RICKY Tamayo PATA
Purok-5, Barangay Mapalad Arayat
Pampanga, Philippines
E-mail address: [email protected]
Contact No.: +639663610153, +639454085435
Career Objective:
To work and grow in a challenging environment used to add value to the organization, which demand sheer hard work and responsibility and justify my potential to establish myself as a competent person and work to achieve the goal of the organization
Position Applied For: SAPMT ELECTRICAL SITE SUPERINTENDENT
EMPLOYMENT HISTORY
QC ELECTRICAL INSPECTOR─WITH SAUDI ARAMCO SAP NO.:70016178
QC-Electrical Inspector, May 2008 – Present
Closed awareness & understanding of Saudi Aramco Engineering Standards & Procedures for Electrical (SAES,SAEP-122,SAER 1972,SAMSS,SATIP,SAIC,SATR) and other International industry Code & Standard
Approved QC Electrical Inspector by Saudi Aramco (Shaybah Support Facilities)
Approved QC Electrical Inspector by Saudi Aramco (Shaybah Project Oil and Gas)
Approved QC Electrical Inspector by Saudi Aramco (Manifa Project Oil and Gas)
Approved QC Electrical Inspector by Saudi Aramco Facilities (Tanajib Project)
Office Address: 6862 AL Amir Musaid, Ash Shamaliyah Al-Khobar 34427-3531 Cross 7/8, Front of Diet Center
WORK EXPERIENCE:
SINOHYDRO COMPANY LIMITED
• SHAYBAH SUPPORT FACILITIES
March 22, 2016 to March 22, 2018
– Contract No.: 6600033898
– BI No: 10-00614-0004
Duties and Responsibilities:
Ø Preparation of Project Record Book
Ø Preparation for Electrical Equipment Energization Package
Ø Material receiving Inspection
Ø Conduct site inspection and ensure all electrical installation must comply with the design specifications as per
drawing and applicable standard
Ø Coordinate and prepare various documents such as test, inspection reports, excavation permits, safety approval prior to implementation of work.
Ø To assist and coordinate with the sub-contractor, Supervisor staff to plan co-ordination and control work activities in accordance with approved drawing work method / inspection & specification requirement etc.,
Ø Verification of Inspection Readiness before issuing RFI
Ø Keeping the files/Inspection Records always updated
Ø Highlighting all discrepancies/anomaly detected during monitoring inspection and informing the same to QC Manager.
Ø Initiate NCR as required in consultation with QC Manager.
Ø Follow up of corrective and preventive action for NCR issued and verification of effectiveness of the same.
Ø Taking immediate remedial to clear inspection log book comments
Ø Submitting daily report to QC-Manager at the end of each day of work.
Ø Sole responsible for all Quality Control Activities for the allotted area of discipline.
Ø Verification of materials supplied with that of material submittal
Ø Supervise the work under as per specifications and standards.
Ø Study and analyze the design/sketch plan which include the materials breakdown given by the client for execution of the project.
Ø Review Design and development of one line diagram, preparation of electrical equipment specifications, identifying hazardous areas.
SAMSUNG ENGINEERING, SAUDI ARAMCO PROJECT
• SHAYBAH INCREASE GAS HANDLING CAPACITY PROJECT
March 22, 2014 to December 2016
– Contract No.: 6600023163
– BI No. : 10-00905-0002
Duties and Responsibilities:
Preparation Project Record Book
Ø Preparation for Electrical Equipment Energization Package
Ø Material receiving Inspection
Ø Initiate remedial or corrective action based on standard, code, and specification and verify the closure of NCR.
Ø Invite client/contractor for witness and hold points in Inspection/Test.
Ø Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities.
Ø Ensure the effective coordination with the client related to inspection, testing activities and documentation
Ø Prepare internal punch list and coordinate with the construction prior for inspection.
Ø Review work procedures and method statements for compliance with the good work practices and the costumers contract specializations.
Ø Implementing coverage of proper installation, wiring and cable laying, glanding, termination.
Ø Witnessing of insulation resistance test and hi-pot test.
Ø The completion of QC site instructions and coordinate their closure the review of inspection test packages during the course of construction activities.
Ø Perform proactive surveillance inspection to minimize or avoid discrepancy and non-conformance rectification cost and time
Ø Implementation of quality plan for this project, which include inspection, testing and proper documentation and ensure that all works complied with client/contractor issued (IFC) drawing, applicable standards and specification
Ø Ensure that all related inspection and testing activities with regards to Environment, Health & Safety procedures and maintenance rules are respected.
