PROFESSIONAL EXPERIENCE
Artesyn Embedded Technologies (Emerson Network Power) – Techno Park, Sta. Rosa, Laguna
Industrial Engineer
January 29, 2016 – Present
Responsibilities:
· Handling Model Transfer from China Plant to Laguna Plant
· Sketches and Designing of Production Improvement using AutoCAD Software/Solid works.
· Meets work standards by following production, productivity, quality, and customer-service standards, resolving operational problems; identifying work process improvements
· Analyzing Line improvements, conducts time motion studies and line balancing to determine bottleneck stations, jigs & fixtures requirements and line capacity.
· Assists on everyday tasks including resolving issues and concerns of production with regards to facilities, fabrication, layout and improvements
Achievements:
· Create Routing Template and standard time validation for Model Transfer
· Substituting the manual preparation of yellow tape to mechanical preparation which led to a faster, more efficient process, leading to cost savings.
· Centralization of Sub-assembly station
· Analyzed and Implement 1st Dell 13G Automation line
· PWI Handling Improvement Re-layout
· Process Flow Improvement Re-layout
· Short Slim Flow Line(SSFL)
· NIDEC Potting Automation Re-layout.
· Dell 13G Kaizen(%improvement)
Artesyn Embedded Technologies (Emerson Network Power) – Techno Park, Sta. Rosa, Laguna
Cadet Industrial Engineer (Project Based)
April 22, 2015 – January 22, 2016
Responsibilities:
· Work with the group of Lean Kaizen Champion and conduct study with validation that eliminates waste on the production area.
· Drawing, sketching and designing using AutoCAD software.
· Layout/Space Management
· Responsible for office and production relay-outs.
· Conducts time and motion studies and line balancing to determine bottleneck stations.
· Create Working Permit Document for internal and contractor activity. (Hirac, Aspect / Impact, Transfer Route, etc.)
Achievements:
· Analyzed and Implement Single Process flow Line at Mass Production which helps removed work loss due to unnecessary work / prolonged work, eliminate Batching process, with the benefit of Increased in Productivity and Capacity by maximizing production space (w / provision set up for dual line).
· Overall Line Relay out at Mainline, which improves productivity and reduced travel time. As well as generate 1 additional line.