Photo

Muralidhara Belur Project manager

United Arab Emirates
AirportHigh rise expertHotelsSchools

CURRICULUM VITAE

MURALIDHARA BELUR                                                                                       Mob     : +971554893361

Email   : [email protected]

 

Objective: To take up challenging, innovative tasks and to excel in the field with continual improvement in skills, knowledge and expertise.

 

Educational Qualification:

 

·         PDCM (Post Graduation diploma in Construction Management) from NICMAR, Pune, India. Year 2006

·         B.E (Civil) from PES College of Engineering Mysore University. Year 1999

 

Professional Attributes: 17 years of experience with 10 years of GULF/ UAE experience in,

·         High Rise Buildings, Airport, Commercial buildings & Hotels, Infra works, School, Themed landscapes.

·         Project management, Contracting and Coordination,

·         Can lead teams, confident & responsible attitude, Quick adaptation & decision making, pro-active, Ability to operate under pressure and deliver to demanding deadlines.

·         Cost Effective, Client/ consultant interaction, Procurement, Billing and estimation, manpower and material

Management, planning and scheduling, quality control with high safety standards.

 

Experience:

 

Al Basti & Muktha LLC. Dubai – April 2016 till date

 

Designation                  : Construction Manager.

Project                         : Dubai Creek Residences @ Dubai Creek Harbour

 

About the project         : The project includes the construction of 6 high rise residential towers each of “2 Basement + 33/38/44 typical floors” connected with 3 towers each combined non-tower podium up to level 4. The project includes ACF, DOKA slab formwork and also conventional types with, 1 fire checked Mechanical floor.

 

Responsibilities:

 

·         Complete responsibility of Towers completion comprising of “2 Basement + 33/38/44 typical floors”, includes execution to required quality to get the customer satisfaction.

·         Managing day-to-day construction activity, progress and manpower for the smooth progress of the project.

·         Operations and Resource Management. Overheads Control. Monitoring Plant & Machineries.

·         Assist in assembling the job site office and equipment requirements.

·         To keep a close look on EOT, claims if any, and mitigate the delays if any.

·         Maintaining and completing Project Key Performance Indicators.

·         Tracking activities against the detailed project plans. Cycle time – Achieving daily, weekly, and monthly targets. Making sure that all the aims of the project are met.

·         Updating project plans to include agreed changes. Organizing and facilitating Project Steering / Operating Committees meetings.

·         Proactively manage changes in project scope, identify potential crises, and devise contingency plans. Identify cost saving to the company.

·         Set Specific and realistic targets to the team and follow up for achieving the same.

·         Responsible for developing a high performing team that strives for quality, safety, cost and schedule improvements at every opportunity with all delivery partners, challenging and seeking to improve the project deliverables.

·         Coordination with – Client, Consultants, Sub – Contractors and internal departments.

·         Coordination/ Involvement with Technical department for drawings, change in designs, temporary structure designs and more.

·         Responding to the letters/ mails of Client and Consultant and to queries of contractors.

·         Conducting and attending the progress review meetings, responding to the minutes of meetings.

Larsen & Toubro Limited. Mumbai. India – January 2013 to March 2016

 

Designation                  : Construction Manager.

Project                         : OMKAR ALTA MONTE

 

About the project         : The project includes the construction of 4 high rise residential towers each of

“8 Podium + 53 typical floors” connected with combined non-tower podium. The project includes ACF, Aluminium Formwork and also conventional types with Wind tunnel and Girder beams/ Structural floors, 2 fire checked floors with Infra/ road works to approach.

 

Responsibilities:

 

·         Complete responsibility of Tower completion comprising of “8 Podium + 55 typical floors”, includes execution, invoicing, and deliver/ Profitability of the project with accepted cost estimate with high safety standard and to required quality to get the customer satisfaction.

·         Maintain Actual cost Vs Tendered cost. Focus on yearly targets set from the management.

·         Undertook all monthly project financial cost reporting.

·         Operations and Resource Management. Overheads Control.

·         Ensure timely submission & certification of RA bills within contractual dates

·         Monitor schedule of Payments / Progress invoicing / Certification.

·         Managed the project team including subcontractors.

·         Ensuring Projects and Programmes are executed using agreed standards & processes.

·         Reviewed and approved all project documentation.

·         Ensured staff and sub-contractors timesheets were accurately completed.

·         Managing day-to-day construction activity, progress and manpower for the smooth progress of the project and maintain the cost record.

·         Maintain a healthy corporate relationship within organization and also with Clients.

·         Giving regular trainings and motivation to subordinates and to Identify & Groom minimum two successors.

·         Retention of staff & workmen and monitor productivity.

 

Mzoon Building Contracting LLC. Dubai – November 2009 till January 2013

 

Designation      : Project Engineer.

Projects           : 2B+G+9 Commercial tower (Suntech Tower), B+G+7 Residential twin towers (Indigo Towers), School

 

Responsibilities:

 

·         Planning and managing the daily works on site,

·         Finalizing and Managing sub-contractors and suppliers,

·         Coordination with the consultants and client, Material approval and ordering,

·         Preparation and approval of drawings from consultants and authorities,

·         Preparation of weekly and monthly reports,

·         Sub-contractor and labour bills,

·         Variations and commercial issues including cost management. Concept to close out.

