S. MOHAMMED IRSHADH
Address: Flat I2, Vairam Vasantham Apartments, Vairam gardens, Sambakkulam, Madurai-625007, India
Mobile: +966 593128842 | E-Mail: [email protected] | Best time to call: 09:00 – 23:00 (IST)
LinkedIn: http://linkedin.com/in/mohammed-irshadh-97199772 | Skype Id: [email protected]
MECHANICAL ENGINEER (PLANNING, SAP)
Seeking a challenging and rewarding opportunity in an organization, to leverage the expertise and experience in site planning, project management and quality control in oil & gas and construction industries
SUMMARY
· Result oriented Mechanical Engineering professional with more than Seven years of experience in Project Planning, Resource & Project Management, Procurement and Equipment deployment for large and high value projects. Skilled at managing project scope, cost, and schedule, in a multi-disciplined environment with proven history of completing projects on-time, within budget and high-quality deliverables. Hands on experience in evaluating risks and developing strategies to overcome project obstacles. Strong communication and relationship building skills to achieve company objectives. Looking to utilize my experience for further career development.
SKILL SET
ü Quality Control
ü Contract Management
ü Feasibility Analysis
ü Resource Management
ü Planning Engineering
ü Operations Management
ü Material Procurement
ü Project Planning & Scheduling
EDUCATION
· Bachelor of Engineering (Mechanical Engineering) from Anna University, India (Apr – 2011)
CERTIFICATION
· Systems Applications and Products (SAP in Material Management)
· Foundation course on NX-cad & Auto cad.
· PPM (PRIMAVERA-P.6/V7.0) from Authorized Autodesk training Centre
· ASNT/NDT LEVEL-2 (UT, MT, RT & PT)
· WIN PCS (Windows Project Completion System)
GLOBAL EXPOSURE
· Working in Kingdom of Saudi Arabia as a Planner.
· Worked in Oman for Galfar Engineering and Contracting as a Planning Engineer.
· Worked in UAE for Petrofac International Limited as Assistant Certification Supervisor (WINPCS).
PROJECTS HANDLED
At Star of Kingdom Contracting Services Co. Ltd as a Planning Engineer
Project: Maintenance and Shutdown (Blasting and Painting of Vessels, Pipes and Structures)
Duration: June 2019 – Present
Location: Kingdom of Saudi Arabia
Client: SABIC, ARAMCO & INDIVIDUAL CLIENTS
At Quality Homes as a Planning Engineer (Planning, Site Co-ordination)
Project: Building Construction
Duration: Oct 2017 – Sept 2018
Location: Madurai, Tamilnadu, India
Client: Multiple
At Galfar Engineering and Contracting (S.A.O.G) as a Jr. Mechanical Engineer (Site Planning)
Project: Condensate Recovery Maximization
Duration: Aug 2015 – Sept 2017
Location: Saih-Rawl, Qarn Alam, Muscat
Client: OHL Industrial & SENER, Madrid
Project: Al-Ghubrah International Water Project
Duration: Feb 2015 – Jul 2015
Location: Al-Ghubrah, Muscat
Client: Muscat City Desalination Company (MCDC)
At Tanjore Industrials as a Trainee Mechanical Engineer” (as a Planner)
Project: Fabrication of Boiler Auxiliaries
Duration: May 2013 – Oct 2014
Location: Thuvakkudi, Tiruchirappalli, India
Client: BHEL, Trichy
At Petrofac LLC as a Assistant Certification Supervisor
Project: ASAB Full Field Development-3
Duration: Jul 2012 – Mar 2013
Location: Abu Dhabi, UAE
Client: Abu Dhabi Company for Oil Operations (ADCO)
At EDAC Engineering Limited as a Trainee Mechanical Engineer
Project: 2 X 600 MW Mutiara Thermal Power
Duration: Jun 2011 – May 2012
Location: Tuticorin, Tamilnadu, India
Client: Coastal Energen Private Limited.
OVERALL ACCOUNTABILITIES
As a Planning Engineer
· Preparing and updating of project baseline schedule.
· Analyzing and incorporating the cost and resource for the project in the schedule using primavera.
· Analyzing the project cost by end of each project.
· Designing of (Work Breakdown Structure) WBS and assigning of activity codes for performing tasks
· Preparing & Monitoring of
ü Progress Measurement Sheet
ü Resources Histogram
ü Material Procurement Items
ü Lean on Site (Crew wise)
ü Manpower & Equipment Deployment
ü KPI chart and 3WLA
· Reviewing and forecasting contractor work front availability and conducting continuity of work analysis, Material & Resources Planning.
· Preparing manpower and equipment planning as per the requirement.
· Preparing and analyzing project progress through S-curve (Commodity and Progress percentage).
· Submitting actual progress to client through Progress narrative report (Weekly & Monthly) and Photographic report (Weekly & Monthly).
· Presenting progress reports on internal review meetings daily and weekly basis.
· Preparing and follow up of activities delay register.
· Conducting regular schedule review meetings to understand logic and develop a true critical path for the project, appropriate use of activity codes to develop layouts at different levels for the project team.
· Preparing project executive summary report for keep in track of key activities.
· Maintaining manpower deployment for tracking crew wise production.
· Aiding invoice clearance by providing Contractual manpower data and Progress percentage on monthly basis.
· Keeping track of activities, deviated from the actual scope.
· Analyzing engineering activities for all internal and external departments.
· Establishing and maintain system for tracking of critical quantities, documenting and schedule scenarios for claims or in defense against claims.
· Visiting client location in supporting role, from time to time, visit construction sites to liaison with site schedulers or contractors.
As a Assistant Certification Supervisor
· Prepared Mechanical completion and Ready for commissioning dossiers for RDS as per system and sub-system
· Updated the status of construction check sheets and pre-commissioning check sheets in RFC dossiers
· Maintained RFI’s (Request for Inspection) log which is ready for tri-party walk down
· Received completed construction ‘A’ check sheets and Pre-commissioning ‘B’ check sheets from site and updating in WINPCS
· Collected engineering drawings such as AS-BUILT and SYSTEM MARK UP DRAWINGS from different disciplines
· Verified and compared AS-BUILT drawings with concerned check sheets and maintained records of latest revised drawings
· Generated and maintained NCR’s in case of violations and monitoring corrective actions and maintaining the records
· Updated PUNCH points in WINPCS
· Followed up the mechanical completion certificates for each sub-system
AVAILABILITY
· Planning to relocate immediately.
· Possess no bond with current Employer
LANGUAGE SKILLS
· Proficient in English
· Proficient in Urdu and Hindi
· Basic in Arabic Language
References available upon request