Photo

Joel Tabag Argueza Industrial Electrician/Electrician

Philippines

November 1996 to June 1998     Project: Rastanura Refinery Upgrading Project ( RTRUP )

Address: Rastanura, Kingdom of Saudi Arabia

Company: Consolidated Contractors Company WLL ( C.C.C )

Contractor: Bechtel/C.C.C

Client: Saudi Aramco

Position: Electrician

 

June 1998 to June 1999                 Project: Saudi Chevron Petro Chemical Project ( SCPP )

Address: Jubail Kingdom of Saudi Arabia

Company: Consolidated Contractors Company ( C.C.C )

Contractor: Chiyoda Petro Star Ltd. /C.C.C

Client: Chevron

Position: Electrician

 

June 1999 to August 2001           Project: Hawiyah Gas Plant Project ( HGP )

Address: Hawiyah, Kingdom of Saudi Arabia

Company: Consolidated Contractors Company ( C.C.C )

Contractor: JGC/C.C.C

Client: Saudi Aramco

Position: Electrician

 

August 2001 to June 2003          Project: Haradh Gas Plant ( HDGP )

Address: Haradh, Kingdom of Saudi Arabia

Company: Consolidated Contractors Company ( C.C.C )

Contractor: JGC/C.C.C

Client: Saudi Aramco

Position: Electrician

 

June 2003 to October 2004        Project: Quatif and Abu Safa GOSP-1 Project ( QGP-1 )

Address: Qatif, Kingdom of Saudi Arabia

Company: Consolidated Contractors Company ( C.C.C )

Contractor: SNAMPROGETTI/C.C.C

Client: Saudi Aramco

Position: Electrician

Duties and Responsibilities:

Conduct a weekly toolbox meeting to ensure safety before to start the work task.
Conduct training on proper handling of electrical handtools/power handtools and electrical works.
Conduct regular inspection of electrical equipment i.e electrical handtools/power handtools to ensure safety prior to operation and use, ensuring all the power handtools are tested.
Responsible the installation of EMT conduit, Rigid steel conduit, Rigid pvc coated steel conduit.
Responsible the installation of Ladder cable tray and perforated cable tray.
Responsible the installation of Plant lighting, Street lighting, Perimeter lighting.
Responsible the installation of Power Cable ( HV, MV, LV, Control cables, & Instrument cables ).
Responsible for the Glanding of Power cables ( HV, MV, LV ) Control cables & Instrument cables.
Responsible for the Termination of Power Cables ( MV, LV ) Control cables & Instrument cables.
Responsible for the Installation of Switchgear panel, MCC panel, UPS panel, Electrical Distribution Board panel, Trnasformers, rated ( 13.8kv 4.16kv transformers, Cathodic transformers .
Responsible for the installation of Grounding system & Cathodic protection system.
Reading of Electrical and Mechanical drawings and specification to determine job requirements.
Plan the Layout Wiring System.
Responsible for the Mobilization of camp preparation of power on camp & site, Installation of communication cable.
Plan and participate in cable pulling, tying and dressing.
Work outdoors, indoors in confined spaces, at heights and standing for long period.
Work under Permit conditions.
Complying with Isolation and Lockout procedures.
Wear and correct use of Personal Protective Equipment ( PPE ).
Can Interpret drawing.
December 2004 to Feb. 2006     Run owned business ( Building Electrical Installation

Address: Cabitokolan Reserva ,Baler Aurora

 

March 2006 to September 2007        Project: Jubail Chevron Philips Project ( JCPP )

Address: Jubail, Kingdom of Saudi Arabia

Company: Consolidated Contractors Company ( C.C.C )

Contractor: JGC/C.C.C

Client: Chevron

Position: Chargehand Electrical ( Leadman )

 

September 2007 to October 2008      Project: Alkhafji Crude Onshore Facilities Project ( KCOP )

Address: Alkhafji,Kingdom of Saudi Arabia

Company: Consolidated Contractors Company WLL ( C.C.C )

Contractor: Consolidated Contractors Company WLL ( C.C.C)

Client: Saudi Aramco

Position: Chargehand Electrical (Leadman )

 

October 2008 to April 2010                 Project: Khursaniyah Gas Plant Project ( KGP )

