Photo

Eduardo Castañeto Jr. QAQC Supervisor at Zamil Architectural Industries

Saudi Arabia
analytical mind and initiative aptitude towards work. * Can work with minimum supervision under pressure.efficiency and cost reduction programs. * Strong background on process improvementExcel and Powerpoint. * Passed Electrical Engineering Government Licensure Exam in the Philippines. * Can communicate to different type of people. * Has a high sense of urgencyFMEA and Poka-Yoke. * Proficiency in MS WordISO 14001management and control. * Certified Quality Auditor (Successfully completed an Auditor Course for ISO 9001: 2008 version in DubaiOHAS set-up and audit. * Knowledgeable in TPMproductivityQC ToolsSPCUAE) * Knowlegeable in ISO 9001

* Extensive background in the following : Structural Glazing Systems – Fabrication of Energy Efficient Architectural glass. Automotive Wires and Cable. * More than 14 years experience on all production related activities with regards to quality, productivity, efficiency and cost reduction programs. * Strong background on process improvement, management and control. * Certified Quality Auditor (Successfully completed an Auditor Course for ISO 9001: 2008 version in Dubai, UAE) * Knowlegeable in ISO 9001, ISO 14001, OHAS set-up and audit. * Knowledgeable in TPM, QC Tools, SPC, FMEA and Poka-Yoke. * Proficiency in MS Word, Excel and Powerpoint. * Passed Electrical Engineering Government Licensure Exam in the Philippines. * Can communicate to different type of people. * Has a high sense of urgency, analytical mind and initiative aptitude towards work. * Can work with minimum supervision under pressure.

Education

1989 - 1994 Bachelor of Science in Electrical Engineering at Far Eastern University, Manila, Philippines

Competed in Regional Quiz Shows for Electrical Engineering.

1985 - 1989 High School at St. James School Quezon City, Manila, Philippines.

Experience

June 1995 - Present QAQC Supervisor at Zamil Architechtural Industries, Dammam, Saudi Arabia

June 9, 2015 – Present ZAMIL ARCHITECTURAL INDUSTRIES
1st Industrial City. Dammam, KSA

QAQC SUPERVISOR
Riyadh, KSA
March 20, 2017 – January 14, 2018 / April 15, 2018 – Present
Job Description
 Acting Head of the Quality Department for the overall projects of ZAI in Riyadh and it’s neighboring provinces/districts.
 Ensures quality of In-coming Materials and Installation.
 Facilitate Inspection & Submittal of Materials/Installation Progress for Approval (MIR, IRQ)
 Resolves issues on site regarding customer complaints, NCR’s and other Quality related problems.
 Works with cross functional departments to address and resolve quality issues and problems.
 Conducts root cause analysis for NCR’s.
 Continually contributes in the improvement of QAQC department.

QAQC SUPERVISOR
Dammam, KSA
June 9, 2015 – March 19, 2017 / January 15, 2018 – April 14, 2018
Job Description
 Ensures quality in Incoming, In-process and Final Inspection.
 Resolves issues on site regarding customer complaints, NCR’s and other Quality related problems (All ZAI Projects).
 Visit Project Sites for inspections before Site Handover and work done per invoices (All ZAI Projects)
 Establish, enhance and updates work related documents in conformance to international standards.
 Maintain and control the calibration of inspection, measuring and test equipment’s.
 Works with cross functional departments to address and resolve quality issues and problems.
 Lead Internal Quality Auditor.
 Conducts root cause analysis for NCR’s.
 Continually contributes in the improvement of QAQC department.
 Handled the completion of Unfinished Projects: (Management, Surveying, Reporting, Coordination, Closing)
1. RC Villas, Al-Khifa Project, Jubail KSA (300+ Villas)
2. Dammam University Hospital, Dammam KSA (A General Hospital)

August 2007 - September 2013 QAQC Supervisor at Emirates Glass LLC, Dubai, United Arab Emirates

August 2007 – September 2013 EMIRATES GLASS L.L.C.
Al Quoz, Dubai, United Arab Emirates

QAQC SUPERVISOR
Job Description
 Supervise and evaluate performance of Quality Inspectors.
 Establish work related documents (work standards and work instructions) in conformance to international standards.
 Assists the QAQC Manager in formulating and implementing Department Quality Objectives.
 Conducts root cause analysis of quality problems and develops and implements corrective/preventive measures.
 Maintains and controls inspection, measuring and test equipment, ensuring that these equipment’s are calibrated periodically and calibration records are maintained.
 Lead Internal Auditor.
 In-charge of Quality Circle/Kaizen in the factory. Organize monthly presentations of improvements in Emirates Glass and its sister companies (Emirates Float Glass and Saudi American Glass).
 Deals with the quality issues with customers and third party suppliers usually accompanied by visitations of sites and factory.