QC ELECTRICAL INSPECTOR
AL-OSAIS CONTRACTING COMPANY
Dammam, Kingdom of Saudi Arabia
December 02,2011 to January 25,2014
Duties and Responsibilities:
Witnessing and sentencing of all site inspections within their disciplines
Ø Coordinate all site inspections with the site engineer
Ø Ensure that all inspection reports are accurate and that all attached are current status
Ø Ensure all works is correctly prepared prior to any inspection being undertaken
Ø Review all inspection reports for compliance
Ø Assist the QC Manager in the organization ,maintenance and control the quality system
Ø Assist the QC Manager and construction manager in resolving any discrepancies and ambiguities
Ø Coordinate with the site contractors to ensure communications exist and are maintained.
Ø Attend the weekly qc meetings or any scheduled meeting.
Ø Review work procedures and method statements for compliance with the good work practices and the costumers contract specializations.
Ø The issuance of nonconformance reports in conjunction with the site QC manager.
Ø The completion of QC site instructions and coordinate their closure the review of inspection test packages during the course of construction activities.
Ø Compliance with the sites health and safety regulations.
AL-OSAIS CONTRACTING COMPANY, SAUDI ARAMCO PROJECT
• MANIFA Project: Job#119
–Contract No.: 6600023163
– BI No. : 10-00450-0005
• TANAJIB Project: Job#120
–Contract No.: 6600023164
–BI No. : 10-00450-0007
ELECTRICAL INSPECTOR
ALMAJOSE ELECTRICAL DESIGN AND MANAGEMENT
#27Brgy.Libis, Quezon City
May 22, 2008 to July 14, 2011
Duties and Responsibilities:
Inspection of covered discipline of electrical works
Ø Insure the all reports are correct together with the documents needed in site inspection
Ø Coordinate all site inspection with the site contractors
Ø Review work procedures and method statements for compliance with good work practice and the customers contract specialization.
Ø Prepare nonconformance reports to the QA manager and assist in developing corrective actions.
Ø Promote safety in all aspects of the work ensuring that safety management systems are adhering too.
PROJECT SUPERVISOR
R.FERRER ELECTRICAL AND TECHNICAL SERVICES
25 Ramos Compound, Quezon City
June 04, 2004 to March 10, 2008
Duties and Responsibilities:
Ø Generally responsible for implementations and monitoring of the project
Ø Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc.
Required for the project
Ø Inspect project in progress to insure work is Perform correctly to pre-established standards.
Ø To direct the duties and responsibilities of site engineers
Ø Responsible for Weekly accomplishment reports of the project.
ELECTRICAL SUPERVISOR
FERNANDO VITUG CONSTRUCTION
74 Agno Street,Quezon City
September 1995 to Sept. 2003
Duties and Responsibilities:
Ø Supervise & monitor electrical installation and workmanship prepare materials estimate, prepare revision
Plans and electrical as-built
Ø Responsible for the materials requisition with coordination and approval of project engineer.
Ø Inspect work in progress to insure work is Perform correctly to pre-established standards.
Ø To direct the duties and responsibilities of workers
Ø Responsible for daily work accomplishment reports of the projects.
Ø Directly responsible for the safety of all electrical works in the site
Ø Attend weekly technical and progress report meeting.
Ø Perform other activities to complete the project.
EDUCATIONAL ATTAINMENT
1990-1994 Bachelor of Science in Electrical Engineering
University of Luzon
Perez Boulevard Dagupan City
June 2005- March 2006 Advance Computer
Technical and Skills Course
Bureau of Alternative Learning System
Special Skills:
Microsoft Office Application: MS Word and MS Excel and Autocad
SEMINARS/TRAININGS ATTENDED
SUNBELT H2S SAFETY SERVICES
A Division of Maritime Industrial Services Co. Ltd Inc
Conducted By :MR.EDGAR with Cert.No.:TTTH2S-7-6-65
Coductedon:September 25,2013 inManifa ARAMCO office, Saudi Arabia,
NAVAL FACILITIES COMMAND(NAVFAC)
Conducted By: Philippines Association of Service ExportersInc
Conducted in : Manila Philippines
TECHNICAL EDUCATION AND SKILLS DEVELOPMENT AUTHORITY
Conducted By: TESDA National Capital Region
Conducted in : Manila Philippines
PERSONAL
Personal Information:
Ø Hardworking, Work dedicated and enthusiastic.
Ø Can work under pressure
Ø Possess good and efficient teamwork
Ø Flexible and can easily adjust to different working environment.
Ø Can work with less supervision and longer hours
Ø Responsible, and determined to succeed.
Personal Information:
Age: 47 Birth Date: 14 Dec. 1971
Gender: Male Civil Status: Married
Nationality: Filipino Religion: Iglesia Ni Cristo (INC)
REFERENCES:
SAUDI ARAMCO, Saudi Arabia
Engr. Salah Huda
(PMT)Project Engineer
Contact No.: +966-555318654
AL-JEHATCO
Engr. Yaqoub Hamadah
(PMT) Electrical Engineer
Contact No.: +966-567495900
SAMSUNG ENGINEERING
MR. Do Young Lee
QC Manager
Contact No. +966-501192099
AL-JEHATCO
Engr. Cesar Ragos Jr.
