Photo

julian pina ingenieria

mexico

2019 – 2020 FEBRUARY BENAYA COMERCIALIZADORA
Production Leader
• Design of Drawings (Die) for the Manufacture of Cardboard boxes.
• Production Control of Cardboard boxes and finished Product for various items (main Parisian
clients, manufactures).
• Control of Inputs and Outputs of Material, for the elaboration of Cardboard boxes. Finished
Product Control.
• Coordinate purchases and deliveries with suppliers of Cardboard, Drawings and Raw Material for
Production.

Manager of 6 People for Production
2018 – 2019 CFFIXTURES (Queretaro)
Design Engineer – Manufacture
Working in the area of New Products Design, Modification of Existing Designs and Detail Drawings
of Fixtures for automotive area tests.
Control of Work Folders.
Sent of Designs for client approval, by CIMATRON software
Manufacturing Supervision of Parts for creation of fixtures.
four people in my charge.
2017 – 2018 BENAYA COMERCIALIZADORA
Production Leader
• Design of Die for the Manufacture of cardboard boxes.
• Production control of cardboard boxes for various items.
• Control of Inputs and Outputs of Material, for the elaboration of boxes of
Paperboard. Control of Finished Product.
• Responsible for 6 people for production.
APRIL 2014 – OCTOBER 2016 INTEVA PRODUCTS Cd. Juarez Chih.
IMDS and Material Administrator
• Responsible for receiving, reviewing and approving materials that reach the IMDS system
(International Material Data System) by different suppliers.
• Reviewing the different points for the approval of the materials, such as type of material, material
is within specifications, weight of the material and material is not prohibited by the GADSL (list of
reportable substances global automotive).
These materials are used for the assembling requested by different customers as Ford, GM,
DAIMLER, BMW for the manufacturing of different automotive parts.
• Knowledge of REACH (European Regulation concerning the registration, evaluation, authorization
and restriction of chemical substances and mixtures), knowledge of Annex II (European Parliament
and of the Council on end-of-life vehicles)
• Responsible for the List of Materials Matrix, Develop metric lists of suppliers and customers.
• Durometer hardness Rockwell (metals)
• Metallography handling equipment (Polisher Machine, Mounting Press Machine, Precision
Diamond Saw Machine)
• Control Master List and assignment of numbers of materials and specifications
JUNE 2007 – APRIL 2014 INTEVA PRODUCTS Cd. Juarez Chih.
Team Leader Design Engineer
• Group leader in the design area. Specific program for GM, MAGNA
GENII Responsible for four designers.
Control changes BOM revision and updating Product Part Numbers, drawing revisions
Administration.
Delivery drawing and math model for three different clients quotes, by UG NX software to
customers
Reference control, Drawings-Models in Team Center
• Worked developing new project, Responsible of developing design and drawing of new projects of
latches GM. Specifically working for the GLOBAL group.
I was in charge of three designers
• Control working requests, creation of new products and changes in products already created
according to customer needs
JUNE 2004 – JUNE 2007 (CLOSURES) DELPHI Automotive Systems Cd. Juarez Chih.
Team Leader Design Engineer & Quality Control Dwg.
• Worked on development of new project, Responsible of developing design and drawing of new
projects of latch. GM, VW.
• Control and Checking, GD&T structures of drawings. Customer, Delphi (CLOSURE)
• (CLOSURES) Team leader in the design area (Specific program for GM GLOBAL)
I was responsible for three designers
SEP 1999 – JUNE 2004 Turbo maquinas Ingeniería Avanzada S.A de C.V. (G E)
Querétaro
Detailer Advanced
• Worked and trained at General Electric Aircraft Engines
Configurations & Systems center since 05/2001 until 07/2001 Evansdale, Oh
• Worked and trained at General Electric Aircraft engines
Systems center since 09/2001 until 11/2001 Evansdale, Oh
• Global engineering training program since 05/2001 until 11/2001 Evansdale, Oh
• Worked on TIA’s Product Definition Configurations & Systems Team,
Involved Projects

APRIL 1997 – SEP 1999 Carrier Transcicold México S.A de C.V México
Designer& Detailer
• Worked on development new project
• Responsible to design and develop new parts for air conditioning
SEP 1996 – MARCH 1997 B G H Cd. Juarez Chih.
Designer & Detailer
• Develop new parts for pneumatic machine
JULY 1994 – SEP 1996 PEICO S. A. de C. V. Edo. Mex.
Designer & Detailer
• Worked in the development to design new projects of illumination parts
• Responsible develop designing and drawing of new projects of
Illumination parts
JANUARY 1987 – JUNE 1994 Holophane S. A. de C. V. Edo. Mex.
Designer & Detailer
• Worked in the development to design new projects of illumination parts
• Responsible develop design and drawing of new projects of
Illumination parts
• Communication with suppliers, for the creation and validation of molds, dies, and packaging for lighting
production units
• Equipment Quality Control
• Control of Warehouse and Shipments of Finished Product. Logistics Administration

Education

1990/1998 8.7 at unam