Photo

Jose Alan Maynes Sr. Mechanical Engineer

Cavite, Philippines
• Project Engineering Management3D model review in AUTODESK NAVISWORKS FREEDOM 2013AutocadFacility and plant modificationsMicrosoft Access and Power Point.Microsoft OfficeMicrosoft ProjectPiping design and reviewsPiping estimates and supervisionStress Analysis using CAESAR –IIteam playerTechnical plan execution

POSITION APPLIED: MECHANICAL PIPING ENGINEER/MECHANICAL DESIGN ENGINEERING TECHNOLOGY
NAME : Jose Alan Delos Santos  Maynes
NATIONALITY : Filipino
NRIC/PASSPORT NO. : EB4507983
MARITAL STATUS : Married
DATE OF BIRTH :   March 1962

ADDRESS : Phase 3, Sta. Catalina AVIDA Residences – Salawag, Dasmarinas, Cavite, Philippines
CONTACT NO. : Mobile: +639052216777 or Tel. +6346-4165041
EMAIL ADDRESS : [email protected]
ACADEMIC QUALIFICATION
·      Bachelor of Science in Mechanical Engineering 1979 – 1984 University of Nueva Caceres, Naga City, Philippines
·      Registered Mechanical Engineer – Certificate/Licensed No. 0032312,  April 25, 1986 Manila, Philippines
·      Professional Mechanical Engineer – Certificate/Licensed No. 0004623,  May 6, 2013  Manila, Philippines
PROFESSIONAL AFFILIATION
·         Philippine Society of Mechanical Engineers (PSME) and American Society of Mechanical Engineers (ASME) Membership ID No. 100713371
SUMMARY OF QUALIFICATION
. Highly-motivated Senior Mechanical Engineer with over 24 years experience in oil & gas/petrochemical/power plant piping engineering design/analysis, construction and fabrication as well as mechanical equipment installation/maintenance supervision of gold mining processing facilities and building/housing facilities. Demonstrated competence handling major projects. Strong background in mechanical/piping systems/pipeline and components.
SKILL PROFILES
· Project Engineering Management, Team player, Facility and plant modifications, Technical plan execution, Piping design and reviews, Piping estimates and supervision, 3D model review in AUTODESK NAVISWORKS FREEDOM 2013, Stress Analysis using CAESAR –II , AUTOCAD, Microsoft Office, Microsoft Project, Microsoft Access and Power Point.

WORKING EXPERIENCES
March 1, 2015 – Present

PROFESSIONAL MECHANICAL ENGINEER – PME Licensed No. 0004623                                                                                                                                                    Private Practicing of Mechanical Engineering in the Philippines

October 20, 2013 – January 22, 2015                                                                                                                                                                                                             WORLEYPARSONS ENGINEERS LTD. Project Management & Consultancy (PMC) Kuwait

Projects:                                                                                                                                                                                                                                                                                     April 15, 2014 to January 22, 2015

1.   Central Gas Utilization Project – Gas Processing and Gas Gathering Production/Export Pipelines. (FEED)                                                                                              LEAD CONSTRUCTION ENGINEER – PIPING/PIPELINE (PMC/Client Side)

Act as Lead Design Engineer for the project.                                                                                                                                                                                                          Leads the execution of mechanical/piping/pipeline engineering designs related with the project scope with particular attention to: Design Basis, FEED and EPC scope, design/safety/operations reviews, procurement of equipment, vendor selection, and timely resolution of technical and engineering issues with relevant stakeholders. Involved in site surveys of Company facilities and to established and identified the actual study/project requirements. Developed FEED or basic design package of piping system in order to prove the feasibility and the cost estimate from the conceptual design.  Reviewed the design works and studies performed by the Engineering Consultants. Participate in design review meetings with Consultant at their home office. Coordinating with Projects and planning on project time schedules. Reviewed/approved the piping/pipeline FEED deliverables prepared by Contractor.