SMP: Senior Electrical Inspector (Engineer II)
Contact No.: +966-58709653
I hereby certify that the above information in this application is true and correct to the best of my knowledge and belief.
_________________
Ricky T. Pata
(QC-Electrical Inspector)
Duties and Responsibilities:
Preparation of Project Record Book
Preparation for Electrical Equipment Energization Package
Material receiving Inspection
Conduct site inspection and ensure all electrical installation must comply with the design specifications as per
drawing and applicable standard
Coordinate and prepare various documents such as test, inspection reports, excavation permits, safety approval prior to implementation of work.
To assist and coordinate with the sub-contractor, Supervisor staff to plan co-ordination and control work activities in accordance with approved drawing work method / inspection & specification requirement etc.,
Verification of Inspection Readiness before issuing RFI
Keeping the files/Inspection Records always updated
Highlighting all discrepancies/anomaly detected during monitoring inspection and informing the same to QC Manager.
Initiate NCR as required in consultation with QC Manager.
Follow up of corrective and preventive action for NCR issued and verification of effectiveness of the same.
Taking immediate remedial to clear inspection log book comments
Submitting daily report to QC-Manager at the end of each day of work.
Sole responsible for all Quality Control Activities for the allotted area of discipline.
Verification of materials supplied with that of material submittal
Supervise the work under as per specifications and standards.
Study and analyze the design/sketch plan which include the materials breakdown given by the client for execution of the project.
Review Design and development of one line diagram, preparation of electrical equipment specifications, identifying hazardous areas.
Duties and Responsibilities:
Preparation Project Record Book
Preparation for Electrical Equipment Energization Package
Material receiving Inspection
Initiate remedial or corrective action based on standard, code, and specification and verify the closure of NCR.
Invite client/contractor for witness and hold points in Inspection/Test.
Coordinate and assist construction to resolve any encountered problems related to inspection and testing activities to meet schedule and avoid any delay of activities.
Ensure the effective coordination with the client related to inspection, testing activities and documentation
Prepare internal punch list and coordinate with the construction prior for inspection.
Review work procedures and method statements for compliance with the good work practices and the costumers contract specializations.
Implementing coverage of proper installation, wiring and cable laying, glanding, termination.
Witnessing of insulation resistance test and hi-pot test.
The completion of QC site instructions and coordinate their closure the review of inspection test packages during the course of construction activities.
Perform proactive surveillance inspection to minimize or avoid discrepancy and non-conformance rectification cost and time
Implementation of quality plan for this project, which include inspection, testing and proper documentation and ensure that all works complied with client/contractor issued (IFC) drawing, applicable standards and specification
Ensure that all related inspection and testing activities with regards to Environment, Health & Safety procedures and maintenance rules are respected.
Duties and Responsibilities:
Witnessing and sentencing of all site inspections within their disciplines
Coordinate all site inspections with the site engineer
Ensure that all inspection reports are accurate and that all attached are current status
Ensure all works is correctly prepared prior to any inspection being undertaken
Review all inspection reports for compliance
Assist the QC Manager in the organization ,maintenance and control the quality system
Assist the QC Manager and construction manager in resolving any discrepancies and ambiguities
Coordinate with the site contractors to ensure communications exist and are maintained.
Attend the weekly qc meetings or any scheduled meeting.
Review work procedures and method statements for compliance with the good work practices and the costumers contract specializations.
The issuance of nonconformance reports in conjunction with the site QC manager.
The completion of QC site instructions and coordinate their closure the review of inspection test packages during the course of construction activities.
Compliance with the sites health and safety regulations.
Duties and Responsibilities:
Inspection of covered discipline of electrical works
Insure the all reports are correct together with the documents needed in site inspection
Coordinate all site inspection with the site contractors
Review work procedures and method statements for compliance with good work practice and the customers contract specialization.
Prepare nonconformance reports to the QA manager and assist in developing corrective actions.
Promote safety in all aspects of the work ensuring that safety management systems are adhering too.
Duties and Responsibilities:
Generally responsible for implementations and monitoring of the project
Estimates, prepares and assigns the resources such as manpower, materials, consumables, equipment, tools, etc.
Required for the project
Inspect project in progress to insure work is Perform correctly to pre-established standards.
To direct the duties and responsibilities of site engineers
Responsible for Weekly accomplishment reports of the project.
Duties and Responsibilities:
Supervise & monitor electrical installation and workmanship prepare materials estimate, prepare revision
Plans and electrical as-built
Responsible for the materials requisition with coordination and approval of project engineer.
Inspect work in progress to insure work is Perform correctly to pre-established standards.
To direct the duties and responsibilities of workers
Responsible for daily work accomplishment reports of the projects.
Directly responsible for the safety of all electrical works in the site
Attend weekly technical and progress report meeting.
Perform other activities to complete the project.