November 1996 to June 1998 Project: Rastanura Refinery Upgrading Project ( RTRUP )
Address: Rastanura, Kingdom of Saudi Arabia
Company: Consolidated Contractors Company WLL ( C.C.C )
Contractor: Bechtel/C.C.C
Client: Saudi Aramco
Position: Electrician
June 1998 to June 1999 Project: Saudi Chevron Petro Chemical Project ( SCPP )
Address: Jubail Kingdom of Saudi Arabia
Company: Consolidated Contractors Company ( C.C.C )
Contractor: Chiyoda Petro Star Ltd. /C.C.C
Client: Chevron
Position: Electrician
June 1999 to August 2001 Project: Hawiyah Gas Plant Project ( HGP )
Address: Hawiyah, Kingdom of Saudi Arabia
Company: Consolidated Contractors Company ( C.C.C )
Contractor: JGC/C.C.C
Client: Saudi Aramco
Position: Electrician
August 2001 to June 2003 Project: Haradh Gas Plant ( HDGP )
Address: Haradh, Kingdom of Saudi Arabia
Company: Consolidated Contractors Company ( C.C.C )
Contractor: JGC/C.C.C
Client: Saudi Aramco
Position: Electrician
June 2003 to October 2004 Project: Quatif and Abu Safa GOSP-1 Project ( QGP-1 )
Address: Qatif, Kingdom of Saudi Arabia
Company: Consolidated Contractors Company ( C.C.C )
Contractor: SNAMPROGETTI/C.C.C
Client: Saudi Aramco
Position: Electrician
Duties and Responsibilities:
Conduct a weekly toolbox meeting to ensure safety before to start the work task.
Conduct training on proper handling of electrical handtools/power handtools and electrical works.
Conduct regular inspection of electrical equipment i.e electrical handtools/power handtools to ensure safety prior to operation and use, ensuring all the power handtools are tested.
Responsible the installation of EMT conduit, Rigid steel conduit, Rigid pvc coated steel conduit.
Responsible the installation of Ladder cable tray and perforated cable tray.
Responsible the installation of Plant lighting, Street lighting, Perimeter lighting.
Responsible the installation of Power Cable ( HV, MV, LV, Control cables, & Instrument cables ).
Responsible for the Glanding of Power cables ( HV, MV, LV ) Control cables & Instrument cables.
Responsible for the Termination of Power Cables ( MV, LV ) Control cables & Instrument cables.
Responsible for the Installation of Switchgear panel, MCC panel, UPS panel, Electrical Distribution Board panel, Trnasformers, rated ( 13.8kv 4.16kv transformers, Cathodic transformers .
Responsible for the installation of Grounding system & Cathodic protection system.
Reading of Electrical and Mechanical drawings and specification to determine job requirements.
Plan the Layout Wiring System.
Responsible for the Mobilization of camp preparation of power on camp & site, Installation of communication cable.
Plan and participate in cable pulling, tying and dressing.
Work outdoors, indoors in confined spaces, at heights and standing for long period.
Work under Permit conditions.
Complying with Isolation and Lockout procedures.
Wear and correct use of Personal Protective Equipment ( PPE ).
Can Interpret drawing.
December 2004 to Feb. 2006 Run owned business ( Building Electrical Installation
Address: Cabitokolan Reserva ,Baler Aurora
March 2006 to September 2007 Project: Jubail Chevron Philips Project ( JCPP )
Address: Jubail, Kingdom of Saudi Arabia
Company: Consolidated Contractors Company ( C.C.C )
Contractor: JGC/C.C.C
Client: Chevron
Position: Chargehand Electrical ( Leadman )
September 2007 to October 2008 Project: Alkhafji Crude Onshore Facilities Project ( KCOP )
Address: Alkhafji,Kingdom of Saudi Arabia
Company: Consolidated Contractors Company WLL ( C.C.C )
Contractor: Consolidated Contractors Company WLL ( C.C.C)
Client: Saudi Aramco
Position: Chargehand Electrical (Leadman )
October 2008 to April 2010 Project: Khursaniyah Gas Plant Project ( KGP )
Address: Khursaniyah,Kingdom of Saudi Arabia
Company: Consolidated Contractors Company WLL ( C.C.C )
Contractor: Bechtel/Technip/C.C.C
Client: Saudi Aramco
Position: Chargehand Electrical ( Leadman )
Duties and Responsibilities:
May 2010 to Oct. 2012 Run owned business ( Building Electrical Installation )
Address: Cabitokolan Reserva, Baler Aurora
October 10,2012 to May 14 2014 Project: PNG-LNG EPC4 Hides Gas Conditioning Plant and Well Pad Project ( HGCP )
Address: Hides, Papua New Guinea
Company: Kentz Engineers and Constructors
Contractor: KENTZ/CBI/CLOUGH Joint Venture
Client: Exxon Mobil
Position: Electrical Technician
Duties and Responsibilities:
June 2014 to July 2016 Run owned business ( Building Electrical Installation )
Address: Cabitokolan Reserva,Baler Aurora
August 13,2016 to August 11,2017 Project: Separator and Boosting Facilities ( SBF )
Address: Alrar, Algeria
Company: Bonatti
Contractor: Bonatti
Client: Sonatrach
Position: Electrician
Duties and Responsibilities:
September 20,2017 to May 13,2018 Project: Station De Compression A Hassi r’mel Du Gazoduc GR4-48″
Address: Hassi R’mel, Algeria
Company: Bonatti
Contractor: Bonatti
Client: Sonatrach
Position: Electrician
Duties and Responsibilities:
June 2018 to march 2019 Run owned business ( Building Electrical Installation )
Address: Cabitokolan Reserva,Baler Aurora
Graduate
Graduate
Graduate 2 year computer technician course