October 20, 2013 to April 14, 2014                                                                                                                                                                                                                                 2.   Wafra Joint Operation Integrated Master Plan for the development of existing Oil & Gas Midstream Facilities including Infrastructure. (Conceptual and Front End Engineering Design-FEED)                                                                                                                                                                                                                                 3.  Al Khazan Water Disposal. (Conceptual and Front End Engineering Design-FEED)

PIPING DESIGN ENGINEER (PMC/Client Side)

Reviewed the design works and studies performed by the Engineering Consultants and ensure that they are in accordance with the technical requirements and meet the standards. Participated in site surveys of Company facilities and to establish and identify the actual study/ project requirements. Provide engineering input to Statement of Requirement’s (SOR), and prepares piping/mech’l part of FEED Scope of Work (SOW). Involved in design review meetings with Consultant at their home office. Reviewed the piping/pipeline FEED deliverables.

December 19, 2010 – October 10, 2013

HESTON  Kuwait – Seconded to Kuwait National Petroleum Company KNPC, Kuwait

Projects:

1.   North LPG-Liquefied Petroleum Gas Tank Farm NLTF @ Mina Al-Ahmadi – MAA   Refinery

2.   Liquefied Petroleum Gas Train-4 (LPG) @ Mina Al-Ahmadi – MAA   Refinery

PIPING DESIGN ENGINEER (PMC/Client Side)

Reviewed/approved Engineering Procurement & Construction – EPC contractor’s deliverables for Detailed Design/Engineering as follows: pipe routing study, stress and flexibility analysis, piping/pipeline general arrangements, isometric drawings, pipe support drawings, valve data sheets, piping material specification, Material Requisitions (MR), Technical Bid Evaluation (TBE), Purchase Orders (PO) and other pertinent documents related to piping. Providing inquiries to design contractor in the design discrepancy and verified it at site. Monitoring the performance of EPC contractor. Attends to all project management activities relating to piping engineering. Performed and/or participated in related internal and external audits on behalf of the client, project and interface meeting, risk analysis and mitigation, HAZOP, constructability review, 3D model review at Contractor home office, etc., and take part in project decision making.

January 3, 2006 – November 11, 2010

AMEC Group Limited Oil & Gas PMC  Al-Tameer Annex Building, Ahmadi, Kuwait

Projects:

1.   Kuwait Oil Company (KOC)Major Project Group  EF1500-Facility Upgrade and Relocation of Underground   Process Piping for (GC)Gathering Center GC 3,4 6,7,8,21,23,Booster Station BS140 & BS 150

2.   Kuwait Oil Company (KOC) EF1451 Project-Modifications in Tank Vapour System, Crude Tank Filling Pipe Work & Reconstruction of Tanks @ SEK GC’s.

3.  Kuwait Oil Company (KOC) EF1701 40” Gas Pipeline from Booster Sta. BS-131 to LPG Plant @ MAA Refinery.

DESIGN ENGINEER – PIPING (PMC/Client Side)

Reviewed/approved Engineering Procurement & Construction – EPC contractor’s deliverables for Detailed Design/Engineering as follows: pipe routing study, stress and flexibility analysis, piping/pipeline general arrangements, isometric drawings, pipe support drawings, valve data sheets, piping material specification, Material Requisitions (MR), Technical Bid Evaluation (TBE), Purchase Orders (PO) and other pertinent documents related to piping. Providing inquiries to design contractor in the design discrepancy and verified it at site. Monitoring the performance of EPC contractor. Attends to all project management activities relating to piping engineering. Performed and/or participated in related internal and external audits on behalf of the client, project and interface meeting, risk analysis and mitigation, HAZOP, constructability review, 3D model review at Contractor home office, etc., and take part in project decision making. Reviewed “As-Built” Drawings (piping plans/equip. lay-outs) following completion of construction activities.

Nov. 1, 2003 – Nov. 29, 2005

SOFCON – A. Al Saihati & O. Al Othman Consulting Eng’g Co. Al Khobar, Saudi Arabia

Project: Saudi Aramco Oil & Gas Facilities (Onshore Pipeline/In-Plant Piping System) Budgeted Items (BI) and Engineering Work Order (EWO)

1.  Project Proposal for Mothballing Uthmaniyah Gas, Oil Separation Plant GOSP 1, 2 & 6 and to divert their production Pipelines to GOSP 7 & 8. (BI-10-00232) Maintaining & Optimizing Production in Mubarraz Area, Ghawar Oil Field.(Conceptual to Detailed Engineering Design) (BI)

