RESUME
OF
ROGEL VALENZUELA LOPEZ
F. Sebastian Rd.San Antonio, San Pascual
Batangas, 4204 Philippines
Mobile # 09279587316 / +974 33708726
Email add. [email protected]
POSITION DESIRED : Mechanical Technician / Welder TIG/ARC
OBJECTIVES : To obtain employment as a Welder where I may be able to use my welding knowledge in order to work extensively on the company’s development projects. To perform Safety at all times, Quality, Productivity, Health and Integrity.
SUMMARY OF EXPERIENCED : Almost 7 years experienced as a Mechanical Technician and 12 years as a TIG/ARC Welder in Oil and Gas
Refineries, Offshore, Petrochemical and Power Plant Constructions for Piping Fabrication, Field
Installation, Erection of Pipe spool including maintenance for piping systems, structurals, pressure vessels, boiler welding of omega tubes for Superheater Boiler assembly.
full welding for pipe line Tie-in, Hot Tapping and more welding tasks using
Gas Tungsten Arc Welding (GTAW) Shielded Metal Arc Welding ( SMAW ).
Specific to specialized ASME IX code. Performed welding of all
Welding position likes 1G to 6G by uphill welding progression. Responsible
To know the Filler Metal Specification, AWS classification, Base
Material to be weld, Welding Procedure Specification (WPS), Welding
Process and preparing welding materials and equipments. Have knowledge
of non-destructive test including Visual examination test,
Radiographic test, Liquid Penetrant test, Electro magnetic test and Leak test. Know several likely causes of weld defects likes porosity, slag inclusions, inadequate joint penetrations, incomplete fusion, cracks, overlap and undercuts. Certified and
Qualified welding for Piping and Structural of carbon steel, stainless steel, Chrome with the filler rods such likes, 308L,316L,309L,347 and TGX for stainless steel.
. Work directly to welding Foreman, Supervisor and QA/QC
Know the 3 main specific tasks likes: Before welding, During welding and After welding.
Know and understand all Jobs Safely Analysis and Total Safety Task
Instructions before and after the job.
PERSONAL DATA:
Place of Birth : San Pascual, Batangas
Age : 45
Civil Status : Married
Height : 5’4”
Weight : 70 Kg
Sex : Male
Religion : Seventh Day Adventist
Name of Wife : WennaTolentino Lopez
Name of Children : Shaemel T. Lopez
Name of Mother : Arceli V. Lopez
Name of Father : Epitacio L.Lopez
Dialects can speak or write : English, Filipino
EDUCATIONAL BACKGROUND:
Primary : Bauan Adventist Rural School ( S.Y. 1985-1986)
Secondary : San Pascual Barangay High School ( S.Y. 1989-1990)
Vocational : TESDA- Technical Education Skills Development
Authority – Electric Arc Welder
CERTIFICATIONS :
Liquid Penetrant Testing : International Inspection Services Ltd. Doha Qatar
HUET / SEA SURVIVAL / H2S : Enertech Training Center Inc. Doha Qatar
Shielded Arc Welding NCII : TESDA – Technical Education Skills Development Authority
Electric Arc Welding : TESDA – Technical Education Skills and Development Authority
GTAW/SMAW Welding : Phil-Asia Training Center
GTAW/SMAW Welding : IMI – Industrial Maintenance International Training Center Inc.
Basics Safety Training : IMI – Industrial Maintenance International Training Center Inc.
Basics Safety Training : Granite Services International Inc.
Basics Safety Training : Maritime Training Center of The Philippines
TRAININGS & SEMINARS ATTENDED:
HUET / SEA SURVIVAL / H2S : Enertech Training Center Inc. Doha Qatar
March 26, 2016
Basics Job Safety : General Electric (GE) EHS Core Trainings
www.gsinc.com Granite International Services Inc.
Pasong Tamo Ext. Makati, Philippines
February 18 – 20, 2009
Basics Job Safety www.hacsc.com : Associations of Reciprocal Safety Councils Inc.
Reciprocal Courses Houston, Texas, USA (February 8 – 9 2008)
Basics Job Safety : Industrial Maintenance Int’l.Training Center Inc.
