JOSELITO J. DIESTA
Action International Services L.L.C.
P.O. Box 86987, Dubai, U.A.E
E-Mail Address: [email protected]
Mobile phone no.: +971 55 2396547
EMPLOYMENT HISTORY
Action International Services L.L.C. July 15, 2008 to present
P.O. Box 86987, Dubai, U.A.E.
Nature of Company: Dewatering (Building Construction)
Electrician
Responsibilities:
· Responsible for the installation of electrical power generator, distribution panel board, control panel board and submersible pumps (Mody Pumps, Shakti and C.R.I Pumps) in the construction site to control the ground water level while construction is ongoing.
· Monitors all electrical facilities in the site. Ensures all installed electrical facilities are in good running condition during construction.
· Troubleshoots and repairs control panel boards such as magnetic contactor relays, timer relays, under current protection relays, earth leakage circuit breaker and other electrical devices on which submersible pumps are connected.
· Troubleshoots and repairs mobile tower lights, repair of submersible pumps such as Mody, CRI and Shakti pumps. Cleaning and servicing of AC generator. Troubleshoots and repairs basic electrical failures in generator such as diagnosing and changing the Automatic Voltage Regulator (AVR) or checking diodes inside the generator connected in rotor assembly when there is no power output in generators. Fabricating and assembling control panel board for submersible pumps.
Saudi Oger Ltd. October 2002 – March 2004
Riyadh, Kingdom of Saudi Arabia
Nature of Company: Operation and Maintenance
Low Voltage Electrical Technician
Responsibilities:
· Installed electrical wiring installation for new machineries not exceeding 500 volts and preparation of all electrical materials to be used for the installations.
· Tested and commissioned all electrical facilities not exceeding 500 volts before the construction department turn over to maintenance for operation. Carried out regular inspection to assure high reliability and good performance of the whole system.
· Repaired failures or anomalies prior to progressive failures and their consequences to avoid system failure. Performed scheduled preventive and routine maintenance on the system. Recommended appropriate action for equipment failures if damages were severe.
· Prepared specifications for all materials and spare parts required for ordering. Ensured the data given is the exact description for the desired parts.
· Directly reported to the Foreman.
Serg’s Products Inc. June 1999 – August 2002
Sto. Niño, Binugao, Toril, Davao City
Nature of Company: Cocoa Butter and Cocoa Powder Manufacturing
Plant Supervisor
Responsibilities:
· Worked as Plant Supervisor, responsible for plant operation and maintenance.
· Operations: Responsible for deployment of personnel to their respective duties and obligations. Ensure assigned positions were suited to their capabilities to ensure productivity.
· Prepared daily production reports, monthly inventory report and daily time records of all personnel. Checked and monitored all incoming materials and outgoing finish products and submitted to the Plant Manager.
· Maintenance: Responsible for monitoring and ensuring proper operation of all machineries and equipments. Carried out scheduled preventive and routine maintenance on the system as per task lists.
· Supervised the installation of new machineries and prepared all electrical materials to be used for the installations. Supervised the repair of all forms of equipment failures, as it called for electrical trouble-shooting, either by permanent repair or for immediate remedial measures, to put the equipment into operations.
· Carried out regular inspection to assure a high reliability and a good performance to the whole system. Repaired any failure or anomaly prior to the progressive failures and their consequences to avoid system failure. Recommended appropriate action for equipment failures if damages were severe. Prepared specifications for all materials and spare parts required for ordering. Ensured the data given is the exact description for the desired parts.
· Directly reported to the Plant Manager.
Serg’s Products Inc. June 1996 – June 1999
Ortigas Extension, Cainta, Rizal
Nature of Company: Chocolate Candies and Cocoa Powder Manufacturing
Cadet Engineer
Responsibilities:
· Responsible for the installation of new machineries for chocolate manufacturing and its cooling system. Prepared all electrical materials to be used for installations. Responsible for the most quickly trouble-shooting of industrial electrical equipment and machinery, repair of all forms of equipment failures, as it calls for electrical trouble-shooting, either by permanent repair or for immediate remedial measures, to put the equipment into operations.
· Carried out regular inspection to assure reliability and good performance of the whole system. Repaired any failure or anomaly prior to the progressive failures and their consequences to avoid system failure. Recommended appropriate action for equipment failures if the damaged was severe. Prepared specifications for all materials and spare parts required for ordering. Ensuring the data given is the exact description for the desired parts.
· Directly reported to the Shift Engineer.
Saudi Oger Ltd.: December 1991 – December 1995
Riyadh, Kingdom of Saudi Arabia
Nature of Company: Building Construction
Site Electrician
Responsibilities:
· Responsible for the installations and maintenance of temporary electrical power needed in the construction project site, such as installation of electrical power generators, panel boards, lighting fixtures, electrical socket for all machines, telephone lines and intercom that were using in the project site.
· Responsible for the most quickly trouble-shooting of construction electrical equipment and machinery, repair of all forms of equipment failures, as it calls for electrical trouble-shooting, either by permanent repair or for immediate remedial measures, to put the equipment into operations. Recommended appropriate action for equipment failures if the damages were severe. Prepared specifications for all materials and spare parts required for ordering. Ensured the data given is the exact description for the desired parts.
· Directly report to the Foreman.
Serg’s Products Inc. February 1990 – December 1991
Ortigas Extension, Cainta, Rizal
Nature of Company: Chocolate Candies and Cocoa Powder Manufacturing
Electrician
Responsibilities:
· Responsible for trouble-shooting of electrical equipment and machinery for chocolate manufacturing and its cooling system,
· Repaired all forms of equipment failures, as they called for electrical trouble-shooting, either by permanent repair or for immediate remedial measures, to put the equipment into operations.
· Recommended appropriate action for equipment failures if the damages were severe.
· Prepared specifications for all materials and spare parts required for ordering. Ensured data given is the exact description for the desired parts.
· Directly reported to the Foreman.
Academic Qualifications
Bachelor of Science in Electrical Engineering 1982 – 1988
Graduate
University of the East
Samson Rd., Caloocan City
Computer Technician Course 2001 – 2002
Graduate
Interface Computer College
C. Bangoy, Davao City
Professional Development
Electrical Technology
Electrical Wiring Installations (Industrial and Residential) October 15– December 3, 1989
Conducted by Rotary Club of Marikina and Marikina, Institute of Science and Technology
Computer courses
Basic Computer Hands On: July 15 – October 12, 1996
Conducted by Technical Education and Skills Development Authority & Marikina Manpower Development Center (MMDC)
Computer trouble-shooting, repair and installations seminar: February 9 – March 2,2002 Conducted by Interface Computer College, Davao City
Personal Data
Name : Joselito J. Diesta
Date of Birth : October 30, 1965
Place of Birth : Manila
Age : 50 years old
Nationality : Filipino
Sex : Male
Height : 170 centimeters
Weight : 85 kilograms
Language Spoken : Tagalog and English
Professional References:
Mr. William Sy
Plant Manager
Milestone Garments Manufacturing
Unit B Almeda St., Tondo Manila
Eng’r. Victoriano J. Santos
Supervising Consultant – Recruitment Services Group
EDI-STAFFBUILDERS INTERNATIONAL
Julie V. Bantang
#1018-K Hermosa St., Tondo, Manila, Philippines