Tecnológico 31, Col. Loma Bonita
Uriangato, Gto., 38983, México
Tel. +52 1 445 158 0262 +52 445 120 1819,
e-mail [email protected]
Eduardo Arturo Lomelín B.
Experience
**August 2013 –Actual Independent/Freelance
HR/Recruiting Consultant
· HR/Recruiting Consultant for the offshore personnel requirements
**April 8 – 12- 2013 SGF GLOBAL
INTERPRETER Paraíso, Tabasco
· Simultaneous interpretation / translation at PEMEX workshop “Optimization HP/HT Gas-Condensate Reservoirs Workshop”
**August 2011 – March 2013 TRESE / GSP
INTERPRETER Cd. Del Carmen, Camp.
· Interpreter on board the JU ATLAS rig. Translate documents; assist the toolpusher, crane operators in various issues. Interpreter to the OIM during the meetings with Pemex.
**2010-March2011 Bergesen Worldwide Offshore Mexico
Offshore Personnel HR Manager Cd. Del Carmen, Camp.
· Responsible of the recruiting, selection and hiring the offshore personnel for the FPSO Yùum K’ak’ Náab as well as the training, competence and personnel logistics, negotiate with Secc. 47 of Pemex Union.
**January 09 – December 09 Weatherford Drilling International
Recruiter for North & South America Houston/Poza Rica, Ver. Mexico
· Responsible of recruiting the adequate personnel for the operation of the drilling rigs in the different projects of the company throughout the American continent and have control on medical exams, training and personnel logistics.
**March – December 2008 Larsen Oil & Gas (SS Petrolia Rig)
INTERPRETER Cd. Del Carmen, Camp. Mexico
· Interpreter on board the SS Petrolia rig. Translate documents; assist the toolpusher, crane operators in various issues. Interpreter to the OIM during the meetings with Pemex.
· Responsible of the structural corrosion survey of the rig (Subsea and aerial structures).
**2003- Jan. 2008 Iner Servicios, S. de R.L. de C.V.
(MacGregor Energy Services, RBG, Ltd.)
HR Manager Houston/Cd. Del Carmen, Camp. Mexico
· Human Resources Manager, main responsibilities were to recruit, interview and hire the personnel required by our clients according to the given profile. Dolphin Drilling, 130 employees on two drilling rigs (SS Bulford Dolphin & SS Borgny Dolphin) and office on shore as well to have control on the medical exams, training and competence, negotiate with Secc. 42 of Pemex Union. Keppel Offshore & Marine USA, 104 employees for the construction of two living quarter platforms, negotiate with Secc. 47 of Pemex Union, Tecnogolfo, 8 employees.
**2002 Concretos Tancol, S.A. de C.V.
Corrosion Engineer Altamira, Tamps. Mexico
· Analysis and evaluation of corrosion problems on concretes and structural steels. Developed specifications to avoid and diminish this phenomenon.
**2001 / 2002 Bufete de Mantenimiento Predictivo Industrial, S.A.
Corrosión Engineer Cd. Del Carmen, Camp.
· Corrosion supervision on the fabrication of 3 measuring skids for sour gas at the PEMEX complex at Cd. Pemex, Tab.
· Developed the basic engineering for the sour water treatment system at the Pemex compression station at Atasta, Camp.
· Designed the sewage water treatment system for the Pemex compression station at Atasta, Camp. and developed the operation philosophy.
· Developed the operational philosophy of the oily water treatment system.
**1998-2001 Enron Offshore Houston/Tampico, México
Site Q.C./Document Control Manager
· Keep control of the QC & Documents for 4 projects (CIGSA/ENRON) (EPC 18, 24, 37 & 38) of the PEMEX Cantarell Project, attending all document problems, non- conformances & CARs (Corrective Action Reports) on the following disciplines; mechanical-structural, process piping, electrical & instruments as well as materials and give solution to them, revise procedures, control of all material & equipment received, to verify that it is what was specified and the condition in which it is received for the offshore production platform Akal TJ, living quarter platforms Akal B, Akal L, Akal CO2, Akal JO2, Akal N & Nohoch A.
**1996- 1998 Incoras International Houston, TX.
Corrosion Engineer
§ Corrosion close interval survey on pipelines for Tenneco, Columbia, Oxichem, Enron Power, Northwest & Southwest Gas, Texaco and Shell.
