GERARDO R. DELA CRUZ
030 D REYES ST. LAMAO, LIMAY, BATAAN
PHILIPPINES 2104
Philippines Contact No. (+63) 9770771210
Malaysa Contact No. (+60) 937545669
E- Mail adds. [email protected]
PERSONAL PROFILE:
POSITION DESIRED : Mechanical Fitter / Iron Worker /
: Rigger
Personal Data
Date of Birth : August 23 1967
Place of Birth : Lamao, Limay, Bataan
Sex : Male
Citizenship : Filipino
Civil Status : Married
Height : 5’6
Weight : 110 lbs
Religion : Catholic
Nationality : Filipino
Blood Type : “B”
Civil Status : Married
Name of spouse : Perlita C. Dela Cruz
Name of Father : Jose Dela Cruz
Name Of Mother : Felisa Dela Cruz
SSS : : 02-1336712-9
Tin No: : 115-378-699
Passport No: : EB4651840
EDUCATIONAL ATTAINMENT
Elementary : Graduate
High school : Graduate
Mechanical : Under Graduate
Company : Asiagroup Sdn Bhd
Address : Lot D7 PT2480 Nilai Industrial Estate Phase II
71800 Nilai Nereri Sembilan Darul Khusus, malays
Inclusive Dates : Dec. 06, 2016 up to Present
Position : Construction Manager
Duties Responsibilities :
Conduct Everyday TBM Tool Box Meeting
Monitoring All activities at Site such as Safety, Progress and quality
Attend Coordination Meeting
Company : Asiagroup Leasing Pte Ltd
Address : NO.3 Pioneer Place, Singapore 627804
Inclusive Dates : Nov. 24, 2015 up to Dec 06, 2016
Position : Mechanical Supervisor
Duties Responsibilities :
Documentation for tender, schedule of work, sequence of work, consumable items
Supervise of removal of equipment by skidding work and Lifting activities.
Company : Pollisum Engineering Pte Ltd
Address : 41 Senoko Way Singapore 758053
Inclusive Dates : January 1, 2015 up to Nov 23, 2015
Position : Mechanical Supervisor
Duties Responsibilities :
In charge for daily production schedule and monitoring progress
Arrange for workers daily task and necessary tools and consumables
Daily report for complete and incomplete production items
Maintain and Monitoring for safe working environment area
In charge for production delivery and receiving repair to client
Company : Tiong Woon Project & Contracting
Address : #15 Pandan Crescant Singapore 128470
Inclusive Dates : June 20, 2011 up to Nov. 2014
Position : Mechanical Supervisor
Duties Responsibilities :
Supervision Such as:
Installation of platform & ladder as per details drawing including punch clearing work
Air Fin Cooler Assembly & Installation
Cooling Tower Assembly and Installation
Catalyst Loading
Loading of Pall-Ring
Steel Structure Installation
Installation of Internal Tray
Assembly & Erection of flare stack
Chipping of foundation for the column and padding
Conduct ( PTT ) Pre Task Talk Before start of work activities
Make daily activities report and Schedule
Company : FLINT ENERGY SERVICES LTD.
Address : Fort McMurray Canada
Inclusive Dates : July 24, 2009 to October 24, 2009
Position : Iron Worker
Duties Responsibilities :
Attend daily tool box meeting and daily exercise before start of work activities.
Follow the instruction to the supervisor what is daily activities and safety instruction.
Good communication between Rigger in to crane operator & other trades.
Erection of steel structure material, gratings, handrail, ladder as per detailed in the drawing including modification work.
Operate of Aerial work Platform over 80′ AWP and Certified Horizontal Lifeline Installation.
Company : Nippon Express Russia
Address : Sakhalin II Phase 2 (LNG) Liquid Natural Gas & OET Project Prigorodnoye Sakhalin Region Russia
Inclusive Dates : April 10 2005 up to September 15 2008
Position : Mechanical Supervisor / Lifting
: Equipment Platform & Ladder Installation
: Equipment Internal Installation and Loading
QUALIFICATION:
Good understanding and skills in safe working load calculations and estimates, slings, chains, rigging gears, hands signals and conformance to internationally accepted.
Occupational health and Safety (OHS) standard.
Duties & Responsibilities :
Preparation and attend daily coordination meeting what are the activity priority, manpower distribution by each group, request of tools, material & equipment are needed for the job, conduct daily tool box meeting we discuss about what are the activities and hse risk on the job and how to control. And also what are rules & regulation to project and work method statement (wms).
Preparations checking of platform & ladder material as per the packing list, assembly as per detailed drawing, apply mock up inspection, hauling of platform &ladder material from lay down to job site and installation as per detailed in the drawing.
