Julius O. Victorio
Poblacion, Binalonan, Pangasinan
Mobile Number: 0926-663-0654
Email Address: [email protected]
Objective
Looking for a position as a Telecommunication Engineer/Telecommunication Technician in a multinational organization where my engineering, managing and supervising skills will support to provide quality services and also a golden chance to explore my career in this field.
Summary of Qualifications
• I have sound experience of more than 8 years in this filed and learn a lot of new techniques to the things in a better way.
• Deployment of personnel (team) in different site (areas).
• Checking of documents required by the Company to be submitted for billing.
• Site survey for installation of power cable and replacement of power system.
• Site survey for Technical Site Survey Report (TSSR).
• Estimate materials for power redundant (MSC).
• Trouble shooting of TELECOM equipment (WIRELINE).
• Preparing survey and report for installation of Auto Voltage Regulator (AVR).
• Site End to End project.
Employment History
Sub-Contractor/Field Engineer 2009 to Present
VERACITY/POWERITE MAKATI PHILS.
• Maintenance of communication Equipment, such as Ericsson 3G, HUAWEI 3G.
• Installation of Expansion Frame for additional primary subscriber line of HUAWEI UA5000 and SAM 960.
• Port Augmentation of HUAWEI UA5000.
• Port Augmentation of SAM 960
• Testing of static IP data line E1 subscriber.
• Migration of subscriber from DLC to HUAWEI UA5000 equipment.
• Upgrade software version of cards for voice and data (HUAWEI UA5000).
• Conduct testing for soft switch features (ZTE core switch) that can support by the equipment (HUAWEI UA5000).
• Commissioning of HUAWEI COPA card (use for fiber optic transmission).
• COPA card testing, using BER tester.
• Asset tagging of OSN 3500 and BWS 1500.
• Decommissioning of FUJITSU switch Equipment.
• HUAWEI UA5000 Equipment restoration (TYPHOON ONDOY, PEPING).
• Commissioning of MSAN HUAWEI UA5000 wire line equipment.
• Installation and Commissioning of HUAWEI MA5616.
• Site survey for installation of New Power Rectifier.
• Power cable lay-out survey.
• Power cable Installation (AC/DC power cable).
• Installation of New ACDPB and DCPDB breaker panel.
• Power cable Installation lay-out plan.
• Power Tapping (MAIN LINE to EQUIPMENT).
• Battery change-out DMPI SUN CELLULAR, GLOBE TELECOM, and SMART COMMUNICATION wireless sites.
• Assembly and power cable tapping of new battery rack and battery supply.
• DC supply upgrade Installation.
• Calibration of Rectifier power system.
• Construction of basepad, lay-out of power cable, installation and power taping of AVR (50 and 75 KVA).
• Radio Frequency scanning.
• Installation of Ericsson equipment (5G).
• Antenna change-out (Ericsson).
Education
• SYSTEM TECHNOLOGY INSTITUTE (STI)
New Lucban, Baguio City
Bachelor of Science in Computer Engineering 2001-2006
(Under Graduate)
Personal Data
Date of Birth: July 14, 1982
Age: 35 yrs old
Sex: Male
Marital Status: Married
Spouse Name: Ruthie Jane C. Victorio