Photo

Eduardo V. Vergara Construction Safety Officer

Canada
Computer LiterateDriving

WORK EXPERIENCE

 

ASST. OPERATIONS MANAGER

ZONE 93 FOODS CORPORATION

LIMA Square, LIMA Technology Center, Malvar, Batangas

October 4, 2013 – January 15, 2015

·         Handles the maintenance of the machine equipments and building fixtures

·         Supervises the logistic operations of the store orders for deliveries

·         Works also as a delivery driver for bulk orders of deliveries at different places

·         Audit daily sales of the store and report to the Operations Manager

 

CONSTRUCTION SAFETY OFFICER

XYST BUILDERS, Retiro, Blumentritt, Manila

BIG 30 PIZZA & PASTA

November 15, 2012 – May 15, 2013

·         Gives safety precautions with their work by having tool box meeting with them

·         Implement usage of personal protective equipments for their safety and protection towards their scope of work

·         Implement safety signages at work areas for safety warnings for the workers

·         Make reports for daily safe manhours  of workers to achieve zero accident.

·         Conduct safety inspection at site

·         Implementation of safety rules and regulation

·         Inspection of safety equipment and personal protective equipment

·         Conduct accident investigation and recommend mitigating controls.

 

SAFETY OFFICER

Manswork Builders Corp., Scout Tuazon, Quezon City, MM

August 02, 2012 – October 31, 2012

LIMA PARK PAVILION PROJECT

·         Handles tool box meeting regarding safety procedures on desired scope of work

·         See to it that workers are wearing personal protective equipments with their field of work

·         See to it that safety signages are properly placed in areas that are hazardous and danger to workers

·         Conduct safety orientation

·         Conduct daily toolbox meeting

·         Conduct daily inspection at site

 

 

 

WAREHOUSE SUPERRVISOR/SAFETY OFFICER

NDM Sanchez Builders Dev. Corp., Sto. Tomas, Batangas

August 16, 2011 – January 30, 2012

·         Handles the inventory and control of materials and equipments for distribution to projects

·         Prepares and request construction materials for the concerns of the desired projects

·         Supervises manpower distribution on desired works at the warehouse premises

·         Supervises and control of distribution of ready mix cement from batching plant to desired projects

·         Encodes data information for the inventory of construction materials

·         Handles tool box meeting regarding safety procedures on desired scope of work

·         Handles the inventory and control of personal protective equipments given to construction workers

·         Identifying available hazards  and recommend control

·         Conduct safety and health orientation

 

PHYSICAL PLANT DEVELOPMENT COORDINATOR

St. Mary of the Woods School, Brgy. San Isidro, Makati City, MM

October 2, 2008 – July 31, 2011

·         Supervises maintenance and janitorial services of the school building

·         Handles the inventory and control of materials and equipments of the school

·         Supervises the audio system of the school

·         Handles the repairs and maintenance of the school

·         Supervises and manage the venue setups of school events and programs

·         Reports to the Vice President – Finance about the budget proposal for school improvements

 

MAINTENANCE SUPERVISOR

Eibron Garden, Dr. A. Santos Ave., Sucat,  Pque City

May 15, 2005 – November 16, 2007

·         Maximize work with balanced distribution of manpower

·         Sets time schedule upon each variety of wok

·         Prepares and control weekly budget expenditures with regards to maximize accomplishment of manpower output on desired projects

 

SITE SUPEVISOR

AP SILVA CONSTRUCTION, Brgy. Poblacion, Padre Garcia, Batangas

March 05, 1994 – April 30, 2005

·         Handles and supervises daily work routine of construction workers according to their given construction tasks

·         Prepares requisition and purchase of construction materials with the desired scope of project

·         Gives work schedules to the workers with regards to the projected time table to meet completion date of project.

·         Reports to the Project Engineer weekly accomplishments and control of materials and equipments for the desired project

 

 

PRODUCTION MANAGER

Corazon V. Vergara Garments, Brgy. Poblacion, Padre Garcia, Batangas

January 10, 1987 – February 15, 1994

·         Balanced issuing and control of children’s wear to different sub-contractors and in-plant production

·         Supply sewing specifications to sewers with compliance to quality standards

·         Maximize production volume with distribution of manpower

·         Minimize production costs in consonance to maximize work volume

 

INVENTORY CONTROL/MAINTENANCE SUPERVISOR

Unirock Const. Corp., Brgy. Concepcion, Marikina City, MM

August 10, 1983 – December 30, 1986

·         Control of daily consumption of oil and lubricants and spare parts of dump trucks and heavy equipments

·         Check and balance of purchase of spare parts for cost control

·         Prepares maintenance schedules for dump trucks and heavy equipments for operating procedures

·         Analyze income output of production of dump trucks and heavy equipments with regards to minimization and control of operating expenses

 

SEMINARS/TRAINING ATTENDED:

 

CONSTRUCTION SAFETY TRAINING

Certificate of Completion:      October 17 – 21, 2011

Department of Labor and Employment

Occupational Safety and Health Center

OSHC Complex, North Avenue cor. Agham Road

Diliman, Quezon City, MM

 

PERSONAL DATA:

 

DATE OF BIRTH                       :           October 13, 1961

CIVIL STATUS                           :           Married

SPOUSE’ NAME                       :           Eleanor G. Pedrosa

SSS NUMBER                           :           03-7490247-8

TIN NUMBER                           :           198-954-444

 

 

 

 

 

 

 

 

 

 

 

 

 

EDUCATION:

 

Tertiary                       B.S. Industrial Management Engineering

De La Salle University

Taft Avenue, Metro Manila, Phillippines

1978 – 1983

 

Secondary                  St. Andrew’s School

Brgy. La Huerta, Parañaque, Metro Manila, Phillippines

1974 – 1978

 

Primary                       St. Anthony School

Singalong, Metro Manila, Phillippines

1968 – 1971

 

Sta. Rita College

Sucat, Parañaque, Metro Manila, Phillippines

1971 – 1974

 

REFERENCES:

 

Engr. Apolonio P. Silva

AP Silva Construction

Poblacion, Padre Garcia, Batangas, Philippines

 

Mr. MeynardoDimaculangan

Brgy. Chairman

Pinagkurusan, Alitagtag, Batangas, Philippines

 

SKILLS:

·         Computer Literate

·         Driving

Education

June, 1978 - August, 1983 B.S. in Industrial Management Engineering at De La salle University
June, 1974 - April, 1978 Secondary Student at St. AnDrew's School
June, 1968 - April, 1974 Primary Student at Sta. Rita College

Experience

October 2011 - January, 2012 Construction Safety Officer at NDM Sanchez Builders
August, 2012 - October, 2012 Construction Safety Officer at Manswork Builders Corp.
November, 2012 - May, 2013 Construction Safety Officer at XYST Builders
October, 2013 - January, 2015 Asst. Operations Manager at Zone 93 Foods Corp.