Over Sixteen [16] years’ of extensive professional combined total experience.
More than [10] years working in a European Consulting Engineering Firm from Germany & Austria for Construction Supervision of Water Transmission System [WTS] / or Water Supply and Thermal Power Plant project.
Engineering, Procurement, Construction from the South Korean Company Doosan Heavy Industries & Construction for Quality Control & Quality Assurance and Construction Supervision assigned in [QA-QC Department] for Combined Heat Power Plant [Cogeneration Power Plant] Project.
WES – World Education Services – Toronto ,CANADA, WES Ref. No.: 3056685, Canadian Equivalency Summary is Diploma [3 Years] and Secondary School Diploma.
Qualified for EIT registration
Degree – Bachelor of Science in Civil Engineering [B.S.C.E], Year Completed May 2003 – 5 Years, Major/Specialization is Civil Engineering.
Accredited by the Saudi Council of Engineers [Kingdom of Saudi Arabia] as Civil Engineer, SCE – Registration No.54208, Identity No. 3037608738, Expiry Date 14 December 2020.
Strong background in the following projects below:
Non-renewable Sources of Energy Projects, 2 Years & 6 Months for Power Plant [Combined Heat Cycle – Cogeneration Power Plant & Thermal Power Plant].
Shuqaiq – Independent Water & Power Plant [IWPP] – Phase 2 [Thermal Power Plant]
Fadhili Combined Heat Power Plant [FCHPP] – Phase 1 [CHP] – Aramco Power Supply
Water Supply Engineering Projects, 8 Years & 6 Months for Water Transmission System Projects [WTS], Carbon Steel Pipes Diameters ranging [4 Inches to 72 Inches], External Coating Protection is 3 – Layers of HDPE Materials, Internal Coating is Cement Mortar Lining [CML] for Product Water from the Desalination Company. More than one thousand kilometers of Steel Pipelines constructed in Saudi Arabia.
Infrastructures Projects , 5 Years & 1 Month for Sakaka, Al-Jouf Region Asphalt Road Development Projects, Overpassed Bridge Projects, Sakaka Al Jouf – Storm Water Drainage System Project.
Crude Oil & Water Retaining Structures: Concrete Tanks, Crude Oil Tanks [3 Nos.], Water Steel Tanks Capacity Ranging from [7,000 – 150,000 m³] of Product Water, Demineralized Tanks, Dual Media Filtration, Reverse Osmosis Building, Water-Intake, Concrete Backwash Tank, Outflow Structure, Baffle Foundations.
Station Piping Concrete Structures : Valve Shafts [Inlet & Outlet], Pressure Control Valves Shafts, Flow Control Valves Shafts, Marine Structures [Fuel Oil Unloading Platform/Jetty], Dredging & Reclamation, Breakwater & Revetments Construction.
Combined Cycle Power Plant Structures [Smoke Stack Foundations & Pedestals], Fuel Gas Desulphurization Foundations, Piling Works, Gas Turbine Generator Foundation Pedestals, Heat Recovery Steam Generator Foundations & Pedestals.
Underground Structures : Electrical Manhole [EMH], Electrical Duct Bank [EDB], Pipeline [Drain & Washout Station, Vent Station]. Electrical Building: Central Control Building [CCB].
Complex Siemens Foundations Design Rebar Installation Works, Formworks, Reinforced & Non-Reinforced Concrete, Concrete Rectifications, Structural Erection Works, Coating & Architectural Painting Works, Concrete Pre-Cast Works, Station Piping’s [Water Pumping Station], Tap-Off Station [TOS], Waste Water Treatment Plant, Sewage Pipeline.
Proven skills in Analysis, Generate Solutions to unfamiliar and sometimes complex problems, Adapt and apply a range of processes relevant to the field of work or study.
WES ECA Reports equivalent is Diploma [3 Years] and Secondary School Diploma
2016-2021
WES Registration No. 3056 685
Accredited: Civil Engineer
Registration No. 54208