English Course 1272 Eagle Bldg. Estrada St. Malate, Manila
Philippines (October 07 -18 2007)
Basics Job Safety,H2S, : Philippines Shell Petroleum Corporation
Confined Space Entry Shell Refinery, Tabangao, Batangas City,
Line Breaking, Fall Protection, Philippines (March 2002, March 2003, March
Fire Protection and more 2004, March 2005, March 2006, March 2007)
Basic Safety Training of : Maritime Training Center of the Philippines
Personal Safety Social Responsibility 3rd Floor G. E. Antonio Bldg. T. M. Kalaw St.
Fire Prevention & Fire Fighting Ermita, Manila, Philippines
Elementary First Aid June 21- 30 2004
EMPLOYMENTS RECORDS :
# 1.
Company : Fieldcore Service Solutions (formerly Granite Services Intl. Inc.)
( A wholly owned affiliate of General Electric Energy Services USA )
Address : GE Qatar Branch Office
Oil & Gas Middle East / Africa / Turkey Resources
Najma Road Intersection C-Ring Road, PO Box 32348 Doha Qatar
Projects :
1. Qatar Petroleum PS2 / PS3 Platform Offshore
Combustion Inspection / Hot Gas Path Inspection ( AEG Gas Turbine )
April 3 – April 31, 2016
2. OLNG – Oman Liquified Natural Gas Refinery Plant, Sur Sultanate of Oman
Major Inspection of GTG 6 GE Gas Turbine
August 11, – September 1, 2016
3. Sembcorp Power Plant, Salalah Sultanate of Oman
Combustion Inspection 6FA GE Gas Turbine
October 3, – October 10, 2016
4. OLNG – Oman Liquified Natural Gas Refinery Plant, Sur Sultanate of Oman
Hot Gas Path Inspection 6E GE Gas Turbine
October 13, – October 30, 2016
5. Qatar Petroleum Arab D Refining Station, Dukhan State of Qatar
Liner & Transition Piece Inspection Frame 5 GE Gas Turbine
October 31, – November 2, 2016
6. Mesaieed Power Plant, Mesaieed State of Qatar
Major Inspection of GE Generators Steam & Gas Turbine Unit 11, 22, 32
November 3, – November 26, 2016
7. Qatar Petroleum Stripping Station, Dukhan State of Qatar
Combustion Inspection of Frame 3 John Brown Gas Turbine
November 28, 2016 – December 6, 2016
8. Qatar Vinyl Corp. Mesaieed State of Qatar
Combustion Inspection FR6B GE Gas Turbine
December 7, 2016 – December 11, 2016
9. NGL3 Qatar Petroleum, Mesaieed State of Qatar
Major Inspection of Compressor – John Crane
January 2, 2017 – January 12, 2017
10. Qatargas Operating Company Ltd. Ras Laffan State of Qatar
Major Inspection of GTG8 GE Gas Turbine
January 15, 2017 – February 2, 2017
11. Bahrain National Gas Co. – Sakhir Bahrain
Major Inspection of FR3 Hitachi Gas Turbine
February 11, 2017 – February 28, 2017
12. Qatargas Operating Co. Ltd. – Ras laffan State of Qatar
Major Inspection of FR9E GE Gas Turbine MR Unit
March 1, 2017 – March 23, 2017
13. Qatar Petroleum PS2/PS3 Platform Offshore – State of Qatar
Combustion Inspection of FR5 AEG Gas Turbine
April 14, 2017 – May 2, 2017
14. West Burton Power Station, Retford, Nottinghamshire, United Kingdom
Hot Gas Path Inspection GE 9FB Gas Turbine
July 3, 2017 – September 5, 2017
15. Oman LNG, Sur Oman – Major Inspection of AN 200 Compressor
September 13, 2017 – October 4, 2017
16. Qatargas Operating Company Ltd. Ras Laffan State of Qatar
Hot Gas Path Inspection of Train 5 N2 Gas Turbine
October 11, 2017 – October 26, 2017
17. Sembcorp Power Plant, Salalah Sultanate of Oman
Major Inspection of GE 6B Gas Turbine
November 8, 2017 – December 19, 2017
18. OLNG- Oman Liquified Natural Gas, Sur Sultanate of Oman
Major Inspection of GE 6B Gas Turbine
November 22, 2017 – December 15, 2017
19. Qatargas Operating Company Ltd. Ras Laffan State of Qatar
Major Inspection of GE 6B Gas Turbine GTG 9
December 19, 2017 – December 27, 2017
20. Qatargas Operating Company Ltd. Ras Laffan State of Qatar
Major Inspection of GE 6B Gas Turbine GTG 1
January 15, 2018 – February 7, 2018
21. Qatar Petroleum PS2 Offshore Platform – State of Qatar
Major Inspection of AEG Frame 5 Gas Turbine
February 14, 2018 – March 12, 2018
22. OLNG – Oman Liquified Natural Gas, Sur Sultanate of Oman
Hot Gas Path Inspection of GE 6B Gas Turbine Train 1
March 30, 2018 – April 19, 2018
23. Shell GTL Pearl, Ras Laffan Industrial City – State of Qatar
Major Inspection of 6B GE Gas Turbine
April 26, 2018 – May 23, 2018
Position: TIG/ARC Welder / Mechanical Technician
Duties and Tasks :
· Overhauling of gas / steam / turbines and generators for major and minor inspections for shutdown tasks.