Supervise ( CONFINE SPACE ) internal assemble/install work as per fallow the work method statement (WMS) opening of man hole, making of protection for M/H flange & cover serration, setting of 24volt lighting & fan and ventilation, inspection of inside vessel, erection of temporary platform (scaffolding),hauling of internal material from lay down to site, lifting of internal material by crane or electrical winch to platform & bring in inside vessel, assembling of schoepentoeter, hi fi valve trays, swirl deck header & drain pipes, primary & secondary demister, inlet spider & distributor pipes, bed limier, support grid, chimney hot, plate pack, draw off tray with leak test, loading of nutter ring & catalyst and apply (RFI) Request final inspection of installed also cleanliness, final boxing up and final bolt torque or Tensioning.
Company : Clough Niugini
Address : Napa Napa Refinery Project (Papua New Guinea)
Inclusive Date : 08 October 2003 to 16 June 2004
Position : Rigging foreman / Pipe Hydro test and Blowing
Duties & Responsibilities :
Preparation and coordination works such as erection of equipments. Good understanding and skills in safe working loads and estimates, sling, chains, rigging gears, hand signal and conformance to internationally accepted. Occupational health and safety (OHS) standard.
Coordinating with the safety supervisors and officers on how to perform the job safely to avoid accidents that may cause property damage and loss time injury
Lead a group of workers in the installation of heavy equipment such tower, vessels, exchanger, reactors, pumps, compressors, etc.
Line checking of piping base on isometric and P & ID
Preparation of pre hydro activity and piping.
Operating of compressor for build up pressure in hydro- testing of equipment and piping. Also for pneumatic test and air blowing.
Preparation of pipe fitting like hose, valve, gauge, flange and gasket.
Preparing daily accomplishment report
Reinstatement:
Reassemble piping system following completion testing.
Complete the items listed as “post test “on the punch list in the test pack.
Arrange removal of safety signs and barricade.
Company : Nippon Express Singapore
Address : Seraya chemicals II Project, Jurong Island Singapore.
Position : Rigging Foreman / Platform & Ladder and Vessel Internal Tray Foreman
Inclusive Date : November 1, 2000 to May 28, 2001
Duties and Responsibility :
Coordinating with the safety supervisors and officers on how to perform the job safely to avoid accidents that may cause property damage and loss time injury.
Lead group workers in the installation of heavy equipments such as towers, vessels, exchangers, reactor pumps, compressors, etc.
Installation of platform and ladders as per detailed in the drawing including modification. Making sure all works were done in accordance with approved of work method statement.
Preparation construction technical documents such as general arrangement in mechanical drawing and detail drawing with site approval and revision matter, Confirmation of materials and equipment for site delivery schedule, Checking internal material as per Packing list, Assemble for mock up inspection and installation inside vessel as per detailed in the drawing such as trays, demister, distributor pipes, schoepentoeter, loading of catalyst. Also check the working method statement (WMS) what are the required specifications and tolerance needed on the levelness of trays and bolts torque value for tightening of bolt and aply final inspection installed including cleanliness and final box-up.
Company : Nippon Express Singapore
Address : Singapore Olefins Project, Jurong Island
Position : Rigging Foreman / Platform & Ladder and Vessel Internal Tray Foreman
Inclusive Date : November 27, 1999 – October 31, 2000
Duties and Responsibilities :
Conduct daily tool box talk discuss what activities also what are HSE / Risk are and how to control.
Lead a group of workers to hauling and installation of light & heavy equipment such as towers, vessels, exchangers, reactors, pumps, compressors, etc.
Installation of platform and ladders as per detailed in the drawing including modification.
Making sure all works were done in accordance with approved of work method statement.
Supervise of Internal installation/assemble such as internal deck trays, demister, schoepentoeter, distributor pipes, loading of catalyst and deck trays Also doing lay out inside vessel and towers checking height of down comers, weir height, levelness of weir, & tray deck as per indicate on the drawing and (WMS) work method statement. And internal final inspection installed including cleanliness prior to final boxing-up.
Assist also in doing some pre- commissioning works at the later stage of the project.
Company : Sankyu Philippines, Inc.
Address : Nick fill (JGC) BPC Project
Position : Rigging foreman
Inclusive Date : September 19, 1998 to April 06, 1999
Duties Responsibilities :
Attend daily tool box meeting.
Checking of all rigging equipments before the rigging activities starts.
Assembly of crawler crane 150 tons & 450 tons including bogie and counter weight.
Checking of ground condition before hauling of different items such as static & rotating equipment. Also setting of steel plate or matting prior the lifting position of crane.
Loading & unloading of vertical & horizontal vessel, crates material, platform & ladder material, and other accessories materials.
Checking of plan for orientation before the installation of any equipment. Also checking the dimension of the holes of base for equipment to suit to the structure support s and foundation holes.