Address: Khursaniyah,Kingdom of Saudi Arabia

Company: Consolidated Contractors Company WLL ( C.C.C )

Contractor: Bechtel/Technip/C.C.C

Client: Saudi Aramco

Position: Chargehand Electrical ( Leadman )

Duties and Responsibilities:

  1. Conduct tool box talk meeting to all work crew every morning on daily basis before distributing the work task.
  2. Receive the work task and work plan from a direct foreman and distributed to work crew.
  3. Lead and assist work crew on work site to maintain quality of work and minimized wasting of materials.
  4. Provide work crew a material required on site.
  5. Prepare material take off as per the work scope and give it to foreman.
  6. Update drawings to highlight the completed work.
  7. Prepare weekly plan of work and give it to foreman.
  8. Prepare daily report at the end of workday and give it to foreman.

 

May 2010 to Oct. 2012              Run owned business ( Building Electrical Installation )

Address: Cabitokolan Reserva, Baler Aurora

 

October 10,2012 to May 14 2014        Project: PNG-LNG EPC4 Hides Gas Conditioning Plant and Well Pad Project ( HGCP )

Address: Hides, Papua New Guinea

Company: Kentz Engineers and Constructors

Contractor: KENTZ/CBI/CLOUGH Joint Venture

Client: Exxon Mobil

Position: Electrical Technician

Duties and Responsibilities:

  1. Meggering,continuity testing of electrical power and control cables,instrument cables using fluke 1507 megger tester.
  2. Megger and continuity test cable rated 3.8/6.6kv using fluke 1507 and fluke 1555 10kv megger tester.
  3. Continuity testing of grounding cable using fluke 1507 insulation tester.
  4. Testing of grounding earth rod using fluke 1623 earth resistance tester.
  5. Testing of cctv camera cable using fluke DTX 1800 cable network tester and fluke 1507 insulation tester.
  6. Testing of heat tracing cable using fluke 1507 insulation tester.
  7. Testing and meggering of cable on drum using fluke 1507 insulation tester.
  8. Testing meggering of motors rated up to 6.6kv using fluke 1507 insulation tester and fluke 1555 10kv megger.
  9. Assist HI-POT testing.

 

June 2014 to July 2016              Run owned business ( Building Electrical Installation )

Address: Cabitokolan Reserva,Baler Aurora

 

August 13,2016 to August 11,2017           Project: Separator and Boosting Facilities ( SBF )

Address: Alrar, Algeria

Company: Bonatti

Contractor: Bonatti

Client: Sonatrach

Position: Electrician

Duties and Responsibilities:

  1. Install cable trays ( Ladder cable trays & Perporated cable trays ).
  2. Cable pulling of power cables ( HV,MV,LV ) ,control cables and instrument cables.
  3. Glanding and termination of power cables ( HV,MV,LV ), and control cables for distribution panel boards and motors.
  4. Glanding and termination of instrument cables.
  5. Install plant lightings,
  6. Install cables for lightings
  7. Glanding and termination of plant lighting cables.

 

September 20,2017 to May 13,2018        Project: Station De Compression A Hassi r’mel Du Gazoduc GR4-48″

Address: Hassi R’mel, Algeria

Company: Bonatti

Contractor: Bonatti

Client: Sonatrach

Position: Electrician

Duties and Responsibilities:

  1. Install cable trays ( Ladder cable trays and Perporated cable trays ).
  2. Grounding system installation.
  3. Install panels for HVAC system.
  4. Install cables for HVAC system ( MV,LV ).
  5. Glanding and termination of cables for HVAC System ( MV,LV cables ) including instrument cables.
  6. Install gas detectors,smoke detectors and cables.
  7. termination of gas detector cables and smoke detector cables.

 

June 2018 to march 2019           Run owned business ( Building Electrical Installation )

Address: Cabitokolan Reserva,Baler Aurora

 

 

 

 

 

 

 

 

 

Education

June 1980 to March 1986 Primary at Reserva Elementary School

Graduate

June 1986 to March 1990 Secondary at Aurora Wesleyan Highschool

Graduate

June 1990 to April 1992 COLLEGE at Systems Plus Computer Institute

Graduate 2 year computer technician course