1. Carrer Summary
2. Experiences
3. Educations
4. Skill
5. Languages
6. Personal Details
7. Recommendation
CGPA: 3.27 out of 4
First Division, Marks : 62.1%
First Division, Marks : 80.04%
1. Manage Obsidian & 507 dismantling project of e.co.
2. Managed the ROBI CC Swap project for Network Expansion ROBI axiata 2G(PO-121).
3. Managed the GP Blue Chattala project & GP sale out project
4. Execute action plans by managing and providing support to ensure quality, customer satisfaction and operational efficiency as per business plan target.
5. Communicate with the vendors for deployment of required releases and future roadmap.
6. Resolution of customer complaint within specific time frame.
7. Develops and maintains a detailed project schedule which includes administrative tasks and all sites involved in the project.
8. Responsible to prepare detailed project organization structure and responsibility matrix, assign appropriate tasks and responsibilities to the team members, establish a project management system and training plan, carry out performance evaluation for each of the team members.
1. Planning, Installation, Operation, Maintenance and Trouble shooting of Core Transmission and IIG Network. Fault analysis and quality control of optical transmission network.
2. Liaison with different Telecom Operators.
3. Produce report and analyze those reports and prepare action plan accordingly.
4. Customer & Vendor Communications.
5. Control, Supervise and Manage Overhead cable team to deliver regular client connectivity on a daily basis, as per requirement of Marketing and Work Plan provided from Planning Department.
6. Management of Project basis Over Head cable activities.
7. Leading the team to upgrade and expand existing Overhead cable network.
8. Proper documentation of all activities of Overhead cable team and handover to respective department for updating the network.
9. Maintenance of delivered connectivity, until handover to Operation & Maintenance department.
10. Communicate with vendors/partners concerned, for work progress and running network status, with necessary information sharing.
11. Perform Link Budget Analysis, ensuring links delivered and maintain the standard link budget.
12. Consistently check important tools/equipment of OH cable team, such as OTDR machine, Splice machine, Power meter, Source Identifier for maintenance of equipment.
13. Collect work status from field and prepare activity report for reporting to personnel on a daily basis.
1. Participate in internal technical discussions in view to improve overall network performance and make recommendations wherever possible.
2. Ensure correct working methodology.
3. Efficiently use tools like Alex and KB.
4. Clearing of assigned Trouble Tickets. Escalate TT to Second Level Service/Resource Restoration team.
5. Execute system configuration changes as per given access rights.
6. Raise Work Orders towards the Field Maintenance organization.
7. First level service problem restoration.
8. Handle and analyze Trouble Tickets and recommend timely actions and solutions to Trouble Tickets with guidance or supervision, when necessary.
9. Handle and execute the Change Request in stipulated time frame.
10. Create WO to FM team when necessary.
11. Perform first level Preventive Maintenance of nodes.
12. Ability to perform under time constrains depending upon the business requirements.
1. Execute action plans by managing and providing support to ensure quality, customer satisfaction and operational efficiency as per business plan target.
2. Communicate with the vendors for deployment of required releases and future roadmap.
3. Resolution of customer complaint within specific time frame.
4. Develops and maintains a detailed project schedule which includes administrative tasks and all sites involved in the project.
5. Responsible to prepare detailed project organization structure and responsibility matrix, assign appropriate tasks and responsibilities to the team members, establish a project management system and training plan, carry out performance evaluation for each of the team members.
1. Installation Supervision & Commissioning, Loop Test, Integration of BTS of ERICSSON (RBS 2106, RBS 2106i, RBS 2216, RBS2116V2).
2. Trouble shooting the Ericsson RBS.
3. Installation Supervision, Configuration, Troubleshooting, Remote access, PAT of ERICSSON MW (MINI-LINK TN (1+0, 1+1).
4. Survey, Installation Supervision, configuration, Loop Test, Integration & Troubleshooting & PAT of ERICSSON (POI & EDN).
5. Using Site-Master measure the VSWR and find out the fault of outdoor connectors (DTF), indoor connectors, and feeder cable tapping.
6. Installation & Maintenances of PBC 6500 (Power & Battery Backup System).
7. BER Testing for (E1 & STM-1 Level) 8. Trouble shooting the Ericsson mini link (TN).
1. Installation Supervision & Commissioning, Loop Test, Integration of ERICSSON (RBS 2106, RBS 2106i, RBS 2216, RBS2116V2).
2. Trouble shooting the Ericsson RBS.
3. Installation Supervision, Configuration, Troubleshooting, Remote access, PAT of ERICSSON MW ( MINI-LINK TN (1+0, 1+1).
4. Survey, Installation Supervision, configuration, Loop Test, Integration & Troubleshooting & PAT of ERICSSON (POI & EDN).
5. Measurement VSWR and DTF with site master and solve the VSWR and DTF related Problem
6. BER Testing for (E1 & STM-1 Level)
7. Installation & Maintenances of PBC 6500 (Power & Battery Backup System).