Photo

Marcos Justin Mendoza Carolino II Registered Mechanical Engineer

Manila, Philippines
AutocadFacilities ManagementMechanical engineerMicrosoft OfficePlant Maintenance EngineerProject Management

Marcos Justin M. Carolino II

66 B Administration Street, GSIS Village, Project 8, Quezon City, Philippines, 1106

(+63)927-273-7995 / (+63)908-936-7515

[email protected] / [email protected]

 

PROFESSIONAL                             REGISTERED MECHANICAL ENGINEER

CERTIFICATION                  Mechanical Engineering Licensure Exam, September 2015

 

COMPUTER                 Languages:         MATLAB, C

SKILLS                          System:               Windows

Software:             Microsoft Office, AutoCAD

 

MEMBERSHIPS    UP Manila Salinlahi, member, 2010

·      Organizer, Palarong Panlahi (1stsem AY 2010-2011)

.      UP Diliman Club Xientia (CX), member, 2011

·      Organizer, UPCAT Review for QCSHS Seniors Batch 2012 (AY 2011-2012)

CFC Singles for Christ (SFC), Assistant Facilitator 2013-2014, Member 2017

·      Assistant Facilitator, Christian Life Program 1 (2013)

·      Assistant Facilitator, Christian Life Program 2 (2014)

 

SEMENARS/TRAININGS

·         Completed 70 hours AutoCAD Autodesk Training (Certificate No.: 1424GJLZ28)

 

MAYNILAD TRAINING:

·         RA 1081 Anti-Illegal Seminar

·         Maynilad Standard Drawings and Safety Training

·         Advanced Excel and Visual Basic Seminar

·         Programmable Multi Axis Controller Seminar

·         Non-revenue Water Seminar

·         Business Continuity Management System Seminar

·         Materials Training and Maynilad Standard Drawing Seminar

·         Basic PI-Data Link Training / Structure

·         Non-Revenue Water Assessment Training

·         System Applications Product Training

·         Netbase Training

 

ISLA LPG CORP TRAINING UNDER U.P.  N.E.C.:

·         Process Safety and Efficiency

·         Lean Manufacturing Design and Value Stream Management

·         Manufacturing Planning and Control Framework

·         Maintenance Management

·         Facility Management I

·         Product Management

·         Understanding the Market/Industry (LPG)

·         Product and Process Life Cycle Analysis

·         Value Engineering

·         Product and Process Life Cycle Management

·         Environmental Management (Pollution Prevention and the Environmental Protection System

·         Facility Management II

·         Supply Chain /Logistics

·         Project Management Review

·         Concept of Total Quality Management for Continuous Process Improvement including Statistical Process Control

·         Selected Properties of LPG – critical properties of gases in compliance to ASTM D1853

·         LPG Equipment Design and Installation

·         Other LPG Applications

Education

June 2010 - June 2015 Bachelor of Science in Mechanical Engineer at University of the Philippines

College Scholar (1st semester AY 2011-2012)

Electives taken: Elementary Statistics, Naval Architecture

UNIVERSITY PROJECTS
Model Two-Cylinder Engine

·         Design and build a paper prototype and a two-cylinder engine model using recyclable materials

Model Four-Cylinder Engine with Firing Order

·         Design and build a four-cylinder engine model with firing order (1-4-3-2) that is able to withstand at least twenty cycles without delays and breaks

Mechanical Whiteboard Eraser

·         Design and build a mechanical whiteboard eraser that can erase all the whiteboard marker writings of the entire board with one swipe.

Downdraft Gasifier-Engine-Generator System

·         Design and build a downdraft gasifier that can generate power up to 5 kW with a cooling and filter system. Fuel used is Talisay Mesocarp.

