HERBERT M. SANTOSCAREER OBJECTIVES:
To work in an organization where is exclusive environment, health competition and ample prospects of professional growth. Where I am exposed to all type of work field, can enhance my knowledge and broaden my experience to maximum. In short I just want to be the active part of development.
WORKING EXPIRIENCE:
Working in Qatar Kentz Member of the SNC- Lavalin Group
Government Project: Sidra Medical and Research Center
Position: HVAC Foreman
Type of work: Maintenance Operation. Mechanical department.
Experiences: Chiller Water Cold type, and AHUS.
• Chiller pump motor primary, secondary and tertiary replaced broken bearing.
• Ahu blower motor, replaced noisy broken bearing , replaced blower belt loose and split.
• Aligning Ahu blower belt.
• Greasing the mechanical part of the blower motors, and pump motors.as per schedule of (PPM).
• Cleaning water filter and water strainer inlet, outlet.
• Cleaning the cooling tower system, water filter and putting chemicals mixing to the water.
• Repairing the gearbox of cooling tower fan motor. Because of oil spilling.
• Repairing cooling tower body parts, water leak problem.Fixing the leakage, and putting silicon.
• Cleaning the Cooling tower body parts, and maintaining water level.
Working in the Palace and Villas of King Abdullah of Saudi Arabia.
Government Company: Technical Affair of the Custodian of the Two Holy Mosques.
Position: HVAC Inspector
Chiller brand Carrier: Air Cool Type
Mechanical Experience:
• Inspectioning Motor Compressor, loose compression, lack of oil, dirty oil, gas leak and dirty filter drier.
• Inspectioning noisy fan motor, broken bearing, fan blade, misaligned rotation, and Loose fan belt.
• Inspectioning water cold supply pipes (in &out), corroded ball valves, gate valves and dirty water filter.
• Checking dusty and broken condensing parts.
• Inspectioning water mixer tank empty or full.
• Inspectioning air handling unit and broken cooling coils fins.
• Checking stock up, and noisy motorized valve.
• Checking broken strainer and dirty filter.
• Checking corroded, broken, drain line and drain pad.
• Checking noisy and stock up, blower motor. checking loose and split blower belt.
• Checking the clog in the water drain line and drain pad of (AHU).
• Checking broken bag filters and aluminum ahu filter.
Electrical Experience:
• Inspectioning (AHU) Chiller panel boards, burn main breaker, magnetic contactor coil, open contact.
• Checking all electric faults, noisy exhaust fan, open and stock up contact.
• Checking dusty control panel board.
• Checking and recording voltage and ampere.
• Checking all electrical signal light good or busted Magnetic contactor over heat.
• Same daily task from chiller, RTU and split unit.
Additional Working Experience:
• Computer
• Encoding and making daily report at the office.
• Making report daily, weekly and monthly.
• Making recommendations.
• Giving ideas and solution to the problem.
• Driving pick up and motorcycle.
SAUDI OGER LTD.
Riyadh 11431, K.S.A
P.O.Box 1449
Fax+9661477079
Position: Foreman-HVAC
Job Description: Chiller Royal Star (Made in Saudi Arabia)
Electrical Experience:
• Chiller operator and maintenance.
• Trouble shooting control panel changed burned overload relay and open coil Contractor.
• Change defective fan motor air cool type. Burned wiring, grounded, open contact.
• Change primary Pump Motor grounded.
• Change “open” water temperature sensor.
• Change “open” float switch of chiller tank.
• Change burn P.C.B. or monitor board.
Mechanical Experience:
• Change grounded secondary Pump Motor of Chiller child water line.
• Welding the leakage in reserved oil using gas welding.
• Change defective filter using gas welding.
• Recharging and vacuuming the system R22.
• Change stuck-up bearing of condenser fan motor.
• Clean the water line filter inlet-outlet. Chiller 1 and Chiller 2.
Refrigeration- Ice Flake Machine Geamatal (Made if France)
Electrical Experience:
• Trouble Shooting magnetic contactor control, and overload relay.Burned, open, grounded, and stuck-up contact.
• Change high pressure switch contact” open”.
• Change high ampere condenser pump motor.
• Change storage refrigeration heater defrost “Open Contract”.
Mechanical Experience:
• Changed clog in the filter drier, used gas welding.
• Put grease in Ice Flake Scrapper.
• Cleaned strainer of storage refrigeration.
• Vacuum and recharging the system R22.
• Change the clog in water cooler condenser of storage refrigeration.
LAMEEC CONTRATING AND CONSTRUCTION COMPANY
Riyad 11512, K.S.A.
P.O.Box 45001
Fax 0096614788433
2006-2008
Position: HVAC Technician
Job Description
• Installed 27 package type unit, Brand: York, American Standard 12 tons King Abdullah. Farm garage G1, G2, G3, Electrical Power Supply lay-out wiring the Control Indoor- Outdoor installation of heater and thermostat to the unit, recharging the unit R22.
• Installed 23 split type unit brand, American Standard and Carrier at the cow farm, milk factory power supply lay-out, wiring control, indoor and outdoor, thermostat and crankcase heater installation for every unit. Piping lay-out welding the liquid line and suction line, recharging the unit R22.
• Installing 11 package type unit American Standard in water Treatment area, power supply lau-out. Wiring the control, to the unit. Installation of thermostat and heater for evry unit. Recharging the system R22.
• Installed 13 unit Split type in Chicken Farm, Carrier, American Standard, power supply lay-out, wiring the control, installation of thermostat, piping layout welding the copper recharging the unit
Commissioning Experience:
• Checked all Voltage, Ampere, for every Compressor in the unit.
• Checked all Voltage, Ampere, for every Condenser fan and blower in every unit
• Checked all safety device like low pressure switch, high pressure switch of all units if working and good condition.
• Checked all room temperature and indoor unit temperature if accurate the standard temperature.
• Checked all exhaust fab Voltage, Ampere, rpn using multi tester and tachometer.
• Checked all heater installed for every unit low pressure side and high side if standard pressure, using gauge manifold.
EDUCATIONAL BACKGROUND:
Tertiary : Roosevelt Collage 2003-2005
Bachelor of science in electrical Engineer
3rd year
Vocational : Samson College 2005-2006
Refrigeration Air Conditioning Technician
EdsaCubao,. Quezon City Philippines
Secondary : San Mateo National High School 1997-2001
Primary : ERES Elementary School 1991-1997
PERSONAL DATA:
Date of Birth : June 7, 1982
Place of Birth : San Mateo Rizal
Height : 5’7”
Weight : 56 Kgs.
Civil Status : Married
Sex : Male
Religion : Christian
Nationality : Filipino
Spouse : Mrs. EdjoieJannice Santos
Family Birth Date
EdjoieJannice – August 25, 1977
Hannah Joy – Nov. 9, 2005
Heris Joy – Nov. 7, 2006
Edenbert – Dec. 12, 2008
Character reference available upon request.
HERBERT SANTOS