Photo

John Luab Mata Batch plant Operator / Supervisor

Niger

 

JOHN LUAB MATA

Puroc-sambag, Sangi, Toledo City, Cebu Philippines

Home: +63-32-384-2749

Work: +227-92197608

Email:    [email protected]

 

Position Applied for:   BATCH PLANT OPERATOR / SUPERVISOR

 

Key Skills

More than 10 years of experience in concrete plant  machinery
Knowledgeable in maintenance, processing and repairs of the various concrete machines
Ability to manage physically challenging tasks
Capable to work in team and as individual under minimum supervision
Ability to work for long durations and under strict deadlines
Employment history

I.                    Company:                   B.L. Harbert International

Address:                      Shades Creek Parkway, Suite 3000, Birmingham, Alabama, USA.

Position:                      Batch Plant Operator / Supervisor

Assigned project:     US Embassy compound project Niamey Niger.

Inclusive date:           October 26, 2016 – Up to present

 

Job Descriptions:

§  Report direct to the construction manager.

§  Review and prepare concrete schedule.

§  Coordinate with concrete site supervisors and quality control.

§  Supervise local workers and drivers. Make sure that everybody is doing their duties and assigned task.

§  Inspect Aggregates, ensure that aggregates are well moisturized in order to control the temperature.

§  Coordinate with laboratory technicians for moisture content before starting the concrete production.

§  Operate bath plant and dispatch concrete to site on time scheduled.

§  Perform preventive maintenance and cleaning right after the concrete productions.

§  Manage stocks (Cement, Sand, Gravels and Additives) forecast 3 weeks look ahead.

§  Perform documentation and record with regards to concrete production and materials deliveries..

§  Close Monitor batch plant conditions, order spare parts.

§  Perform daily time record for local workers and submit to the HR department.

§  Strictly follow safety rules and environmental regulations, maintain a safe environment.

 

II.                  Company :                  VAN OORD BAM LIMITADA

Address:                      Moin, Limon, Costa Rica

Position:                      Batch plant supervisor

Assigned project:     Container port terminal, Moin, Limon, Costa Rica.

Inclusive date:           May 17, 2016 – September 07, 2016

Job Description:

§  Report direct to production manager

§  Prepare for concrete schedule; draft a time table for concrete orders.

§  Direct batch plant personnel, drivers, and operators.

§  Coordinate site personnel or site supervisors for concrete delivered at site.

§  Close monitor concrete workability. Adjust or correct if necessary.

§  Manage stocks (Cement, Sand, Gravels and Additives) forecast 3 weeks look ahead.

§  Perform materials order to procurement department.

§  Perform daily time record for batch plant local employee

§  Ensure that concrete plant and equipment are maintained properly to operate safely and effectively.

§  Inspect stockpile ensure no contamination in order to maintain the quality of the concrete.

§  Strictly implement safety rules and environmental regulation compliance and maintain a safe working environment

 

III.                Company:                   Prime Project International

Address:                      US Navy base, Camp Lemonier Djibouti

Position:                      Batch plant manager

Inclusive date:           26 July 2015 – March 27, 2016

 

Job Description:

§  Guide local workers, TCN staff and operators engage in concrete operations.

§  Maintain inventory levels of additives and component of concrete mix designs.

§  Read specifications defining size of the aggregates and proportion of water cement required for batch of concrete.

§  Performed the timely order and delivery of cement and aggregates to the batching plant.

§  Take care of the regular testing of the concrete prior to delivery to the site at the batching plant.

§  Perform documentation with regards to concrete production and delivery.

§  Manage Laboratory and perform daily breaking samples. Close monitor the concrete slump temperature.

§  Maintain the schedule for maintenance and cleaning the batch plant.

§  Close Monitor batch plant conditions, order spare parts.

§  Maintain a safe work environment for all batch plant workers. Take care of maintenance issues with the concrete plant. Work with shop maintenance to keep trucks and plant running safely and effectively.

 

 

 

 

IV.                Company:                   BAM INTERNATIONAL BV

Address:                      Plot no. 1119, Chole Road,Msasani, P.O. Box 78809

Dar es Salaam, Tanzania.

