Photo

Kenneth Yeban Dataylo Civil Engineer

Philippines Kenneth Dataylo
Can Manage group of workers to work in accordance to work schedule with minimum supervisioncan operate AutoCad and Sketch Up application software

Kenneth Y. Dataylo

 

Address           :  15-A Santan St., OLVINA Homes, Potrero,

Malabon City, Metro Manila, 1475

Email Add.       :  [email protected]

HP.  No.          :  +63 927 587 8805

 

 

Employment History

 

December 15, 2017– Present

Company                    : ViMS Builders

Position Title               : Project Civil Engineer

Project                        : Four E-com Building Project (Architectural Works)

Location                     : Manila, Philippines

Work Description        :

·         Lead and Supervised a construction team to perform as per detail and schedule

·         Audit Safety requirements for all site personnel

·         Evaluate Sub-contractors work accomplished for claim

·         Reports directly to the Project Manager.

Achievements               :

Secure work schedule on time for structural and architectural activities
Managed a team of skilled workers to their assigned task based on schedule.
Complete the project with minimal problems encountered on site.
September 01, 2015 – December 10, 2017

Company                    : Eng Han Engineering Sdn. Bhd.

Position Title               : Project Civil Engineer

Project                        : Sutera Ave. Residences (12-Storey Mixed Used Building)

Location                     : Kota Kinabalu, Sabah, Malaysia

Work Description        :

·         Prepare Daily Activity Report

·         Prepare work schedule as per master plan schedule

·         Supervised Sub-contractor and Admin workers to finish their task as per schedule

·         Evaluate Sub-contractors work accomplished for claim

·         Reports directly to the Project Manager.

Achievements               :

Secure work schedule on time for structural and architectural activities
Managed a team of skilled workers to their assigned task based on schedule.
Complete the project with minimal problems encountered on site.
November 05, 2014 – July 24, 2015

Company                    : Sara Timur Sdn. Bhd.

Position Title               : Architectural Engineer / QA/QC Engineer

Project                        : Sutera Ave. Residences (12-Storey Mixed Used Building)

Location                     : Kota Kinabalu, Sabah, Malaysia

Work Description        :

·         Prepare Daily Activity Report

·         Inspect and Monitors site activities in accordance to Quality Control Plans

·         Prepare NCR & CAR for non-complying activities

·         Supervised Sub-contractor and Admin workers to finish their task as per schedule

·         Evaluate Sub-contractors work accomplished for claim

·         Reports directly to the Project Manager.

Achievements               :

Assigned architectural (wet) works was completed ahead of schedule
Managed and Lead a team of supervisors with skilled workers for architectural works
Promoted from QA/QC Engineer to Architectural Engineer
Completed the task with minimal problems encountered on site.
Aug 2012 – November 2014

Company                     : Green Works Construction

Position Title                : Project Civil Engineer

Project                         : The Sonoma Project (Roads, Land Development, Residential Bldgs.)

Location                      : Laguna, Philippines

Work Description         :

·         Review all preliminary reports including advanced planning for the project.

·         Reviews location of existing utilities for possible conflict and relocation. Establishes need to carry utilities and provide for future utilities.

·         Determines architectural features in cooperation with Design Engineer and Structures Aesthetics Section.

·         Coordinates structural details and design features within the project. Conducts meetings with designers and detailers as required.

·         Review entire project for continuity and completeness.

·         Supervises project staff.

Achievements               :

Secure work schedule on time with minimal problems encountered.
Managed a team of skilled workers to their assigned task in timely manner.
Able to delivered several projects in time.
July 2010 – June 2012

Company                     : Shang Properties Inc.

Position Title                : Civil Site Engineer

Project                         : One Shangri-La Place (63-Storey Mall/Residential Building)

Location                      : Metro Manila, Philippines

Work Description         :

·         Preparation of tender documents

·         Preparation of contracts, including details regarding quantities required materials

·         Measuring of and payments to contractors and subcontractors, along with certification and settlement of final account

·         Allocating upcoming work to contractors

·         Evaluate all civil processes and ensure efficient quality control and provide support to engineering team at all times to maintain work schedule

·         Administer all structural and architectural activities and supervise efficient working manpower.

