Pioneer Sector 1 Singapore 628437
16 May 2018 to 20 June 2018
Position: Electrical & Instrument Commissioning Technician
My working experience includes electrical/instrumental commissioning and inspection. As well as, preparation of working and construction drawings, like PID’s, ILD’s, termination, junction box, wiring, single line diagram. We equip layout and location plan in various projects such as project survey and other related discipline covered under the scope of work.
DOvre Group pte ltd
culzean gas field/maersk
Admiralty road west singapore 757617
08 november 2017 to 23 march 2018
Position: Electrical & Instrument Commissioning Technician
My job includes the following:
Followed-on equipment supply, responsible for execution of studies in electro discipline and many more.
Brunel international south east asia pte ltd
golar flng hilli episeyo
#15 Benoi Road, Singapore 629888
10 march 2017 to 11 october 2017
Position: Electrical & Instrument Commissioning Technician
My job includes the following:
Performed onshore pre-commissioning,
Performed loop checking and loop simulation on various process control instrument to ensure the correct tagging, ranges and alarm tip settings,
Able to handle on-site installation and supervise the workers
Able to perform quality control, meet he productivity standard on time.
Multiconsult asia pte ltd
PIONEIRO DE LIBRA/FPSO/TEEKAY
80 tuas south boulevard
9 december 2016 to 03 March 2017
Position: Instrument Commissioning Supervisor
My job includes the following:
Held the responsibility for pre-commissioning/commissioning activities involving process.
Prepared the documents for the office
Performing wire/continuity test of instrument cable from field instrument to Junction Box (JB) up to marshaling cabinet base on Instrument Loop Diagram (ILD)
Brunel international south east asia pte ltd
ARMADA KRAKEN
#51 Pioneer Sector 1, Singapore 628437
13 June 2016 22 November 2016
Position: Electrical & Instrument Commissioning Technician
My job includes the following:
Performed onshore pre-commissioning,
Performed loop checking and loop simulation on various process control instrument to ensure the correct tagging, ranges and alarm tip settings,
Able to handle on-site installation and supervise the workers
Able to perform quality control, meet he productivity standard on time.
JCet statschippac singapore
#5 yishun street 23, singapore 768442
12 june 2010 to 16 december 2016
Position: Engineering Assistant
My job includes the following:
Determined engineering requirements by conducting inspection and analytical tests, analyzing and synthesizing data. Maintained control charts and determined root causes and preparing bid specifications.
Verified engineering applications by conducting tests and inspections; build and analyzed models and simulations and conducted laboratory experiments and measurements.
United test and assembly center ltd
5 serangoon north avenue 5 singapore 554916
2 may 2006 to 10 june 2010
Position: Engineering Assistant
My job includes the following:
Start-up of wLCSP copper wire bonding
Troubleshooted machine breakdowns and prevent future breakdown involved in line sustaining activities
Assist process Engineers in defining solutions to problematic devices prone to catering, lifted metal, shear and tensile strength failures.
Handled machine KNS ICONN, 8028, Maxum/ Plus/ Ultra/ Shinkawa UTC 1000, UTC1000plus.
Nec semiconductors singapore ptd ltd
38 ang mo kio industrial park II Singapore 569511
August 2005 to april 2006
Position: Engineering Assistant
My job includes the following:
Line sustained of wire bond machine assigned at FOL station
Supported and provided service to maintain set-up, conversion on his assigned equipment and kept such manufacturing equipment and equipment available for production use always.
Researched and ordered required parts and equipment for each job.
Handled machine such as KNS 1488, 8028, Maxum/ Plus/ Kajio Wire bonders 117,118, 128, 131 and 700.
Amkor technology philippines
22 east service road, Cupang Muntinlupa City
January 1996 to July 2005
Position: Line Maintenance Technician IV
My job includes the following:
Trained and Assigned at smart card project
Performed assembly equipment conversion of wire bond and ASM AD809 Die Attach machines
Resolved assembly equipment issues during production
Maintained, installed, troubleshooted and repaired wire bond production equipment to achieve optimum performance.
More power electronics
22 EAST SERVICE ROAD, CUPANG MUNTINLUPA CITY, PHILIPPINES
november 1994 to october 1995
Position: Line Maintenance Technician IV
Handled machine KNS 1488/ ASM AB309 wire bond ASM AD809 Die Attach
Interacted heavily with Manufacturing and Engineering personnel and supporting Manufacturing, including troubleshooting line issues and dispositioning lots on hold.
Identified issues and take ownership for driving them to resolution. In addition, defined and updated specifications and provided training to operators.
Maintained manufacturing techniques and participated in Yield Improvement projects and provide regular yields analysis report.
AMERTON INCORPORATED PHILIPPINES
NINOY AQUINO, SAN DIONISIO PARANQUE METRO MANILA PHILIPPINES
aPRIL 1992 to nOVEMBER 1994
Position: Line Maintenance Technician IV
Responsible for daily problems on wire bond equipment such as KNS 1419,1482/ ASM AB309/ASM309A Shinkawa UTC50 and ASM AD809 Die Attach.
Line Support to meet production output
Formulated plans for machine improvement projects to improve yield loss and quality.
Supported process engineers on process evaluations.
Personal Data
birthday : 16 October 1972
Birth place: Laurel, BAtangas City
gender : Male
CIVIL STATUS : MARRIED
HEIGHT : 137cm
WEIGHT : 78 kg
NATIONALITY : Filipino
RELIGION : Catholic
Education
bATANGAS STATE University
Rizal Avenue Extension, Batangas City
Major in electronic technology
COMMUNICATION
I speak fluent Tagalog and English.
REFERENCES
LEVIE MALINAO
DINGDONG DE MESA
JESIE SALITA