Jonnie E. Chavez
Governor Panotes Avenue, Daet Camarines Norte
4600, Philippines
Mobile No. +966557842462 / +63999436396
SKILLS
Ability to work well with others and with less supervision. Oral and Communication Skills, Trouble Shooting and Repair Skills Electrical and Basic Electronic.
SUMMAR OF QUALIFICATIONS
· Knowledgeable in Electrical
· Can perform of different Types of Test in Electrical
· Knowledgeable of Installed Electrical Panel
· Familiar in Safety Awareness
POSITION: ELECTRICAL FOREMAN / ELECTRICAL TECHNICIAN
WORK EXPERIENCE
Projects: Khurais Exp. Project and Sat GOSP/ KHCPF
Company: KENTZ / SNC LAVALIN
Date: November 5, 2017 – November 4, 2019
Position: Electrical Technician and Electrical
Job Description:
v Supervise for Installation Panel, Transformer
· Installation of Panels , Switch Gear, Control Panel, Dry Transformer, RP Panel EIRP Panel, UPS Panel, Battery Rack, Sensor, GPS, Gen. Set, Control Panel, Load Bank.
· Installation of Cable Tray, Installation of Bass Bar for Electrical Instrument for Grounding.
· Termination of Power Supply for Panel, JB, Analyzer, Lightings, and Control for Motor and Panels, Disconnection Switch.
Project: Constriction of new 132/13.8kv substation G-2 project
Company: Al Arrab Constructing Company – International 2 Riyadh
Date: October 5, 2015 – December 15, 2016
Position: Electrical Technician and Electrical
Job Description:
v Erection of switch gear panel, control panel, and GIS panel transformer
· Loop checking
· Gladding and termination of power supply, switch gear panel, control panel, GIS, transformer, installation of bass bar, and plastic cover installation of bass bar
· Continuity check
· Migger
· Intervention panel to panel
· Termination of switch gear panel, control panel, GIS panel, transformer connection
· Termination of VT and CT connection
· Termination of DCDB and ACDB and Battery charges
· Installation of transformer accessories, radiator, fan, bussing, bass bar, carting etc.
· Assist to the testing and commissioning
· Modification of internal connection testing switch, relay, MCB and etc.
Project: Construction of new 132/13.18kv substation G-2 Project
Company: COOPER POWER SYTEMS – Industrial 2 Riyadh
Date: May 5, 2016 – May 11, 2016
Position: Electrical Technician
Job Description:
· Erection of Reactors
· Erection of the capacitor Bank
· Installation of the Surge Arresters, SA counter and its wire jumpers
· Installation of the CTs and the VTs
Project: BARRICK PUEBLO VIEJO
Company: KENTZ CARIBBEAN DR LLC
Date: December 1, 2011 – June 25, 2012
Position: Electrical
Job Description:
· Installation of Cable Ladder Tray
· Cable Pulling
· Installation of Gladding and Termination
· Termination of Power supply and Control
· Loop Checking and Migger
Company: Camarines Norte Electric Cooperative, Inc.
Daet Camarines Norte, Philippines
Date: July 29, 2010 – August 1, 2011
Position: Line Man
Job Description:
· Installation of Primary and Secondary Cable
· Cable Pulling of Primary and Secondary Cable
· Termination of Power Supply
Company: Camarines Norte Electric Cooperative, Inc.
Date: May 5, 2010 – July 24, 2010
Position: Practical Electricity (OJT)
EDUCATIONAL ATTAINMENT
TERTIARY:
La Consolation College
Daet Camarines Norte
Hotel and Restaurant Management (HRM)
S.Y. 2003 – 2004
VOCATIONAL COURSE:
Technical Education and Skills Development Authority (TESDA)
Ibirica, Labo, Camarines Norte
Building Wiring Installation –NCII
S.Y. February – May 4, 2010
SECONDARY:
Moreno Integrated School
Daet, Camarines Norte
S.Y. 1996 – 1999
PRIMARY:
Daet Elementary School
Daet Camarines Norte
S.Y. 1988 – 1992
TRAINING AND SEMINARS ATTENDED
· Basic Safety Training (Regulation VI of 1978 Convention as Mentioned)
· Fire Prevention and Fire Fighting
· Elementary First Aid
· Personal Survival Techniques
· Person Safety and Social Responsibility
· March 4, 2009
I hereby certify that above information is true and correct to the best of my knowledge and beliefs.
Jonnie E. Chavez
Applicant