Position:                      Batch Plant Manager

Inclusive date:           February 2, 2015 – July 20, 2015

 

Job description:

§  Oversee batch plant operations from the beginning to the end of concrete pouring.

§  Manage stocks (Cement, Sand, Gravels and Additives) 3 weeks look ahead.

§  Performed documentation with regards to concrete production and materials deliveries.

§  Guide batch plant crew and operators engage in concrete operations activities.

§  Perform internal report (Daily production report, materials inventory)

§  Monitor concrete production delivered at site and maintain the quality and workability (Slump, temperature and air content)

§  Coordinate with concrete site supervisor to monitor the concrete workability.

§  Maintain the schedule for maintenance and cleaning the batch plant at the end of the production, preparation for the following day.

§  Strictly implement safety and environmental regulation compliance and maintain a safe working environment.

 

V.                  Company:                   AASLEFF BAM INTERNATIONAL  JV

Address:                      Sumbawanga, Tanzania.

Position:                      Batch Plant Supervisor

Inclusive date:           February 2, 2013 – December 17, 2014.

Project:                        Road project

Job description:

§  Assist and coordinates activities of batching plant crew engage in transferring cement bags from flat bed trailer to the storage container.

§  Monitor stocks materials for concrete and make timely order of cement, aggregates and additives.

§  Perform purchase order of batch plant spare parts which is commonly broken.

§  Perform daily report such as materials inventory, production report and submit into production control department.

§  Oversee workers ensure all are working wearing PPE at all time.

§  Coordinate site supervisor and field technicians to monitor the concrete delivery and workability.

§  Dispatch concrete from the batch plant to site.

§  Strictly implement safety and environmental regulation compliance and maintain a safe working environment.

 

 

 

VI.                Company:                   B.L. HARBERT INTERNATIONAL

Address:                      820 Shades Creek Parkway, Suite 3000, Birmingham, Alabama, U.S.A.

Position:                      Batch Plant Operator

Inclusive date:           January 21, 2011 – June 16, 2012

Assigned project:     American Embassy Project, Libreville, Gabon.

Job discretion:

§  Conduct plant inspections before starting the concrete production.

§  Arrange the sequence of the truck driver.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component.

§  Operate batch plant in proper manner.

§  Assist to repair the batching plant using hand tools, power tools and welding equipment.

 

VII.              Company:                   B.L. HARBERT INTERNATIONAL

Address:                      820 Shades Creek Parkway, Suite 3000, Birmingham, Alabama, U.S.A.

Position:                      Batch plant operator / Supervisor

Inclusive date:           April 22, 2009 – December 19, 2009

Assigned project:     American Embassy project, Lusaka, Zambia.

Job discretion:

§  Conduct plant inspections before starting the concrete production.

§  Arrange the sequence of the truck driver.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component.

§  Operate batch plant in proper manner.

§  Assist to repair the batching plant using hand tools, power tools and welding equipment.

§  Perform order request for concrete raw materials such as cement, sand aggregates, and additives.

 

VIII.            Company:                   Al-Houssain & Al-afaliq Co.

Address:                      Al ahsa, hofuf 3982, Kingdom of Saudi Arabia.

Position:                      Batch Plant Operator / Dispatcher

Inclusive date:           March 02, 2007 – March 07, 2009

Assigned project:     Aramco Gas Plant, Hawiyah Kingdom of Saudi Arabia, Combined cycle power Plant, Al-koraya.

Job discretion:

§  Conduct plant inspections before starting the concrete production.

§  Inspect chiller plant, ice plant, and R.O plant ensure all are running in a good condition.

§  Arrange the sequence of the truck driver.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component.

§  Operate batch plant in proper manner.

§  Report to the technical maintenance department if any malfunction is observed.

§  Perform order request for concrete raw materials such as cement, sand aggregates, and additives.

§  Submit daily batch weight and production record to the direct supervisor.

 

IX.                Company:                   SNC REMICON INC.

Address:                      805 Alang-Alang, Mandaue City, Cebu Philippines.

Position:                      Batch Plant Operator.

Inclusive date:           June 10, 2006 – February 30, 2007.

Project:                        Concrete road and Residential Building.