2.   Rerouting of 12” Butane and 14”/10” Propane Existing Aboveground Pipelines supplied to IBN RUSHD Aromatics Complex from the ARAMCO NGL Plant @ Yanbu Petrochem. Complex Proj. (BI)

3.   Off – Loading System for North Riyadh Bulk Plant  (BI)

4.Upgrade Existing Reactor Product Condenser J24-E-303/304 @ Rastanura Refinery (EWO)

PIPING DESIGN ENGINEER

Conducts site survey to develop design aspects for Oil &Gas new/revamp projects. Developed of piping, valve data sheet and bulk MTO for piping and valves. Prepared basic and detail piping route design around pipe rack, horizontal and vertical vessels, pumps, compressor, exchangers, including utility station based on plot plan, P&ID and UHD, engineering and vendor drawing of equipments, piping materials, service class, with accordance to piping codes and standards. Have extensive knowledge in preparing plot plan and piping plan. Prepared Material Take Off of all piping materials as per isometric drawing. Checked the isometric drawing based on the project specification and standard, line condition, and all necessary design information, data specifications, procedures and requirements. Performed consistency checking for critical and large bore piping between extracted final isometric and flexibility analysis calculation results. Reroute and revised lines based on actual site condition, client’s comments and suggestion. 3D Modeling of all equipments, structures and piping route. Designed and organized preparation of pipeline alignment drawings and pipeline crossing drawings, general arrangement details, isometrics, bend schedules. Issued engineering drawings and layouts for Inter-Discipline Checks (IDC’s). Oversees and reviews the technical output of draftsmen.

September 17, 2002 – September 4, 2003

Saudi Consulting And Design Office (SCADO)License No. 418, Al Khobar, Saudi Arabia

Project: Saudi Aramco Oil & Gas Facilities (Onshore Pipeline/In-Plant Piping System) Budgeted Items (BI) and Engineering Work Order (EWO)

DESIGN SPECIALIST – PIPING

Developed optimum piping and equipment layout in accordance with client’s and other established standards. Checking 3D piping models. Preparing, updating and checking piping/pipeline deliverables including general arrangement and detail drawings, P &IDs, Isometrics and sketches in accordance with established quality procedures. Preparing M.T.O., drawings lists, equipment lists, line lists, valve lists and tie-in lists. Has also been engaged in final checking and back checking of general piping arrangement plans and its corresponding P- sketches/isometric drawings in accordance with Saudi Aramco design parameters specifications and standards. Performed as a Qualified Checker for project piping deliverables. Reviewing standard of design and capital cost estimates, drawings and other engineering outputs to ensure deliverables are fit for purpose.

July 2, 2000 – August 10, 2002

HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD. KUNOP Site Shuiaba, Kuwait

Project: EPC – New Oil Pier and Associated Topside Facilities Offshore Berth # 1,2,3 & 4 MAA Refinery, KNPC

PIPING ENGINEER

Site survey on the new tie-in location of onshore piping and Identify Tie-in points of all connections. Conducts risk assessment of existing pipelines using company risk manual. Reviewed plant information concerning assigned piping analysis activities and to obtain any additional information needed. Prepared isometric stress sketch drawings of the existing piping at refinery plant and gas plant area, and ensure that additional stresses caused by new facilities shall be within acceptable limits. Produced equipment layout and piping plans. Identified technical conflicts in layout design; coordinate with other engineering disciplines on solutions of technical irregularities. Prepared isometric drawings for final layouts and drawing for installation and construction. Providing clarification, guidance and technical support to construction and commissioning personnel. Performed design changes and alterations based on Design Change Notices (DCN’s) when required. Prepared “As-Built” Drawings (piping plans/equip. lay-outs) following completion of const. activities.

