inspection to GENCON any comments during pre-inspection with regards to the type of installation to be rectified accordingly to the specification.

 

Company: ADVANCE VISION FOR ELECTRO-MECHANICAL

Inclusive Date: February 07, 2014 to July 29, 2015

Jeddah, Kingdom of Saudi Arabia

 

Project : King Abdulaziz International Airport

MAIN CONTRACTOR: Saudi Binladin Group of Companies

SUB. CONTRACTOR : Advance Vision

Jeddah , Kingdom of Saudi Arabia

 

Position:

Electrical Foreman

 

Job Summary:

Assigned to all electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, termination of LV & MV distribution System & perform continuity and insulation resistance (IR) test.

 

 

Duties and Responsibilities:

 

Supervision of electrical works roughing installation and wiring installation (Lighting, Power, Grounding System).

Ensures the implementation of the electrical plans on area of responsibility.

Interprets and execute plans and specification.

Responsible to make decision and to be coordinated with electrical supervisor for the implementation of site condition of electrical works.

Coordination of the plan that will be implemented to the other MEP foremen.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and motor windings for fire pump motors.

Coordinates directly with the QC Inspector before offering inspection to GENCON any comments during pre-inspection with regards to the type of installation to be rectified accordingly to the specification.

 

 

 

 

 

 

 

Company: ASIA REGIONAL TELECOMMUNICATION SERVICE, INC.

 

Inclusive Date: March 26, 2012 to January 28, 2014

Fort Bonifacio, Taguig City, Manila

Position:

Installer / Rigger

 

Job Summary:

Assigned to cell site tower installation.

 

 

 

Duties and Responsibilities:

 

Responsible in measuring the height of cell site towers (guyed mast, monopole, 3 legged, 4legged).

Take panoramic photos of the line signal.

Measures the existing radio frequency antenna (2G-90091800MHz, 3G- 2100MHz, 4G-2500MHz)

Take photoshoot the line of existing radio frequency.

Measures the height of existing microwave.

Take photoshoot the line of existing microwave.

Take the azimuth of existing radio frequency antenna and existing microwave.

Take the GPS (longitude and latitude) of the cell site tower.

Installation of BTS, antenna bracket (expansion 3G) & rectifier.

. Installation of antenna bracket and antenna (expansion 3G antenna).

 

 

Company: SAAD TRADING & CONTRACTING COMPANY

Inclusive Date: February 08, 2009 to April 24, 2011

Al Khobar, Kingdom of Saudi Arabia

Position:

Electrician

 

Job Summary:

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

 

Duties and Responsibilities:

 

Installation of electrical works roughing installation and wiring installation (Lighting, Power, Grounding System & Distribution boards).

Responsible in cable pulling, termination and final dressing of cables in panelboards.

Wiring installation of controls for ACCU’s & FCU’s including trouble shooting.

Check the availability of materials and follow proper utilization of materials.

Performs continuity & insulation resistance (IR) test for cables and including loop test.

Installation of cables trays.

 

 

 

 

Company: HAMTON TRADING AND CONTRACTING COMPANY

Inclusive Date: August 24, 2006 to September 05, 2008

P.O. Box 37965, Doha Qatar

Position:

Electrician

 

Job Summary:

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Cable glanding, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

 

Duties and Responsibilities:

 

Installation of electrical works roughing installation and wiring installation (Lighting, Power & Distribution boards).

Responsible in cable pulling, termination and final dressing of cables in Distribution boards.

Performs continuity & insulation resistance (IR) test for cables and including loop test.

 

 

Company: ACM ENGINEERING SERVICE

Inclusive Date: March 2003 to May 2006

San Fernando, La Union

Position:

Lineman

Job Summary:

Assigned to installation cables and post for primary and secondary including metering.

 

 

 

Duties and Responsibilities:

 

Installation of primary & secondary post

Cable pulling & termination.

Metering installation.

 

 

SCHOLASTIC BACKGROUND:

 

Tertiary Education

Bachelor of Science in Electrical Engineering

Don Mariano Marcos Memorial State University

Mid-La Union Campus

Catbangen, City of San Fernando, La Union

 

Secondary Education

La Union National High School

City of San Fernando, La Union

 

Primary Education

Sevilla Community School

City of San Fernando, La Union

 

 

 

 

 

 

 

 

PERSONAL BACKGROUND:

 

Date of Birth April 15, 1975

Age 44 years old

Civil Status Married

Gender Male

Height 5’8”

Weight 155 lbs.

 

 

 

 

 

 

 

 

 

CHARACTER REFERENCE:

 

Engr. Estela R. Paredes

IIEE-President La Union

ALCOO Group of Companies

 

 

Achille Zampollo

Station Manager-MEP

TCS-JV / ISG JV

Doha Metro-Red Line North Underground-Al Qassar Station

 

 

Engr. Elson H. Yumul

TCS-JV / ISG JV

Doha Metro-Red Line North Underground-Al Qassar Station

 

 

 

 

 

 

 

 

 

BENEDICT L. HUFANA

Applicant

 

 

 

Education

2002 BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING at DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY MID-LA UNION CAMPUS

Due to lack of money I spent my time as a working student just to reached out the degree that I want.

Experience

JULY 18, 2019 UP TO PRESENT Electrical Foreman at ALCCO GROUP OF COMPANIES

Assigned to all Electrical works Lay Outing , Piping for Lighting, Power,
Emergency Light and Air Conditioning and Istalllation of Distribution Board and Cable Pulling

September 6, 2016 to March 18, 2018 ELECTRICAL FOREMAN at CEM ESTERO SPA (Doha, state of Qatar)

Assigned to all electrical works (Cable tray installation, Power supply for power sockets & lightings, CRAC units, FCU, VAC system, FDAS, Fire Suppression System, BACS, Grounding System and performs all testing for cables.

February 07, 2014 to July 29, 2015 ELECTRICAL FOREMAN at ADVANCE VISION FOR ELECTRO-MECHANICAL(Jeddah, Kingdom of Saudi Arabia)

Assigned to all electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, termination of LV & MV distribution System & perform continuity and insulation resistance (IR) test.

March 26, 2012 to January 28, 2014 INSTALLER/RIGGER at ASIA REGIONAL TELECOMMUNICATION SERVICE, INC.

Assigned to cell site tower installation.

February 08, 2009 to April 24, 2011 ELECTRICIAN at SAAD TRADING & CONTRACTING COMPANY(Al Khobar, Kingdom of Saudi Arabia)

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Grounding / Earthing System, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

August 24, 2006 to September 05, 2008 ELECTRICIAN at HAMTON TRADING AND CONTRACTING COMPANY(P.O. Box 37965, Doha Qatar)

Assigned to electrical works (Cable tray installation, roughing installation for Powers & lightings, Cable glanding, Cable laying, Installation & termination of Distribution boards & perform loop test, continuity and insulation resistance (IR) test.

March 2003 to May 2006 LINEMAN at ACM ENGINEERING SERVICE

Assigned to installation cables and post for primary and secondary including metering.