§ Responsible of the close interval, DCVG and radio detection surveys done to the Gas & Oil companies at Argentina, Chile, Bolivia & Peru, Refinería del Norte, Litoral Gas, Ecogas, Yacimientos Petroliferos Federales (YPF) and Hidrocarburos Argentinos.
§ Responsible of the structural corrosion survey to different steel structure bridges in Peru and Chile.
**1994-1995 R. Garza & Co. Houston, TX.
Corrosion Engineer
· Quality Control specialist during the fabrication & corrosion protection of the 36”Æ, 20”Æ & 10”Æ pipeline for El Paso Natural Gas Co., at Midwest Pipe Coating Co., California Steel Mill Co., Midwestern Pipe Line Services.
**1991-1994 Agronitrogenados, S. A. Coatzacoalcos, Ver.
(FERTIMEX)
Maintenance Engineering Manager
§ Responsible of the coordination of maintenance engineering of this chemical plant, in the different disciplines, (Mechanical, Instruments, Civil & Electrical) being the sole responsible of the quality of the materials used for the corrosion protection of this plant.
§ Responsible of the corrosion protection of the complete plant during the reconstruction works of the phosphates, phosphoric acid, nitric acid, urea, chlorine & ammonium nitrate plants after the explosion at Pemex Pajaritos during 1991.
§ Responsible of the rehabilitation of the ammonium nitrate plant reactor.
§ Responsible of the replacement of the natural gas, CO2 & ammonia aerial pipelines.
§ Responsible of the internal rehabilitation and corrosion maintenance of the two (2), 21m Æ x 80m high, urea prilling concrete towers.
§ Developed the general specifications for the corrosion protection for all plant facilities.
**1987 – 1991 Polibrid de México, S. A. Coatzacoalcos, Ver.
Technical Manager
· Responsible of the development of corrosion protection specifications for the company’s clients.
· Responsible of the works done at:
1. Celanese Mexicana (Cangrejera & Cosoleacaque)
2. Cloro de Tehuantepec
3. Industrias Resistol Unidad Lechería (Monsanto)
4. Fertilizantes Mexicanos Unidad Coatzacoalcos & Nitrogenados.
5. PEMEX Offshore (Nohoch & Abkatum complexes)
6. Ministry of Communication (Tampico Bridge)
7. Mexicana de Papel Periódico
8. Astilleros Unidos de Mazatlán (2 tug boats) (shipyard)
9. Astilleros Unidos de Veracruz (shipyard) (Cantarell & Akatum Pemex vessels)
**1982 – 1987 Amercoat Mexicana, S.A. Coatzacoalcos, Ver.
(AMERON)
Corrosion Engineer
· Responsible of the development of specifications for the clients of my area of responsibility:
1. Petroleos Mexicanos
2. Marine Industry (ship yards, marine transportation companies, Mexican Navy)
· Responsible of works done at the main petrochemical complexes in Mexico as well as offshore works.
1. Pipeline construction and its corrosion protection at the Nuevo Pemex petrochemical complex & Cloro de Tehuantepec.
2. Reconstruction and maintenance of neutralization ponds and evaporating lagoons in chemical & petrochemical complexes.
3. Installation of FRP piping and the interconnections with RO filters, pumps and well injection system, sand blast and coating of the lower services deck area at the Abkatum offshore oil field.
4. Sand blast and coating of two tugboats in the facilities of Astilleros Unidos de Veracruz, S.A. ship yards.
Education
1975- 1980 National Autonomous University of Mexico Mexico City
§ Chemical Engineering (Not Graduated)
Courses
45Hr.-.-.-.-Sales Course 1982 Amercoat
180Hr.-.-.- FRP Piping Fabrication & Use Course 1982 Amercoat
90Hr.-.-.-.-Corrosion Course 1983 Amercoat
45Hr.-.-.-.-PET & PVC Liner Fabrication & Use Course 1986 Amercoat
90Hr.-.-.-.-Communication & Leadership Course 1991 Fertimex
45Hr.-.-.-.-Microvalleys Rehabilitation Course 1998 Guanajuato Ministry of Agriculture
32Hr.-.-.-.-Basic Safety at Offshore Facilities 2008
24Hr.-.-.-.-Rig Pass 2008 Larsen Oil & Gas
16Hr.-.-.-.-Defensive Driving 2009 Weatherford Drilling International
Language Skills
Computer Skills
100% English & Spanish (Translate, write, read & speak)
Word, Excel, PowerPoint, Publisher, Works 4, Internet