·         Preparing Project. Initiation documentation. Responsible for ensuring best value is obtained for the project including supplier base, use of internal and external resources

 

Faithful & Gould LLC. PMC (WS Atkins Group). Dubai – January 2008 till October 2009

 

Designation                  : Project Engineer.

Project                         : JUMEIRA LAKES TOWERS

About the project         : The total area covered by the roads, bridges, lakes, waterways and landscaping will be 730,000-square-metre. The project includes the construction of multi storey car parking & garages combined for 3 towers. The project includes 21 clusters with 3 towers and a car park in each cluster constructed along the edges of 4 artificial lakes.

Responsibilities:

 

·         Coordination with – Contractors, Consultants, adjacent tower developers/ contractors, facility management and inter-department (Infrastructure, Retail, Landscaping, lakes)

·         Responsible for handling 3 high profile contractors (1. Building works, 2. Infra Works, 3. Garages)

·         Responding to the letters and queries of contractor and also tower developers/ contractors. Proactively manage changes in project scope, identify potential crises, and devise contingency plans. Manage project budget and identify cost saving to the client.

·         Managing day-to-day construction activity, progress and manpower for the smooth progress of the project and maintain the photo record.

·         Conducting the meetings, Preparing and responding to the minutes of meetings.

 

CSHK Dubai Contracting LLC. Dubai – January 2006 to December 2007.

 

Designation                  : Project Engineer.

Project                         : DUBAI MALL HOTEL (The Address Hotel). BURJ DEVELOPMENT

About the project         : The project includes the construction of a high rise tower with 43 stories of hotel suites, service apartments, clubhouse, facade and a Crown together with a podium which accommodates facilities such as restaurants, a banquet hall, a business center, meeting rooms, a gymnasium with spa facilities and a landscaped swimming pool deck as well as a water feature, hard and soft landscaping, external works and external services. The total cost of the project being 750 million AED.

 

Responsibilities:

·         Personally responsible for all the construction activities in one zone of the entire project.

·         Managing day-to-day production activity, material and manpower for the smooth progress of the zone. Managing the sub-contractors and scheduling the construction activity.

·         Handling and control of piling works, Responsible for all waterproofing works and post tensioning works on site,

·         Preparing the material order, consumption, reconciliation reports, Daily reports for consultants/ Client review

·         Attending and reviewing the progress in the weekly and monthly review meetings with management for the proper sequence and to achieve the target completion dates and mile stones of the project.

·         Providing all the technical aids to the drafting team for the development of working drawing and shop drawings from Contractual and conceptual designs, Rising of Site clarification requests to the consultants for approval.

·         Liaison with Structural Engineers, MEP and Architect representatives with respect to technical aspect.

·         Check Lists – following the Quality control procedures as per the specifications and BS standards towards the successful completion of the Project.

·         Co-ordination with the consultant’s and sub-contractors for inspection and clearance prior to the concreting.

 

Laing O’Rourke. Dubai – January 2004 to December 2005.

 

Designation                  : Site Engineer/ Coordinator – Formwork / False work, Precast, Rebar.

Project                         : DUBAI INTERNATIONAL AIRPORT. EXP PH 2

About the project         : The project includes the package of Concourse 2, Terminal 3 and Car park. Costing USD 1.2 Billion, the project consists of 2,400,000 Cum of Concrete, 450,000 Tonnes of reinforcement, 8,000 Units of Precast Components, 1,500,000 Sqm of Formwork/ False work.

 

Responsibilities:

·         To Design and develop Sketches for formwork Erection, Detailing of Preliminary and conceptual designs into working drawing.

·         Estimation & Quantity take off’s. Rendering technical support for structural analysis and designs.

·         Check Lists – Technical Guidance to execution team, Quality control personnel towards the successful completion of the Project.

·         Initiate process improvement, Strategic planning and forecasting.

·         Co-ordination with the consultant engineers and site representative’s for inspection and clearance of formwork design prior to the concreting.

·         Preparation of weekly and the monthly report for the consumption and reconciliation.

B.G Shirke Construction Technology Pvt. Ltd. Bangalore – August 2001 to December 2003

 

Designation                  : Site Engineer.

Project                         : i) Vidhana Soudha (Icon Structure) – South Block

 

Responsibilities:

·         In-charge of the quality control department. Stone masonry and erection of ornamental stones.

·         Maintenance of records as per ISO: 9001-2000, preparation of weekly bills.

·         Surveying, leveling, Centerline marking, laying of underground drainage boxes.

 

Project                         : ii) Reliance Infocom

Responsibilities           : Construction and commissioning of the building along with billing and manpower Management.

 

Cicon Engineers Pvt. Ltd., Bangalore, India – November 1999 to August 2001

 

Designation                  : Junior Engineer.

Projects                       : Nutrine Confectionery plant at Hoskote, Bangalore District.

About the project         : The industrial building was built for Nutrine Confectioneries, a company which is a pioneer in Indian Market for chocolates.

 

Responsibilities: In-charge for the construction of a wing of the building, Estimation and monthly RA bills.

 

Training Undergone:

· Project Management Skills.

· IOSH (Institution of Occupational Safety and Health).

· TWC (Temporary Works Co-ordination.).

· Safe Procedures for Formwork / False work

 

Personal Details:

 

Year of Birth              : November 1977.

Marital Status            : Married.

Nationality                 : Indian.

Languages Known  : English, Hindi, Kannada, Tamil.

License                      : Valid UAE Driving License.