Job discretion:

§  Conduct plant inspections before starting the concrete production.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component greasing point.

§  Operate batch plant in proper manner.

§  Coordinate with maintenance department if any malfunction is observed.

§  Assist to repair the batching plant using hand tools.

§  Close monitor stock materials.

§  Submit daily batch weight and production record to the direct supervisor.

 

X.                  Company:                   JLR CONSTRUCTION AND AGGREGATES

Address:                      Lower Tingob, Mandaue City, Cebu Philippines.

Position:                      Batch Plant Operator / Dispatcher

Inclusive date:           December 16, 2005 – June 09, 2006.

Project:                        Cebu Doctors University Building and public road rehabilitation.

 

Job discretion:

§  onduct plant inspections before starting the concrete production.

§  Arrange the sequence of the truck driver.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component.

§  Operate batch plant in proper manner.

§  Report to the technical maintenance department if any malfunction is observed.

§  Coordinates with drivers to determine their location.

§  Assist to repair the batching plant using hand tools, power tools and welding equipment.

§  Perform order request for concrete raw materials such as cement, sand aggregates, and additives.

§  Submit daily batch weight and production record to the direct supervisor.

XI.                Company:                   SNC REMICON INC.

Address:                      805 Alang-Alang, Mandaue City, Cebu Philippines.

Position:                      Batch Plant Operator.

Inclusive date:           April 22, 2005 – December 16, 2005.

 

Job discretion:

§  Conduct plant inspections before starting the concrete production.

§  Arrange the sequence of the truck driver.

§  Inspect concrete truck ensure no water left inside the drum and instruct drivers to reverse the drum before the batch is being start.

§  Maintain batch plant by proper cleaning, greasing the mechanical component.

§  Operate batch plant in proper manner.

§  Coordinate with maintenance department if any malfunction is observed.

§  Assist to repair the batching plant using hand tools, power tools and welding equipment.

§  Perform order request for concrete raw materials such as cement, sand aggregates, and additives.

§  Submit daily batch weight and production record to the direct supervisor.

 

 

PERSONAL INFORMATION

Home address:                 Puroc-Sambag, Sangi, Toledo City

Nationality:                         Filipino

Civil status:                         Married

Age:                                       36

Language Spoken:           English, French, Español, Filipino

 

Skills

§  Can drive any kind of light vehicle

§  Can operate loader, fork-lift and Transit mixer.

 

Knowledge in Computer

§  Word

§  Excel

§  Power point

§  AutoCAD 2D and 3D rendering

 

EDUCATIONAL ATTAINMENT

 

ELECTRONICS TECHNOLOGY

Trade-Tech international Institute

A.S. Fortuna, Mandaue City, Cebu Philippines

Graduated: 2004

Secondary

Amio High School

Amio Sta. Catalina, Negros Oriental, Philippines

Graduated: 1999

 

Primary

Cansumalig Elementary School

Cansumalig, Bayawan City, Negros Oriental

Graduated: 1995

 

Training and Seminar

1.       CAD 2D and 3D rendering.

2.       Cadetship Training with the following module:

§  Plant operation and Servicing

§  Plant Repair and maintenance

§  Concrete operations

§  Concreting best practice

§  Safety

§  Aggregates production

§  Quality control

§  Ready mix concrete

 

Contact ReferenceS

 

Lasse Kampp

Production manager

PER AARSLEFF

Laila-Sumbawanga Road project, Tanznia

Email: [email protected]

 

Calvin Goodale

Project manager

B.L. HARBERT INTERNATIONAL

U.S. Embassy complex, Ankara, Turkey.

Email: [email protected]

 

 

 

 

 

 

 

Joemel Medalle

Package manager

Structural / Planning Engr.

Bam International bv

T3 Julius Nyerere Intenational Airport Dar es Salaam

Email: [email protected]

 

Jeff Zeeman

Construction manager

B.L. HARBERT INTERNATIONAL

U.S. Embassy complex, Libreville, Gabon

Email: [email protected]

 

 

 

 

CERTIFICATION

 

I hereby certify that to the best of my knowledge and belief, all information to this application are correct and made in good faith.

 

 

JOHN LUAB MATA

Applicant