June 15, 1999 – May 8, 2000

ABDULLA AL MOAIBED ENGINEERING Licensed N0. 482 Al Khobar, Saudi Arabia

Projects: Saudi Aramco Oil & Gas Facilities (Onshore Pipeline/In-Plant Piping System) Budgeted Items (BI) and Engineering Work Order (EWO)

MECHANICAL/PIPING ENGINEER

Conducts site survey to develop design aspects for new/revamp projects. Preparation of Piping material specifications, equipments & piping layout studies. Pipe support designs. Review 3D & 2D Piping Modeling & conducting Pipe Stress Analysis. Provide stress and piping loads to civil engineering group, coordinate on technical issues as required. Coordinate Process, Civil and Structural disciplines during the development of Plan and Profile, P&ID and Overall Plot Plan drawings. Take care of issues related to engineering studies and materials selection, of line pipes, material type, grades, etc. Preparation of IFD, Issued for Design and IFC, Issued for Construction documents. Liaise with mechanical equipment package vendors and review and approve vendor doc.

April 3, 1998 to March 23, 1999

SAMSUNG ENGG & CONSTRUCTION CO. LTD.  Taiwan, Republic of China

Project: FORMOSA PETROCHEMICAL CORP. 900,000 MTA Ethylene Plant OLEFINS – II Project

PIPING SUPERVISOR

Planned & Allocated of Manpower, Materials & Equipments. Liaison with Quality Control Personnel for inspection and ensuring error – free. Supervised of Piping Pre – Fabrication and Erection. Supervised of Boiler Structure and Piping Erection. Coordination of Tank and pipe rack construction works. Inspection of the work to adhere to strict Quality Maintenance. Responsible for implementation to carry out the specified PWHT/stress relief heat treatment. Responsible of Contractors supply material as per Construction documents. Foresee constructability difficulties and prepare a solution. Participating in daily review meeting and report progress/areas of concern. Involved in Pre-Commissioning activities.

June 19, 1997 – November 25, 1997

PT TRUBA JURONG ENGINEERING Jakarta, Indonesia

Project: Construction of Pulp and Paper Plant, Paper Machine – 1 (PM I)

PIPING ENGINEER

Performed piping Line Check and prepared punch list then consult punch work with subcontractor. Assure that all pipe supports are properly installed of correct type and material. Follow up and perform back check of Punch Work. Prepared field materials requisitions for permanent plant materials which mainly affect punch clearing. Supervise and control punch clearing groups. Prepared progress report of punch cleared test packages for hydro testing. Performed piping reinstatement check. Responsible for preparing as-built drawing of modified lines as per site actual condition requirements and take the approval from Design Engineering Section.

May 30, 1996 – May 5, 1997

TECHNILINK (S) PTE. LTD.  Singapore

Project: ADI-PURE Plant Upgrade/Design Project DUPONT PETROCHEM. Pulau, Sakra

PIPING ENGINEER

Study the Field Design Memo and conduct site survey on the new tie-in location. Marked-up all items to be demolish/remove in the existing isometric and P&ID drawings. Revised and update all related existing drawings as required. Preparation of Piping material specifications, equipment & piping layout studies. Pipe support designs. Equipment layout arrangements. Responsible in responding to the technical queries arises during construction and prepare site-modified isometrics for fabrication and construction. Interpret design and assist Field Engineer in responding RFI (Request for Information) from the contractor. Preparation of as-built drawings (P&ID and Piping Isometrics); prepared final drawings from field sketches.

August 2, 1994 – December 23, 1995

IDRECO ASIA CORP. LTD. Site Mae Moh, Lampang, Thailand

Project: Flue Gas Desulfurization – FGD RETOFIT UNITS 8-11 & Water Treatment Plant for MAE MOH COAL THERMAL POWER PLANT

MECHANICAL ENGINEER

Coordinates engineering details for projects including providing assistance with inspection issues on and ongoing basis for mechanical/piping installation, preparing drawings and forwarding internal memo’s to concerned Departments and contractor for follow through to construction stage. Equipment selection and specification in collaboration with designers and bid evaluation/vendor document review and approval. Mechanical design of systems, including bulk materials handling, processing equipment, piping and rotating machinery, in accordance with the relevant client standards.

