Marcos Justin M. Carolino II
66 B Administration Street, GSIS Village, Project 8, Quezon City, Philippines, 1106
(+63)927-273-7995 / (+63)908-936-7515
[email protected] / [email protected]
PROFESSIONAL REGISTERED MECHANICAL ENGINEER
CERTIFICATION Mechanical Engineering Licensure Exam, September 2015
COMPUTER Languages: MATLAB, C
SKILLS System: Windows
Software: Microsoft Office, AutoCAD
MEMBERSHIPS UP Manila Salinlahi, member, 2010
· Organizer, Palarong Panlahi (1stsem AY 2010-2011)
. UP Diliman Club Xientia (CX), member, 2011
· Organizer, UPCAT Review for QCSHS Seniors Batch 2012 (AY 2011-2012)
CFC Singles for Christ (SFC), Assistant Facilitator 2013-2014, Member 2017
· Assistant Facilitator, Christian Life Program 1 (2013)
· Assistant Facilitator, Christian Life Program 2 (2014)
SEMENARS/TRAININGS
· Completed 70 hours AutoCAD Autodesk Training (Certificate No.: 1424GJLZ28)
MAYNILAD TRAINING:
· RA 1081 Anti-Illegal Seminar
· Maynilad Standard Drawings and Safety Training
· Advanced Excel and Visual Basic Seminar
· Programmable Multi Axis Controller Seminar
· Non-revenue Water Seminar
· Business Continuity Management System Seminar
· Materials Training and Maynilad Standard Drawing Seminar
· Basic PI-Data Link Training / Structure
· Non-Revenue Water Assessment Training
· System Applications Product Training
· Netbase Training
ISLA LPG CORP TRAINING UNDER U.P. N.E.C.:
· Process Safety and Efficiency
· Lean Manufacturing Design and Value Stream Management
· Manufacturing Planning and Control Framework
· Maintenance Management
· Facility Management I
· Product Management
· Understanding the Market/Industry (LPG)
· Product and Process Life Cycle Analysis
· Value Engineering
· Product and Process Life Cycle Management
· Environmental Management (Pollution Prevention and the Environmental Protection System
· Facility Management II
· Supply Chain /Logistics
· Project Management Review
· Concept of Total Quality Management for Continuous Process Improvement including Statistical Process Control
· Selected Properties of LPG – critical properties of gases in compliance to ASTM D1853
· LPG Equipment Design and Installation
· Other LPG Applications
College Scholar (1st semester AY 2011-2012)
Electives taken: Elementary Statistics, Naval Architecture
UNIVERSITY PROJECTS
Model Two-Cylinder Engine
· Design and build a paper prototype and a two-cylinder engine model using recyclable materials
Model Four-Cylinder Engine with Firing Order
· Design and build a four-cylinder engine model with firing order (1-4-3-2) that is able to withstand at least twenty cycles without delays and breaks
Mechanical Whiteboard Eraser
· Design and build a mechanical whiteboard eraser that can erase all the whiteboard marker writings of the entire board with one swipe.
Downdraft Gasifier-Engine-Generator System
· Design and build a downdraft gasifier that can generate power up to 5 kW with a cooling and filter system. Fuel used is Talisay Mesocarp.
Merits
• Participant, 23rd Mostratec International Research Project Competition in Novo Hamburgo, Brazil (November, 2008)
• Best in Research (AY 2008-2009)
• Best in Theater Arts (AY 2009-2010)
• Lead Actor, School Play: Complete Works of William Shakespeare (AY 2009-2010)
• 1st place, Gov. Cresini Oratorical Memorial Cup, District Elimination (AY 2009-2010)
Plant Maintenance Engineer – Technical Services & Engineering Department
· Setup Plant Maintenance Database, instates programs and manages to ensure equipment dependability
· Monitors & identifies equipment for upgrade to efficiently & safely operate all plants
· Coordinates and liaises with other departments for maintenance needs of the plants
· Ensures compliance to HSSE or other local government requirements for all projects
· Actively participates in technical and engineering projects on development, strategy and implementation
· Leads engineering projects involving synergies and cooperation with other industry players
· Prepares detailed cost estimates of LPG projects and conducts tender in accordance with company regulations
· Supervises projects of LPG installations and piping system and ensures compliance to HSSE requirements
· Ensures projects are implemented within the budget cost and schedule
· Conducts compliance check and safety audits on LPG Filling plant & industrial/commercial installations and initiates corrective action
· Coordinates with Procurement and suppliers on sourcing of LPG equipment appurtenances
· Ensures optimum utilization of LPG assets and resources
· Organizes and conducts safety trainings for contractors
· Prepares and implements safety programs for the department
· Assesses safety performance of project contractors
Notable Projects:
o Design and Project Management of 855cubic meter fire water tank and above ground pipeline layout
o Design of LPG Filling Plant (Currently in Construction Phase)
o Project Management of Full Requalification 500MT LPG Bullet Tank
Operations & Maintenance Unit / Planning and Analysis Unit
· Prepares daily job assignments of technical teams.
· Awards Job Orders (JO) to contractors.
· Monitors in-house and contractors’ daily activities and accomplishments.
· Consolidates accomplishment reports submitted by technical team and submits to O&M Supervisor.
· Conducts joint inspection/validation of contractor billings with Admin Specialist and contractors.
· Checks contractors’ billing statements prepared by Administrative Services.
· Closes resolved issues in Customer Service Information System (CSIS).
· Prepares Quantified Benefits (QB) report by using the data provided by Zone Management and project cost estimate to determine Return on Investment (ROI)
· Monitors daily materials withdrawn and used by technical team and contractors
· Prepares Reports on Supply, Billed Volume, Water service Connection, NRW and Revenue.
· Transmits related metering Job Order Accomplishment Reports (JOAR) to Commercial Management and to Geographic Information System Specialist.
· Reviews and consolidates contractors’ accomplishments and checks if they are in accordance with MWSI standards and specifications and submits said accomplishments to Zone Management, Administrative Services and Commercial Management.
· Assists in preparation of long term or five year plans by consolidating the QB of all proposed CAPEX projects.
· Prepares Annual Material Requirements (AMR) by estimating the materials to be used by the contractors and in-house teams.
· Prepares reports on supply, billed volume, water service connections, NRW and revenue.
· Prepares Job Order (JO) reports and issues JO to contractors based on reports/complaints endorsed by Zone Management to Technical Management.
· Assists BA Officer in supervising in-house and contractors’ activities of All Works OPEX projects short pipe-laying, interconnections, metering, valve installations and replacements, etc. that include supervision with PMG group for implementation of CAPEX projects in accordance with MWSI standards.
· Assists BA Officer in ensuring that contractor’s major activities conform to MWSI specifications.
Notable Projects:
o Redesign, reconfigure and re-launch JOAR monitoring System (IVES)
o Creation of monitoring system for New Installation Job Orders