Photo

gonzalo viera ayala plumber electrical technician

mexico

e-mail: [email protected]
Academic training

Cecati No. 48: sanitary and gas-hydraulic systems
Cecati No. 26: residential and commercial electrical installations. Cecati No. 7: repair of electric motors. Cecati No. 144: repair of domestic and commercial refrigerators. Cecati No. 144: industrial refrigeration equipment repair
Cecati No. 32: air conditioning window and automotive maintenance.
Mini Split air of mirage maintenance courses
Certification of FTTH in intelmex c

Certification course work at heights and confined spaces DC-3 in the company HAWK
WORK EXPERIENCE
Current technical working RAM 1 HAVC in telephony sites
Company tech mahindra LCC CENTRAL MEXICO
Current status
Work performed within the company
Repair and maintenance of air conditioning equipment
Maintenance of land systems responsible for protection systems to electronic equipment, preventive and corrective maintenance to battery bank
Assembly and disassembly of radio equipment working on sites phone telecommunications towers AT & T
Adjust and tighten screws in telecommunications tower
November of 2015 to 2016 may work in CL construccioniones
Subsidiary of Carso in rebuilding telephone networks
Copper and optical fiber in the last mile
As a technician in migrations FTTH
In the year of 1994 work for CYCSA subsidiary company of telephones of Mexico in the construction of telephone networks playing Espalmador of telephone lines as
From 1995 to the 2014trabaje in the State of Durango in an independent way
in different projects of houses and shops in installation, repair and maintenance in the areas of PLUMBING ELECTRICAL REFRIGERATION AND AIR CONDITIONING Where to develop the following technical and theoretical skills plumbing Ability to read and understand drawings, specifications, operation and maintenance manuals
◾ mounted, installed and repaired PVC pipe cpvc termofucion galvanized copper, taps and accessories of heating, install water line cold and hot drain pipes and gas of rainwater pipeline
◾ I studied plans to determine the required needs and the sequence of  installations
◾calculate and supply different types of plumbing materials in accordance with plans and standards required for different jobs
◾ made openings in walls and floors to place outputs cold water hot water, rain and black waters of different types and diameters of pipes
◾ cutting, welding or bending the pipe according to the installation required
◾ I filled with air and water piping systems and measured pressure due to leakage Installation and repair of furniture, such as sinks, toilets, bathtubs, heaters, hot water

Experience

1997 PLUMBER at 15