July 25, 1992 – July 28, 1994

FILIPPO FOCHI SPA Bandar Mashar, Kwoozestan, Islamic Republic of Iran

Project: Reconstruction of Vinyl Chloride (VC) Plant Area at Bandar Imam Petrochemical Plant Complex (BIPC)

PIPING ENGINEER

Reviewed piping drawings (plan, detail and isometric) and project specifications for correctness and clarity of information and take necessary action to ensure sufficient information is available. Organized material quantity take-off and estimates the quantity of materials, labor and services required and hand over the material requirement to the purchase department. Responsible for implementation to carry out the specified PWHT/stress relief heat treatment, inspection/test in accordance with relevant Inspection & Test Plans, and ensure that Quality Records are maintained. Responsible for pipe fabrication of high pressure piping, installation of pipe spool in pipe racks and equipment sub-units, piping alignment and installation of valves, preparation and completion of punch lists items, field checking of piping layout and installation, preparation of as-built drawings (P&ID and Piping Isometrics). Involved in pre-commissioning/commissioning activities.

July 20,1991 – July 19, 1992

ABV ROCK GROUP KB  Site-1 Project, Riyadh, Saudi Arabia

Project: 1. Saudi Strategic Storage Program (SSSP) 2.5 Million cubic meter Oil and Gas Underground Storage Facilities

GENERAL FOREMAN (STEEL)

Supervised and effectively control the activities involving the pre-fabrication and installation of underground storage steel tank including utilities piping system. Monitor and control the welding works during fabrication and installation. Ensure that the work standard are maintained in accordance with the approved drawings and specifications and within specified time schedule.

April 9, 1990 – March 24, 1991

SAFARI COMPANY LTD. Riyadh, Saudi Arabia

Project: ROYAL SAUDI NAVAL FORCE  Operation and Maintenance of Bldg/Housing Facilities (HVAC , Fire Protection system, Plumbing & Power Generating Unit)

MECHANICAL ENGINEER

Planning and Scheduling all existing mechanical equipment and related control system maintenance works for building facility involving HVAC and Power Generating Unit. Responsible for installing/commissioning of new equipment/machinery. Assessed plumbing and fire protection systems for buildings and residential infrastructure development, performing calculations for sizing of piping systems and selecting equipment.

November 3, 1989 – April 5, 1990

EURASIA HEAVY INDUSTRIES INC., Manila, Philippines

Project: Hush House – NOISE SUPPRESSOR SYSTEM for United State Air Force – USAF Aircraft Clark Airbase

QUALITY CONTROL INSPECTOR (MECHANICAL)

Responsible for the Quality Inspection regarding the installation of mechanical equipment for Hush House – NOISE SUPPRESSOR SYSTEM USAF Aircraft facility including nose lift elevator, fire suppressor and ramp strain; and structural steel works such as rail guide doors, anchor bolts, arch/tie beams, column, and augmentor tube for air muffler. Ensure compliance with the contract documents and specifications by directly performing surveillance tests as required in the technical provisions of the contract specifications and quality control program.

November 16, 1987 – July 29, 1988

ABCAR PARAGON MINING CORP., Longos Gold   Paracale, Camarines Norte, Philippines

Department: Maintenance/Engineering

MECHANICAL INSPECTOR

Involved during the refurbishment and maintenance of the existing Mine Underground/Mill Plant facility, and reporting to Maintenance/Engineering Manager to perform the following task: Performed daily inspection for all shutdown equipment maintenance, overhaul, repair and modification in all assigned area such as Mill Plant: ball mill, crushers, conveyors, pumps, piping system and etc., Diesel Power Plant: diesel engines, compressors, pump and piping system, and Mine Underground: hoisting/pneumatic equipment, air ventilation supply and dewatering submersible pumps. Undertakes studies and analysis related to mechanical/piping installation and maintenance including ordering, tracking and expediting materials.

June 26, 1985 – September 30, 1986

SURIGAO CONSOLIDATED MINING CO. INC. Gold Mine  Surigao del Norte, Philippines,

Department: Power/Mechanical Department

FOREMAN II

Shift In-Charge for the maintenance of Mine, Mill Plant and Power Plant mechanical equipments consisting of pumps, ball mill, crushers, conveyors, diesel engine and compressors. Duties included trouble shooting, overhaul, lubrication and scheduled maintenance on equipment. Participating in safety and quality programs. Prepared/submit daily accomplishment reports. Responsible for installing/commissioning of new equipment/machinery.
TRAINING/SEMINARS ATTENDED