June 2006 - April 2010 Secondary Education at Quezon City Science High School

Merits
• Participant, 23rd Mostratec International Research Project Competition in Novo Hamburgo, Brazil (November, 2008)
• Best in Research (AY 2008-2009)
• Best in Theater Arts (AY 2009-2010)
• Lead Actor, School Play: Complete Works of William Shakespeare (AY 2009-2010)
• 1st place, Gov. Cresini Oratorical Memorial Cup, District Elimination (AY 2009-2010)

Experience

January 2018 - Present Plant Maintenance Engineer at Isla LPG Corporation

Plant Maintenance Engineer – Technical Services & Engineering Department

·         Setup Plant Maintenance Database, instates programs and manages to ensure equipment dependability

·         Monitors & identifies equipment for upgrade to efficiently & safely operate all plants

·         Coordinates and liaises with other departments for maintenance needs of the plants

·         Ensures compliance to HSSE or other local government requirements for all projects

·         Actively participates in technical and engineering projects on development, strategy and implementation

·         Leads engineering projects involving synergies and cooperation with other industry players

·         Prepares detailed cost estimates of LPG projects and conducts tender in accordance with company regulations

·         Supervises projects of LPG installations and piping system and ensures compliance to HSSE requirements

·         Ensures projects are implemented within the budget cost and schedule

·         Conducts compliance check and safety audits on LPG Filling plant & industrial/commercial installations and initiates corrective action

·         Coordinates with Procurement and suppliers on sourcing of LPG equipment appurtenances

·         Ensures optimum utilization of LPG assets and resources

·         Organizes and conducts safety trainings for contractors

·         Prepares and implements safety programs for the department

·         Assesses safety performance of project contractors

Notable Projects:

o    Design and Project Management of 855cubic meter fire water tank and above ground pipeline layout

o    Design of LPG Filling Plant (Currently in Construction Phase)

o    Project Management of Full Requalification 500MT LPG Bullet Tank

December 2015 - December 2017 Business Area Engineer at Maynilad Water Services Inc.

Operations & Maintenance Unit / Planning and Analysis Unit

·         Prepares daily job assignments of technical teams.

·         Awards Job Orders (JO) to contractors.

·         Monitors in-house and contractors’ daily activities and accomplishments.

·         Consolidates accomplishment reports submitted by technical team and submits to O&M Supervisor.

·         Conducts joint inspection/validation of contractor billings with Admin Specialist and contractors.

·         Checks contractors’ billing statements prepared by Administrative Services.

·         Closes resolved issues in Customer Service Information System (CSIS).

·         Prepares Quantified Benefits (QB) report by using the data provided by Zone Management and project cost estimate to determine Return on Investment (ROI)

·         Monitors daily materials withdrawn and used by technical team and contractors

·         Prepares Reports on Supply, Billed Volume, Water service Connection, NRW and Revenue.

·         Transmits related metering Job Order Accomplishment Reports (JOAR) to Commercial Management and to Geographic Information System Specialist.

·         Reviews and consolidates contractors’ accomplishments and checks if they are in accordance with MWSI standards and specifications and submits said accomplishments to Zone Management, Administrative Services and Commercial Management.

·         Assists in preparation of long term or five year plans by consolidating the QB of all proposed CAPEX projects.

·         Prepares Annual Material Requirements (AMR) by estimating the materials to be used by the contractors and in-house teams.

·         Prepares reports on supply, billed volume, water service connections, NRW and revenue.

·         Prepares Job Order (JO) reports and issues JO to contractors based on reports/complaints endorsed by Zone Management to Technical Management.

·         Assists BA Officer in supervising in-house and contractors’ activities of All Works OPEX projects short pipe-laying, interconnections, metering, valve installations and replacements, etc. that include supervision with PMG group for implementation of CAPEX projects in accordance with MWSI standards.

·          Assists BA Officer in ensuring that contractor’s major activities conform to MWSI specifications.

Notable Projects:         

o    Redesign, reconfigure and re-launch JOAR monitoring System (IVES)

o    Creation of monitoring system for New Installation Job Orders