FRED G. BONIAO
#4002 Magiliw street, Duquit, Dau,
Mabalacat, Pampanga Philippines 2010
Phone no. 09217269757/09217269755
Email address: [email protected]
Facebook account: [email protected]
Skype account: Fred_boniao
Position applied: Welder
CAREER OBJECTIVE:
To serve my employer to the best that I can do with widen knowledge, skills, and capabilities in promoting the mission and vision of the company.
EMPLOYMENT HISTORY:
Work experienced: 9 years and 8 months
SODENO Shipbuilding Co., Ltd.
(June 10, 2014 to June 10, 2019)
SMAW/FCAW welder
Shipyard Project, Tobishima-mura, Ama-gun, Aichi-ken, Japan
• Production welder of bulk carrier and tank accommodation such as cabin, deck, elevator, cadet room, laundry room, oiler room, and etc..
• Full welding of chimney of the bulk carrier.
• Full welding of plate and pipe materials in all positions with thickness of 5mm to 40mm in groove and fillet weld.
• Can perform cutting and gouging.
• Able to use acetylene.
• Can repair of any welding defects.
• Full welding of plate and pipe supports such as braces, brackets, pad plates, pieces, L-angle, I-beam and etc..
• Can read and interpret in basic drawings.
• Maintaining the proper handling of tools and consumables/housekeeping before and after works.
• Consumables used E-7016, DW100-E71T-1C, DW200.
Power Team Builder’s Inc.-
(August 19, 2013 to April 20, 2014)
PIPE welder
Fire Protection Project , Avida Centera Tower, Mandaluyong City, Manila
• Assist/full weld of pipe joint sizes 2” to 6” dia-inch in all positions by TIG/SMAW process.
• Assist/full weld of flange to pipe.
• Assist/full weld of braces and brackets of pipe.
• Housekeeping before and after works.
• Consumables used E-6011, E-6013 and ER-70S2 filler wire.
EEI Corporation
(May 29, 2011 to June 1, 2013)
PLATE Welder carbon/stainless
THPAL-Taganito High Pressure Acid Leach Project, Surigao del Norte
• Assist/full weld of tanks and thickeners by SMAW process.
• Assist/full weld of tank supports such as anchor chair, wind girder, top angle, pad plate, and etc.
• Assist/full weld of flange to pipe by TIG/SMAW process.
• Assist/full weld of structural, railings, checkered plate, I-beam, braces, and brackets
• Maintaining the proper handling of tools, housekeeping before and after works.
• Consumables used E-7018 3.2mm/2.6mm and ER-70S2 filler wire.
EEI Corporation/ARCC
(December 19, 2007 to November 19, 2009)
PIPE welder
SHARQ 3rd Ethylene Plant Expansion Project, Jubail City, KSA
• Assist/full weld of groove and fillet weld of pipe in all positions by SMAW process.
• Assist/full weld of pipe supports like pipe guide, pipe shoes, angle bars, brackets and braces.
• Housekeeping before and after works.
• Consumables used E-7018 2.6 mm/3.2 mm
EDUCATIONAL BACKGROUND:
Tertiary:
• 1997-2001
• BSA-Bachelor of Science in Accountancy
• Southern Capital Colleges, Oroquieta City, Misamis Occidental
Secondary:
• 1992-1996
• Misamis Occidental National High School
• Oroquieta City, Misamis Occidental
Primary:
• 1986-1992
• Talic Elementary School
• Oroquieta City, Misamis Occidental
PERSONAL DATA:
Date of birth :February 1, 1980
Place of birth :Oroquieta City
Nationality :Filipino
Gender :Male
Civil status :Married
Religion :Philippine Community Church
Weight :56 kls.
Height :5”4’ ft.
Father’s name :Angelito P. Boniao
Mother’s name :Loreta E. Garbo (deceased)
Languages Spoken & Writing :Cebuano, Tagalog, English & Nihonggo
SKILLS:
• Computer literate Microsoft excel/word, welding and driving.
CHARACTER REFERENCES:
1. Sasaki Noriaki
Welding Forman
Sodeno Shipbuilding co., ltd.
+819051082826
2. Ronnie Macaso
Forman Fabricator
Sodeno Shipbuilding co., ltd.
+819091905013
3. William Bautista
Shipyard fitter
Sodeno Shipbuilding co., ltd.
+819098980566
Boniao, Fred G.
Applicant