Frank Degollado
7017 Schley St. Houston, TX 77087| CELL: 832-468-8658 | [email protected]
Objective
Certified NCCER Pipefitter effective at resolving issues and achieving to finish claimed Industrial and Civil projects and achieving challenging goals with reliable work ethic and time expertise .Adept at completing assignments thoroughly with execute operations responsive to immediate and long range objectives, for safety, growth and profits while working as a team. Recognized as being decisive, versatile and hands on problem solver, and fast learner.
Summary Skills
· Certified PIPEFITTER NCCER #16865432
· OSHA 10 /Basic Plus/TWIC Card
· New Construction Installations /Civil Safety Orientated
· Industrial Piping/ Industrial Painter /Carpentry /Scaffolding/ Rod Buster Trench exp. /Iron Worker Concrete Finisher/Rigger/Mechanically Inclined
· Certified Welder Assistant /Certified Forklift Driver
· Computer Literate /Logistics /Shipping and Receiving
· Employee Motivation Acumen
· Dependable Reliable Hardworking Team Player
· Familiar with Safety Procedures and Policies (Very Safety Conscious)
· Skilled with the use of power and hand tools and equipment
· Dedicated to finish a New ProjectExperience
(TRADESMAN INTERNATIONAL) ROD BUSTER/ CARPENTER 6/2017 on call on Projects
Civil construction tying bar and working on vertical trenches walls also participated in all civil construction duties carpentry, drywall, cement finisher all task of my qualification .Attended daily safety meetings reported to my daily assignment showing my best craft skills in building and making carpentry forms. Help of layout of foundation and overviewing of blueprints. Performing physical activities that require considerable other crafts which included rodbuster, cement finisher and handling of power tools and all types of materials. Works safely and with teamwork by building mutual trust, respect and cooperation. Developing specific goals and plans to prioritize, organize, and accomplish work in the safest manner.
(H&M INDUSTRIAL) CARPENTER HELPER 12/2017-12/2017
Responsible for setting up our daily projects keeping work area in a safe and clean condition. Handing tools, Carpentry, Scaffolding, Rod Buster, Concrete Finisher one of my most daily activities was mostly Carpentry, Building and making of forms. Help of layout of foundation physical activities that require considerable use of your arms and legs and moving your whole body, such as climbing, lifting, balancing, walking, stooping, and handling of materials. Works safely and with teamwork by building mutual trust, respect and cooperation. Developing specific goals and plans to prioritize, organize, and accomplish work
(TGE INDUSTRIAL) CIVIL CARPENTER 11/2017-12/2017
Responsible for setting up our daily projects keeping work area in a safe and clean condition. Handing tools, Carpentry, Scaffolding, Rod Buster, Concrete Finisher one of my most daily activities was mostly Carpentry, Building and making of forms. Help of layout of foundation and overviewing of blueprints. Performing physical activities that require considerable use of your arms and legs and moving your whole body, such as climbing, lifting, balancing, walking, stooping, and handling of materials. Works safely and with teamwork by building mutual trust, respect and cooperation. Developing specific goals and plans to prioritize, organize, and accomplish work
(BECTHEL) EXXON NAG PROJECT/ IRON WORKER/PIPEFITTER 07/2017 to 08/2017
Responded to daily duties inspected and analyze other pipefitters assignments and fixed and bolted the pipes in the corrected way my duties were grinding, bolting cutting grating floors, welder helper also
Installed iron or steel beams, girders, and columns to form.
(k.b.w services) pipe fitter helper/civil construction IN all trADES 3/2012 TO 5/2017
Responsible for setting up our daily projects keeping work area in a safe and clean condition .Pipefitter Helper, Welder Helper, Handing tools, Carpentry, Scaffolding, Rod Buster,Rigger, Iron Worker ,Concrete Finisher/Industrial Painter one of my most daily activities was mostly removing debris and cleaning preparing Industrial Pipe Systems, install/remove blinds, orphic flange, channel heads, belt heads, dollar plates, removed/install gate valves, pressure control valves. 4 bolt or hot bolts. Cleaned and degreased weld joints and work pieces efficiently. Mounting pipe hangers and brackets on construction walls to hold pipe disassembled and removed damaged or worn pipe. Inspected tools made sure they were safe to prevent a hazard or injury. grind bevel pipes ,bolted valves and flanges used cutting wheel and pipe cutter until I reached its length fitted flanges, 90 ‘s tee’s and pipe using jacks level and 2 hole bolts, dogs and squares analyzing all levels accurate
(CHAMBERLAIN ROOFING & WATERPROOFING) INDUSTRIAL SHEET METAL FABRACATOR 2012
Inventory for our daily assignments loaded up our fabricated sheet metal and will custom cut and measure our materials into horizon and all other angels and degree and metal coping cap detailing assigned to me on our blueprints. Used the proper tools in the safest manner, Safety was our main concern in the job site because of the heights of our projects.
(SPARROWS GROUP) OFFSHORE SHIPPING AND RECEIVING 2011
Unloading and Loaded ,Inventory ,Forklift Driver ,Data Entry ,Assistant on our daily production drop- offs and pick-ups from our warehouse Inventory on our cargo in the best logistics manner, invoicing print out and learning all up grades on our company systems and programs
(STEWART & STEVENSON) TOOL ROOM ATTENDENT (STUDENT SUMMER JOBS) 2003/2004
Managed Inventory and Prepared requisition for tools & materials needed ,Manually and using Excel spreadsheet functions entering numerical data into databases in a timely manner sorted and shelved an average of (350) tools plus materials for the tool room . Received and process new acquisitions of PPE and Materials for the tool room per week. Calculated and analyzed tool materials for the tool room per week .Monthly Inventory and file records and created new records. Inspected tools before issuance and upon return.
Education
High School: Jersey Village 2004
RESUME ATTACHED
RESUME ATTACHED