April 1998 - October 2006 Sr. Production Supervisor at Hitachi Cable Philippines Inc., Batangas, Philippines

April 1998 – October 2006 HITACHI CABLE PHILIPPINES INC.
Lima Technology Center, Lipa City Batangas

Section : Automotive Wires (Extrusion Process, Color Coating Process, Stranding Process)

SR. PRODUCTION SUPERVISOR
April 1, 2004 – October 31, 2006

PRODUCTION SUPERVISOR
April 1, 2003 – March 31, 2004

Job Description
 Supervises and evaluate performance of Sr. Engineers below.
 Develops systems for ensuring quality, productivity and efficiency.
 Establish work related documents (work standards and work instructions) in conformance to international standards.
 Designs improvement plans / programs on the process and monitor its implementations.
 Perform root cause analysis and formulate / implement corrective and preventive actions.
 Implements cost reduction programs (Value Engineering).
 Applies JIT, 5’S, 3F and Safety practices in the process.
 Ensures positive work attitude and teamwork among subordinates.
 Works with cross functional teams to address and resolve quality, reliability and production line issues and problems.
 Periodic Function :
o Leads internal quality audits.
o Performs subcontractors / suppliers quality system audit.
o Quality Control Circle / Kaizen Leader / Adviser.

Additional Endeavors
 Receives an Ingenuity Award for reducing operating expenses thru elimination of a sub-process. December 2005
Project : Eliminate the use of H20 chiller in extrusion process.
 Receives an award in VEC (Value Engineering for Customers) thru machine modification that doubles production output of Color Coating Process (2nd place). June 2003
Project : Convert color coating machine from one passage to two passage.
 One of the key persons in the development of new products AVSF, AVSS wires thru preparation of timetable, standards, tooling’s and carrying out of trials and testing.
 Introduce Multi-skilling of operators for flexibility of manpower.
 Developed localization of tooling’s and machine spare parts for cost reduction.

SR. PRODUCTION ENGINEER
April 1, 2001 – March 31, 2003

PRODUCTION ENGINEER
April 21, 1998 – March 31, 2001

Job Description
 Prepares process tooling needed in production.
 Supervises Line Leader & Production Operators.
 Interfaces with Quality Control on product performance.
 Prepares and monitors operators’ attendance.
 Conducts training to new operators.
 Evaluates line Leader & Production Operator performance.
 Coordinates with Maintenance Personnel regarding machine maintenance schedule.
 Updates production outputs.
 Coordinates with Production Control all production plan and schedule of priorities.
 Responsible for meeting production targets.
 Supports Section Manager on policy implementation.
 Prepares Work Standard and Work Instruction needed in assigned process.
 Ensures the 5’S are fully implemented in assigned area.
 Periodic Function :
o Machine Trouble Shooting
o Check machine devices and support equipment (daily, weekly).

Additional Endeavors
 Represented Hitachi Cable Philippines in Thailand for the Quality Control Circle Presentation of Hitachi Cable Overseas Corporate Companies. May 15-17, 2002
 Won Hitachi Cable Philippines Quality Control Circle 2002.
Project : Eliminate spooler panel vibration. Feb 8, 2002
 One of the key persons in acquiring ISO 9001:2000 version and ISO 14001 certification with regards to establishment of standards in Extrusion and Color Coating process of automotive wire & cable section.
 Pioneered the operation and documentation of extrusion and color coating process of wire & cable.
 Trained in Japan for transfer of extrusion and color coating machines and product development of CAV, AVS wires. May-September 1998

September 1995 - December 1996 Engineering Assistant at Philippine Long Distance Telephone Company, Makati, Metro Manila, Philippines

September 1995 – December 1996 PHILIPPINE LONG DISTANCE TELEPHONE COMPANY
PLDT Towers, Ayala Avenue, Makati City, Metro Manila

Section : Project Support Group

ENGINEERING ASSISTANT
Job Description
 Handle the monitoring of Zero Backlog project’s construction program schedule.
 Prepares summary report for project status of Switching, Outside Plant and Civil Works.