·      Technical Seminar: HVAC Duct Design, Fabrication & Installation for Residential and Commercial Buildings –  Philippine Society of Mechanical Engineers (PSME) Kuwait Chapter, January 16, 2015/Technical Seminar: HVAC-Variable Refrigerant Volume system – (PSME) Kuwait Chapter, June 06, 2014/Technical Seminar: ROBERT”S RULES OF ORDER – (PSME) Kuwait Chapter, June 06, 2014/Technical Seminar: People Skills for Engineers & Technical Professional – (PSME) Kuwait Chapter, June 06, 2014/Technical Seminar: HVAC-Heat Load Calculation, HVAC Systems and Applications-(PSME) Kuwait Chapter, June 1, 2013 to August 24, 2013/Technical Seminar: Gas Oil Separation Plant – (PSME) Kuwait Chapter, December 13, 2013/Plant Design Management System (PDMS) Conducted by Ricky Padhiar of AVEVA Group Plc, SOFCON Office, No Certificate issued In-House seminar only, February 20, 2005/COMPUTER-AIDED DESIGN OF HEATING, VENTILATING AND AIRCONDITIONING SYSTEM (CADHVAC) – Crescent Technologies Institute, Inc. Manila, Philippines, (40 training hrs) from November 9 to November 20, 1992/COMPREHENSIVE COMPUTER-AIDED DRAFTING AND DESIGN – Crescent Technologies Institute, Inc. Manila, Philippines, (60 training hrs) from Oct. 5 to Oct. 23, 1992./HILTI Fastening Systems Safety Training Certificate – ABV Rock Group KB/ Safety, Saudi Arabia, April 19, 1992/International Technical Training Seminar of Lincoln Welding Electric Machine –Conducted By: Lincoln Electric Cleveland Ohio, USA, ABV Rock Group Riyadh, Saudi Arabia,  March 7,1992/Safety Induction Training Certificate – ABV Rock Group KB/ Safety Department Riyadh, Saudi Arabia, July 22, 1991/On The Job Training on Ice Plant Operation and Maintenance Procedures – Naga Ice Plant & Cold Storage Naga City, 1 month, August 1, 1988 to September 30, 1988/Project Operation, Planning and Control – Global Eng’g & Consultancy Services, Manila, 2 days, March 14to15, 1987
References

1.     Mr. Colum Cantillon, Principal Project Manager, WorleyParson JO Wafra Chevron Projects

E-mail: [email protected]    Mobile: +965-69004866

2.     Mr. Mark Quesada, Lead Piping Design Engineer AMEC KOC Project  E-mail: [email protected] Tel. +965-23861856

3.     Mr. Vic Carreon, MHPS Nagasaki, Japan E-mail: [email protected]

Education

March 1979 – March 1984 • Bachelor of Science in Mechanical Engineering at University of Nueva Caceres, Naga City, Philippines

Experience

October 20, 2013 - January 22, 2015 LEAD CONSTRUCTION ENGINEER - PIPING/PIPELINE (PMC/Client Side) at WORLEYPARSONS ENGINEERS LTD. Project Management & Consultancy (PMC) Kuwait
December 19, 2010 - October 10, 2013 PIPING DESIGN ENGINEER (PMC/Client Side) at HESTON Kuwait - Seconded to Kuwait National Petroleum Company KNPC, Kuwait
January 3, 2006 - November 11, 2010 DESIGN ENGINEER – PIPING (PMC/Client Side) at AMEC Group Limited Oil & Gas PMC to Kuwai Oil Company, Kuwait
Nov. 1, 2003 – Nov. 29, 2005 PIPING DESIGN ENGINEER at SOFCON – A. Al Saihati & O. Al Othman Consulting Eng’g Co. Saudi Arabia
September 17, 2002 - September 4, 2003 DESIGN SPECIALIST - PIPING at Saudi Consulting And Design Office (SCADO)License No. 418, Saudi Arabia
July 2, 2000 - August 10, 2002 PIPING ENGINEER at HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., Kuwait
June 15, 1999 - May 8, 2000 MECHANICAL/PIPING ENGINEER at ABDULLA AL MOAIBED ENGINEERING Licensed N0. 482 , Saudi Arabia
April 3, 1998 to March 23, 1999 PIPING SUPERVISOR at SAMSUNG ENGG & CONSTRUCTION CO. LTD. Taiwan, Republic of China