GILBERT MAGHIRANG CARDOZA
Blk 10 Lot 12, Buena Rosario Subd, Mamatid, Cabuyao City Laguna, Philippines 4025
(+63) 918 501 3733 (+974) 7768 6557 [email protected]
OBJECTIVE: ELECTRICIAN
PROFILE:
Over 15 years working as an electrician and all other related works in electrical installation
read and interpreted electrical plans for installation
skills in other works like plumbing and carpentry.
EDUCATION
College Undergrad!
High School Graduate
WORK HISTORY
ELECTRICIAN March 22, 2018 up to present
Qatar Structurell WLL
Doha, Qatar
Project:Al Rayyan Stadium
• works in all types of containment
• works in cable glanding ang wire dressing
• site promoted as leadman.
ELECTRICIAN May 19, 2016 to June 29, 2017
Architects And Engineering Company
Construction Building and Engineering
Khuderia, Dammam Saudi Arabia
Project: Residential buildings and Appartment
Laying out of all types of electrical piping and tubing
Laying out of all types of electrical full boxes and junction box for all kinds of electrical devices
Installation of panel box and switch boards
Wiring and cable pulling
Intallation of all types of electrical fixtures required on site
Termination, testing and commissioning of power and devices
ELECTRICIAN/SITE PROMOTED LEADMAN January 20, 2014 – March 7, 2016
Endeco Company
Construction /building/ engineering
Malaz, Riyadh Saudi Arabia
Project: Uyon Al Jawa General Hospital
Install all types of electrical piping
Install all types of elctrical boxes such as junction, utility, pull boxes and panel boxes
Work as team leader on installing Building Maintenace System(BMS) Building Fire alarm and Protection System, Lightning Protection System(LPS)
Install cable trays, Cable trancking and etc…
Work as a team leader on cable pulling, cable glandings, cable dressing, cable termination and and other electrical wirings
Work as a team leader on Installation and termination of various types of panel boards such as MATV panel, power panels, BMS panels, ATS and MDPS.
Work as team leader in installation of all types of Electrical fixtures required on site
Termination, testing and commissioning of power.
ELECTRICIAN July 2, 2010 – July 20, 2012
Al-Rashid Trading and Contracting Corporation (RTCC)
Company industry: Contruction/ building/ Engineering
Diriya Riyadh Saudi Arabia / Site Location Staff residence of
King Saud University Riyadh Saudi Arabia
Install all types of electrical tubing
Install all types of junction boxes, utility boxes, pull boxes and panel boxes
Install cable trays, cable trunkings and cable glandings
Install various types of panels e.g. IP panels(data patch panels), MATV panels, ATS and MDPS
Install all types of electrical fixture required on site
Termination, testing and commissioning of power
ELECTRICIAN/PLUMBER Sept. 5, 2008 – April 7, 2009
USD group of Companies (Lea Engineering)
Company Industry: Construction/ building/ lanscapping/ engineering
Install motor pump and solonoid valve for water features such as fountains, artificial water falls and lagoons
Install motor pumps for water irragation and sprinkler
Install control panels for ground lightings and power
SUB-CONTRACTOR ELECTRICIAN Feb 1, 2004 – July 12, 2007
THIRDSCAPE Konstrak
Construction building/ Engineering
San Pablo City Laguna Philippines
Sub-contractor of all electrical works on site…etc…
SUB-CONTRACTOR ELECTRICIAN February 2, 2001 – July 12, 2007
Esthetik Ideas
Contruction/ building/Engineering
#36 L.A. Mabini Street, San Pablo City Laguna Philippines
Sub- contractor of all electrical works on site…etc…
ELECTRICIAN January 10, 2000 – June 12, 2007
Romaries Engineering Services
40 a Mabini street, San Pablo City Laguna Philippines
Sub-contractor on all electrical works on site…etc..
REFERENCES ARE AVAILABLE UPON REQUEST
1. Engineer Amado B. Santos
Company owner
Thirdscape konstrak
Brgy. San Juan San Pablo City
Laguna philippines
Tel no. (049) 561-3957
Mobile no. (+63) 921-4323-270
2. Achitech Laurel Manuel F. Barte
General Manager
Esthetik Ideas
Tel no. (049) 503-0283