OBJECTIVE – To obtain a position in your company where I can apply my 4+ years of plant operator, maintenance and pipe fitter.
Responsible for operating a 500m³ Reverse Osmosis (R.O.) water treatment plant in Al Assyah Project (Ministry Of Water – Operation and Maintenance). Ensured that water discharges comply with all local, state and federal legal requirements. Completed SOPs, documented and recorded treatments and other daily activities. Also maintained centrifugal pumps and chemical dosing pumps that are commonly used in these plants.
Responsible for extracting and installing submersible pumps in Al Assyah Project (Ministry Of Water – Operation and Maintenance). Ensured that the pumps are good condition in order to supply raw water to the R.O. plant. Pumps that have outside diameter ranging to 6” – 8”.
Member of a team in installing different kinds of pipes such as polyethylene, ductile and polymerizing vinyl chloride (PVC) in Al Assyah Project (Minister Of Water – Operation and Maintenance). Ensuring that the treated water from the R.O. plants are distributed in houses in the town of Al Assyah. I am also responsible of the mainline valves which have outside diameter of 20” to ensure the water is evenly distributed daily in sections of the town of Al Assyah.
Part of a small crew that fabricates, installs and polish stainless steel railings, staircase, canopy and other house related structures in Ozamis City Misamis Occidental. Also installed and repaired roll-up doors for department stores and small establishments.
Execute 100% implementation of JOLIBEE Vision and MISSION. Ensure Quality & Standards are served best to the customers. Execute “Alagang Pinoy” to all customers encountered.