WORK EXPERIENCE
ASST. OPERATIONS MANAGER
ZONE 93 FOODS CORPORATION
LIMA Square, LIMA Technology Center, Malvar, Batangas
October 4, 2013 – January 15, 2015
· Handles the maintenance of the machine equipments and building fixtures
· Supervises the logistic operations of the store orders for deliveries
· Works also as a delivery driver for bulk orders of deliveries at different places
· Audit daily sales of the store and report to the Operations Manager
CONSTRUCTION SAFETY OFFICER
XYST BUILDERS, Retiro, Blumentritt, Manila
BIG 30 PIZZA & PASTA
November 15, 2012 – May 15, 2013
· Gives safety precautions with their work by having tool box meeting with them
· Implement usage of personal protective equipments for their safety and protection towards their scope of work
· Implement safety signages at work areas for safety warnings for the workers
· Make reports for daily safe manhours of workers to achieve zero accident.
· Conduct safety inspection at site
· Implementation of safety rules and regulation
· Inspection of safety equipment and personal protective equipment
· Conduct accident investigation and recommend mitigating controls.
SAFETY OFFICER
Manswork Builders Corp., Scout Tuazon, Quezon City, MM
August 02, 2012 – October 31, 2012
LIMA PARK PAVILION PROJECT
· Handles tool box meeting regarding safety procedures on desired scope of work
· See to it that workers are wearing personal protective equipments with their field of work
· See to it that safety signages are properly placed in areas that are hazardous and danger to workers
· Conduct safety orientation
· Conduct daily toolbox meeting
· Conduct daily inspection at site
WAREHOUSE SUPERRVISOR/SAFETY OFFICER
NDM Sanchez Builders Dev. Corp., Sto. Tomas, Batangas
August 16, 2011 – January 30, 2012
· Handles the inventory and control of materials and equipments for distribution to projects
· Prepares and request construction materials for the concerns of the desired projects
· Supervises manpower distribution on desired works at the warehouse premises
· Supervises and control of distribution of ready mix cement from batching plant to desired projects
· Encodes data information for the inventory of construction materials
· Handles tool box meeting regarding safety procedures on desired scope of work
· Handles the inventory and control of personal protective equipments given to construction workers
· Identifying available hazards and recommend control
· Conduct safety and health orientation
PHYSICAL PLANT DEVELOPMENT COORDINATOR
St. Mary of the Woods School, Brgy. San Isidro, Makati City, MM
October 2, 2008 – July 31, 2011
· Supervises maintenance and janitorial services of the school building
· Handles the inventory and control of materials and equipments of the school
· Supervises the audio system of the school
· Handles the repairs and maintenance of the school
· Supervises and manage the venue setups of school events and programs
· Reports to the Vice President – Finance about the budget proposal for school improvements
MAINTENANCE SUPERVISOR
Eibron Garden, Dr. A. Santos Ave., Sucat, Pque City
May 15, 2005 – November 16, 2007
· Maximize work with balanced distribution of manpower
· Sets time schedule upon each variety of wok
· Prepares and control weekly budget expenditures with regards to maximize accomplishment of manpower output on desired projects
SITE SUPEVISOR
AP SILVA CONSTRUCTION, Brgy. Poblacion, Padre Garcia, Batangas
March 05, 1994 – April 30, 2005
· Handles and supervises daily work routine of construction workers according to their given construction tasks
· Prepares requisition and purchase of construction materials with the desired scope of project
· Gives work schedules to the workers with regards to the projected time table to meet completion date of project.
· Reports to the Project Engineer weekly accomplishments and control of materials and equipments for the desired project
PRODUCTION MANAGER
Corazon V. Vergara Garments, Brgy. Poblacion, Padre Garcia, Batangas
January 10, 1987 – February 15, 1994
· Balanced issuing and control of children’s wear to different sub-contractors and in-plant production
· Supply sewing specifications to sewers with compliance to quality standards
· Maximize production volume with distribution of manpower
· Minimize production costs in consonance to maximize work volume
INVENTORY CONTROL/MAINTENANCE SUPERVISOR
Unirock Const. Corp., Brgy. Concepcion, Marikina City, MM
August 10, 1983 – December 30, 1986
· Control of daily consumption of oil and lubricants and spare parts of dump trucks and heavy equipments
· Check and balance of purchase of spare parts for cost control
· Prepares maintenance schedules for dump trucks and heavy equipments for operating procedures
· Analyze income output of production of dump trucks and heavy equipments with regards to minimization and control of operating expenses
SEMINARS/TRAINING ATTENDED:
CONSTRUCTION SAFETY TRAINING
Certificate of Completion: October 17 – 21, 2011
Department of Labor and Employment
Occupational Safety and Health Center
OSHC Complex, North Avenue cor. Agham Road
Diliman, Quezon City, MM
PERSONAL DATA:
DATE OF BIRTH : October 13, 1961
CIVIL STATUS : Married
SPOUSE’ NAME : Eleanor G. Pedrosa
SSS NUMBER : 03-7490247-8
TIN NUMBER : 198-954-444
EDUCATION:
Tertiary B.S. Industrial Management Engineering
De La Salle University
Taft Avenue, Metro Manila, Phillippines
1978 – 1983
Secondary St. Andrew’s School
Brgy. La Huerta, Parañaque, Metro Manila, Phillippines
1974 – 1978
Primary St. Anthony School
Singalong, Metro Manila, Phillippines
1968 – 1971
Sta. Rita College
Sucat, Parañaque, Metro Manila, Phillippines
1971 – 1974
REFERENCES:
Engr. Apolonio P. Silva
AP Silva Construction
Poblacion, Padre Garcia, Batangas, Philippines
Mr. MeynardoDimaculangan
Brgy. Chairman
Pinagkurusan, Alitagtag, Batangas, Philippines
SKILLS:
· Computer Literate
· Driving