Achievements               :

Completed the task with minimal problems encountered.
Maintained high quality standards works for the whole project.
Apr 2008 – Aug 2009

Company                     : Obayashi Corporation

Position Title                : QA/QC Engineer

Project                         : Dubai Metro Rail (Green Line)

Location                      : Deira, Dubai, UAE

Work Description         :

·         Reports to Chief QA/QC Engineer; Station Manager.

·         Implements QA/QC plans, inspection and approved method statements/test plans/procedures

·         Ensure proper documentation for all incoming materials and activities incorporated to the project.

·         Coordinates all quality inspection with the client representatives/consultants.

·         Ensure all activities in tunnel and underground stations are ready and complies with approved procedures prior to inspection with the consultants.

·         Coordinates tests and material sampling activities to third parties, such as MPI tests, FDT, UT, etc.

·         Reports all non-conformity to construction team and monitors their close out.

Achievements               :

Handle a team of QA/QC that lead to be a document efficient site during internal/external audit
Maintained high quality standards works for the whole project.
Promoted from Site Engineer to QA/QC Engineer
 

 

 

 

Feb 2006 – Apr 2008

Company                     : EEI Corporation

Position Title                : Senior QA/QC Engineer – II

Project                         : St. Francis Shangri-La Place Tower (65-Storey Residential Building)

Location                      : Metro Manila, Philippines

Work Description         :

·         Witnessing and sentencing of all site inspections

·         Ensure that all inspection reports are accurate and that all attached documents are current status

·         Review all inspection reports for compliance

·         Assist the site QC manager in the organization, maintenance and control of the quality system

·         Liaise with the site construction engineers and provide assistance when requested

·         Prepare nonconformance reports to the QA manager and assist in developing corrective actions

·         Assist the QC manager and construction manager in resolving any discrepancies and ambiguities

·         Review work procedures and method statements for compliance with good work practices and the customers contract specializations

·         The issuance of nonconformance reports in conjunction with the site QC manager

·         The completion of QC site instructions and coordinate their closure

Achievements               :

Promoted from Engineer I to Engineer II.
Handle a team of QA/QC that lead to be a document efficient site during internal/external audit
Sep 2005 – Feb 2006

Company                     : Phoenix Ready Mix Concrete, Inc.

Position Title                : Batching Plant Operations Supervisor

Project                         : Various Projects (Roads, High Rise Bldgs., Residential Bldgs.)

Location                      : Metro Manila, Philippines

Work Description         :

·         Monitors concrete pouring through site engineer

·         Conducts site visits prior to setup of concrete pumps

·         Prepares daily activity reports and batching plant productions

·         Coordinates concrete quality thru QC Engineers on site and batching plant

·         Prepares schedule for batching plant maintenance and calibration of concrete conveyor

·         Schedules and Mobilizes concrete pump to site

·         Coordinates with motor pool department for repairs and maintenance during operation.

Achievements               :

Promoted from Site Engineer to Batching Plant Operations Supervisor.
Provided a scheme that enables batching plant to deliver concrete to simultaneous site without delay.
June 2002 – Feb 2005

Company                     : Emergo Construction and Development Alliance Corporation

Position Title                : Field/Site Civil Engineer

Project                         : Residential Projects

Location                      : Metro Manila, Philippines

Work Description         :

·         Project supervision of three bedroom residential construction with swimming pool from lay-out, erection of forms, placing of concrete, to finishing works

·         Project supervision of two-storey residential with roof deck construction from lay-out, erection of forms placing of concrete, to finishing works

·         Project supervision of five-units, two-storey apartment renovation from retrofitting of structural members to finishing works

·         Prepares architectural / structural plans and construction estimates

·         Coordinates project activities and implementation of the project quality plan

·         Write technical queries, monitoring of progress

·         Prepares and evaluates progress accomplishments

 

Achievements               :

Finished several residential projects with minimal problems encountered.
Lead and managed group of experienced skill workers without man-hour loss incident.

Education

June 1999/March 2002 Degree on Bachelor of Science in Civil Engineering at Technological Institute of the Philippines

Graduate

june 1995/March 1998 Degree on Bachelor of Technology in Civil Engineering Technology at Technological University of The Philippines

Graduate

Experience

December 2017/Present Project Engineer at ViMS Builders
September 2015/December 2017 Project Engineer at Eng Han Engineering Sdn. Bhd.