MECHANICAL ENGINEER
Name: MUHAMMAD ASIF
Date of Birth: 02/01/1993
Nationality: Pakistani
Positions: Project Engineer, Planning Engineer, Site Engineer
Email Address: [email protected]
Contact: 00923457151831, 00923375109879
Present Location: House No# 14 Ward E, Kot Addu
Education & Experience:
Education:
Bachelors in Mechanical Engineer
Years of Experience: 4.5 years
Expertise:
Category Subcategory Ability Experience
Engineering Construction Experienced 4.5 years
Summary
Mechanical Engineer with more than 4.5 years’ Experience in the field of Power plant and cement.
Professional Skills
Mechcon Engineering Limited Islamabad Pakistan.
Project: Waste Heat Recovery Power Plant Harripur Hattar (Pakistan)
The project planned to generate 7.5 MW electricity which includes Two HRSG
By using the waste heat of cement plant.
Client: Best way Cement (BCL) Hattar
Designation: Project Engineer
Duration: June 25, 2014 to May 28, 2015
WORK PROFILE:
Reviews product design for compliance with engineering principles, company standards and contract requirements, and related specifications.
Coordinates activities concerned with technical developments, scheduling and resolving engineering design and test problems.
Evaluates and approves design changes, specifications and drawing.
Generally responsible for implementations and monitoring of all Piping and mechanical related works at site as per approved drawings and methods and safety rules.
Interprets construction drawings and studies the contract documents and applicable standards or specifications prior to execution of any jobs.
Plans the execution of all Piping works and coordinates the works to Electrical and civil groups.
Attends regular meeting with client, civil engineers and consultant to provide update on project progress.
Assists in the development of commissioning plans.
Responsible for the management and planning of all, inspection, testing and commissioning activities through to hand-over to the operational team.
Erection,installation and commissioning of Turbine ,Generator, Cooling Tower ,Water Treatment Plant and indoor ,outdoor and underground piping near about 50000 dia. inch
Hyundai Engineering & Steel Ind. (HDESI) Abu Dhabi, UAE
Project: Baraka Nuclear Power Plant (BNPP) Abu Dhabi, UAE
The project planned to generate 5600 MW electricity which includes four APR 1400 Reactors.
Client: HSJV (Hyundai Samsung Joint Venture), KEPCO, ENEC (Emirates Nuclear Energy Corporation)
Designation: Mechanical Engineer
Experience: June 06, 2015 to March 2016.
DUTIES INCLUDED:
· Planning of work assignments using PDCA and other techniques and also inter connecting with planning of other companies for smooth working.
· Execute project work using engineering principles and techniques following Design outlines, Quality, Safety and Time constraints.
· Analysis of work scope according to contractual quantities.
· Planning of work breakdown structure and baseline schedule for the client review.
· Preparing of budgeting estimation and situation action plan SAP considering all in puts (manpower, equipment and materials) and other resources.
· Development of work method statement and possible JHA as required.
· Allocation of resources and providing recommendations to maintain required progress.
· Supervision of sub-contractors and providing guidelines according to the requisition of project and problems solving.
· Development and implementation of plan v/s actual progress reports and charts on daily and weekly basis.
· Analyzing gap between planned and actual activities and perpetration of necessary action plans.
· Handle all the Mechanical & Construction drawings for Steel Structure.
· Review and provide the feedback on the engineering drawings and documents as per scope of supply.
· Responsible to ensure that the drawings and materials as per the specifications and standards.
· Handle the tasks of providing engineering support to sub-contractors and all other concerned.
· Troubleshooting of all technical problems by taking corrective and preventive measures to assure quality.
· Coordination with Clients (ENEC, KEPCO, and HSJV) and Sub Contractors during Installation& QC matters.
· Technical report writing and Safety guidance to workers.
· Forecasting Lean Manufacturing
· Working on NPCMS (Nuclear Power Plant Construction Management System) to plan and actual implementation of project.
· Erection and installation of steel structure of weight near about 25000 ton
AL-REHMAT BUILDERS (PVT) LIMITED MULTAN.
Project: Fabrication, Sand Blasting and Protective Coating (Painting) of Steel Structure,
Platform, Stairs/ Ladders and Railing/Covers etc. at HMC, Taxila.
Designation: Planning Engineer
Duration: March 2017 to November 2018
Duties Included:
· Preparation of project schedule (Tools used: Primavera, MS Project) covering entire scope and within defined timeline.
· Calculating optimal Material requirement, Manpower requirement (of various trades)
& Machinery requirement.
· Plan for budget required for the project and creates various budget heads to document and monitor the expenses.
· Create cash flow analysis i.e. expected billing cash inflow vs cash outflow.
· Coordinates with various deportments like Engineering (who provides working drawings), Procurement (who buys material) & Quality.
· Collect periodic updates and prepare daily, weekly and monthly reports of the project.
· Deciding on the most appropriate engineering techniques and sequence of the activities for each project stage.
· Collaboration with the Site mangers, surveyors, engineer, site worker and other professionals.
Project Safety Training:
(I)Work at height (II) Confined Space (III) Hot Work (IV) Manual Handling (V) Hand and power tools. (VI) PTW (VII) Safety culture and Engineer/supervisor responsibilities
INTERNSHIP:
Kot Addu Power COMPANY (KAPCO)
8 week internship on working principle of combined cycle power plant like gas turbine, steam turbine and HRSG.
VISION: Targets achieving through Planning while keeping Continuous Improvement.
References will be furnished on Demand