A creative civil engineer,who believes knowledge is power, is experienced for 8 months in engineering design from the initial conceptual stage,through the feasibility study and to detailed design. Along with that , been working for 3 years and 7 months at site and office, which is in building and water construction. Physically and mentally, fit to work in either office or sites. Have a good knowledge in building structures and a person who works towards with the aim of becoming a charted/professional engineer, is willing to improve his professional development career with education as well as gaining work experience.
● Professional membership
*Registered Graduate Engineering Member – Institution of Civil Engineers (UK) – Since 2015
*Member – Institution of Engineers Sri Lanka – Since 2015
●Professional License
* Construction Safety Course For Project Manager – Feb 2018 to present
* Develop a Risk Management Implementation Plan – Feb 2018 to present
*Managing Work at Height Course – Feb 2018 to present
●Professional
*Manpower Management
*Conducting Concrete Testing
*Ms Office package, Email and Internet System
*Project Management
*Preparation of budget.
■ Personal
* Professional Conduct ,Safety Conscious, Can handle stress, Problem Solver, Attention to details
*Final year dissertation entitled “High Performance Concrete ”
*Final year integrated group project: worked in a group of four and acted as a team leader, to design and evaluate a 6 story apartment building, 4 meters away from the coast according to clients brief. Involved teamwork and used euro code standards to design.
Advance diploma in professional draft ing with Autocad (distinction),final individual project of drafting a house using autocad as per clients brief in 2 plan viewe, elevatons, 3D modeling, rendering, lighting eTc &produced detailed drawing
*Preparation and submission of method statement, Risk Assessment, Safe work procendures, Project quality plan
* Preparation of trial mix and relevant test according to euro codes
*Presentation of the job activities and the sequence to the clients
* Preparation of initial budget and following up with site activity record every month
* Co-ordination with consultants, main contractor and head office authorities prior to further construction approval.
* Preparation of material quantities for construction.
*Preparation of man power.
Involved in construction of 2000m3 ground reservoir and pump house for national water supply and drainage board at polonnaruwa, Sri Lanka.
* based on the construction,I am responsible for excavation of soil ,rock chemical blasting, bar ben ding, shuttering work, concrete work and DI, PE pipe laying, connecting testing.
* Co- ordination with consultants and head office authorities prior to further construction approval
* Preparation of BOQ as for the tender documents and CIDA rules.
* Preparation of material quantities for construction
*Preparation of purchase Request,purchase order,goodo Receiving Note,daily progress report,inspection request, maintenance of stock books.
*handling with leveling instrument
*liaising with sub-contractors and handling their labour force to prepare the rebar and form works
*introduced and gained knowledge in new plastic formwork system
*Dealing with heavy equipment’s such as doosan DX225 track excavator and VW 210 wheel excavator
*involved in a 756 housing unit and infrastructure construction for Saudi Arabian government,city council.
*based on the construction, I’m responsible for construction of road work such as bedding, backfilling, storm and sewer GRP pipe line laying, manholes reinforcing,concreting, substation sub structure, lighting pole fixing, water line laying and water retaining structure construction.
*coordination with my fellow Civil Engineers, Mechanical Engineers and electrical engineers to meet the project requirements on time, as scheduled.
* Produced daily report on construction and get approved by construction manager, and prepared the weekly report to the project manager, construction manager and the main head office authorities to identify the work done on the project.
* Prepared bar bending schedules for manhole construction, time sheet for heavy equipment and over time for labourers in addition to that I have been responsible for coordination drawings.
* Liaising with sub contractors and their machineries such as breaks, excavators, cranes, bulldozer etc.
* In addition to that I have been responsible for plastering works for villas and have completed plastering works for more than 75 villas.
* Responsible for construction of up to 3 storey RCC buildings at marshy areas according to the structural brief
* Worked on quality controller as in slump testing and compression testing.
* Prepared BOQ for the construction activities after completion of structures.
* Responsible project planning according to the specification and maintaining safety standards.
* Managing 5 sites at once as a consultant, a leadership and a proper guidance given while at sites.
* Utilized packages – auto CAD etabs, prokon 2.6 Ms office package and emails.
* Collecting evidence on regular sites checkups and updating the situation to senior structural Engineer.
* Urban Development Project (Slump clearance)
●Involved in a design of 16 storey high rases building for urban development authority. Based on the architectural drawings, did designed and evaluated pile caps, plinth beams, floor beams, Ground slab, floor slab, lift pits and machinery rooms BS Codes.
* Risk free design procedures were followed while designing every element.
* Worked individually for design purpose, along with chatted structural Engineer who checked and approved the design.
* Followed with 3 CAD technicians to plot the out come and team work played and important part in an engeering environment.
*Preparation of design technical reports.
*Attending site for regular checkups and made some relelevant comments.
* Attending meetings with contractor and client regarding design issues, and given solutions.