• ÇINARLI / IZMIR TURKEY EML After graduating 2 years Sulayman Demirel University I had to leave because of the last class economic causes of Tubular section and did free electricity mastery until 1999 in the market, I have been still freely continue. I worked as an electrical technician at the construction site of Günkon İnşaat Ltd. Company and I worked as an electric technician at the construction site of the British American Tabo viceroy cigarette factory’s project to expand the production facilities and at the FTD2 project at the phillip morris SA factory. TAV’s İÇTAŞ İNŞAAT SAN. VE TİC.A.Ş. company, working in ANEL ELEKTRİK company, Adnan menderes airport electrical installation and installation of new international lines and G.S.M. I was the head of the electric team. I was a foreman in GAZİEMİR / İZMİR, which has 40 commander rooms and 8 military hangars (2 to be a WEAPON), depending on the subcontractor company. Depending on the contractor company, I worked as a master title. Between 2006 and 2008, I was a master of the electrical repair-maintenance-repair and installation of VESTEL and BEKO FACTORIES, which were active in the city of ALEKSANDROW in VİLADİMİR, RUSSIA in RUSSIA. Team title in MEGA IKEA projects in samara and omsk states, foremen in LIBYA TRIPOLI TRLPOLI EL FETIH UNIVERSITY fire alarm project, automation of ice skating stadium for the world winter olympics between 03 november and 24 december 2010 and connection Between 11 March 2011 and 06 June 2011, I worked as a team leader at the presidential conference hall project for 100 people at the sipapo construction site in the city of malabo in equatorial guinea. The main company in the PRIZIDENT OTEL project on a total of 14 floors in the city of BELARUS MINSK is EMSAŞ İnşaat Turizm Ticaret ve Sanayi A.Ş. I worked as a project controller as electrical field control and general electric form. In the American NATO base project in the caracal district of Devesalu city in ROMANIA, as the head of electrical team in the electrical and mechanical parts of the military wards in the field affiliated to the company Aemec, in the electrical and mechanical parts of the medical units, in the mechanical and electrical, main entrance order and after the entrance order, card and controlled entrance. and also used in the shooting of fiberoptic communication system between the main building with cables between buildings yaptım.proj the end I came to turkey.
Cjonnections and commissioning of all power and signal boards
• Fire alarm, announcement, CCTV… installation and commissioning
• Rack cabinet connections
• Card pass systems and turnstiles installation
• Fiber optic cable connections and splicing
• Installation and commissioning of pneumatic and hydraulic systems
• Test calibration and commissioning of Ex proff instruments
• Installation and commissioning of indoor installation system systems
• Grounding and lightning rod system setup testing and commissioning
• Cable carrying and pan systems construction and assembly
• Busbar systems installation and panel connections
• Og cable headers and splicing
I also use a computer on the internet is very good. BEST REGARDS. MERTOL DURSUNKAYA