Lead installation of static & rotating equipment weighting up to 5 tons to 10 tons. Also involved in critical lift of horizontal & vertical vessels, blending silo, lube oil unit, hot oil unit, refrigeration unit, gear reducer motors, compressor, motors pumps, cyclone, filter, transformers, boiler stack, flare stack, cold vent stock, extruder motor additive lift and module structure 34 meters height and total of 180 tons weight.
Erection of reactor 1 & 2 with total of 413 tons weight and 38 meters height, shifted from the ship to ship and traveled to jetty. From the jetty traveled to site jacking down in lay down by cometto. And installation in made a successful and excellent erection without any damages and accident happened. Lifting equipment used were main crane model of (DEMAC) CC4800 X 20 Meters, boom length was 72 meters. And tailing crane (AH 11320 Sky House) which boom length was 45.7 meters.
Company : Nippon Express Philippines
Address : BAPE MHI Project, Simlong, Batangas City
Position : Iron worker / Vessel Internal trays Foreman
Inclusive Date : July 9, 1997 – January 9, 1998
Duties and Responsibilities :
Attend daily tool box meeting
Review and checking what are needed tools & equipments on the job site and also what are the rules & regulation in the project.
Checking of platform & ladder as per in the packing list. And also checking of area position of crane on the job site and ground condition prior to installation of Platform & Ladder as per detailed on the drawing including of modification work.
Supervisor all Internal tray work assemble/install supervise such as Tray floors, Demister, Bed limiter, Wire mesh, Pipe headers, Pipe blow tube bag filter, Vent elements, Catalyst loading and others Internal works Assist all Internal installed final inspection such as cleanliness, checking of weir height, down comer height, levelness of weir, levelness of tray floor, bed height marking for catalyst level and Final box up witness by main contractor and client in charge to mechanical
Company : Nippon Express Singapore
Address : Mobile Toyo JLUB Project, Jurong,
Singapore
Position : Iron worker / Vessel Internal trays Specialist Foreman
Inclusive Date : August 14, 1996 – May 2, 1997
Duties and Responsibilities :
Review drawing prior to the installation and alignment of different items of static equipment.
Checking of plans and foundations of horizontal & vertical vessel and drums before installation.
Assist on heavy lifting and installation of vessels below 100 tons including rotating equipments.
Responsible for hauling of platform material and other accessories as per required in the project.
Lead the installation of platform & ladder including final alignment and final bolt tightening.
Lead the Modification of platform & ladder as per recommendation of client representative.
Supervise all internal works such as trays, header pipes, schoepentoeter, demister, element filter, loading of pall ring & catalyst, etc.
Preparing daily accomplishment report. Also attending daily exercise and tool box meeting.
Assist all final inspection internal installed, welding and final box-up.
Company : Nippon Express Singapore
Address : PCS II Aromatics & C4 project, pulau Ayer
Merbau, Singapore (MITSUI ENGRG.)
Position : Iron worker / Vessel Internal trays Specialist Foreman
Inclusive Date : January 16 1996 – July 30, 1996
Duties and Responsibilities :
Supervise all internal works such as trays, header pipes, schoepentoeter, demister, element filter,
Loading of pall ring & catalyst, etc.
Give suggestion, recommendation bright ideas to the supervisor/engineers assigned on performing daily works schedule as per detailed drawing plans and specification.
Lead in rigging and installation of platform, ladder and handrail including alignment, Bolt tightening including modification work.
Installation and alignment of column including horizontal & vertical supports based on the drawing and specification
Assigned also in dismantling, removing and installation of stainless mixer unit.
Prepared suggestions and recommendation to the client regarding external & internal work design errors on how to modify it.
Checking and installation of tray floor levelness, weir height, down comer’s heights and levelness of weir as per detailed drawing and tolerances.
Company : Nippon Express Singapore
Address : SRC – RCC JGC Expansion Project, Pulau
Merlimau, Jurong, Singapore
Position : Iron worker / Vessel Internal trays Specialist Foreman
Inclusive Date : August 2, 1994 – September 30, 1995
Duties and Responsibilities :
Checking of platform & ladder as per in the packing list. And also checking of area position of crane on the job site and ground condition prior to installation of Platform & Ladder as per detailed on the drawing including of modification work.
Supervise (CONFINE SPACE) internal assemble/install work as per fallow the work method statement (WMS) opening of man hole, protection of M/H flange & cover serration, setting of 24volt lighting & fan and ventilation, inspection of inside vessel, erection of temporary platform (scaffolding), hauling of internal material from lay down to site, lifting of internal material by crane or electrical winch to platform & bring in inside vessel and assemble.
Assist all final inspection such as Platform & ladder And Internal works activities.
Also assist doing Pre-commissioning works at the later stage of the project.
I hereby certify that all information written is true and correct to best of my knowledge and belief.
Gerardo R. Dela Cruz