· Removal of turbine casings, pipings, combustion can, liner, transition piece, fuel nozzles, etc.
· Overhauling of Rotor and lifting through the inspection and rotor blade removal and replacement.
· Welding for modification of piping and other structural piping support, cutting and gauging with oxyacetylene hotworks.
· Analyzes plans, drawings, work samples, specifications, and work orders to determine work requirements and sequence of welding assignments. Follow welding procedure specifications WPS.
· Estimates material and labor. Recommends supplies and materials to be ordered.
· May operate various power impact equipment.
Knowledge, Skills and Abilities:
· Knowledge of applicable codes, WPS.
· Knowledge of welding techniques, (oxygen-acetylene, electric arc, and TIG, SMAW ), tools and equipment.
.
Character References :
Mr. Rellie Boy Magnaye – Field Mechanical Supervisor
Fieldcore Service Solutions – Qatar Branch Office
Phone no. +974 33603895
Email : [email protected]
# 2.
Company : Atlantic, Gulf & Pacific Company of Manila Inc. www.agp.ph
YAMGAZ SNC Joint Venture of JGC Corp. and Technip ( Client )
Address : Fabrication Yard, San Roque, Bauan, Batangas Philippines
Inclusive Dates : February 23, 2015 – December 18, 2016
Projects : Yamal LNG Modular Construction ( Ship to Sabetta, Russia )
Positions : Pipe Welder (GTAW/SMAW)
Duties and Tasks :
● Accepts working instructions from Foreman and Supervisors regarding
details task instructions
● Ensures that the equipment and other materials needed will always be in good condition.
● Prepares the equipment and other materials needed for each job.
● Reports to welding Foreman all problems encountered.
● Familiarizes with the WPS to be use in particular structure.
● Cleans all weldment after welding such as spatters and slug.
● Maintains the correct current, voltage and travel speed at all times.
● Returns all welding consumables stub, welding electrode butts
grinding/cutting discs and worn out gloves to welding consumables
controller prior to withdrawal of new items.
● Proper usage of all welding and accountable for damages lost due to negligence.
● Ensures that heated quivers shall be plugged in at all times during production usage.
● Ensures compliance with housekeeping.
# 3.
Company : Atlantic, Gulf & Pacific Company of Manila Inc. www.agp.ph
Bechtel Engineering, & Construction Management www.bechtel.com
Address : Fabrication Yard, San Roque, Bauan, Batangas Philippines
Inclusive Dates : May 17, 2013 – August 4, 2014
Projects : GLNG (Gladstone Liquified Natural Gas), Bechtel International
Modular Projects Australia
Positions : Pipe Welder (GTAW/SMAW)
Duties and Tasks :
● A certified and Qualified for GTAW/SMAW Welding process in all position
to ASME Section 9 code.Usually weld in a high pressure welding to 100% x-ray quality.
● Follow welding procedure as written in welding procedure specification ( WPS ). Have
ability to undrerstand results of non-destructive test including RT, Penetrant Test,
Visual Test and more. Know all Weld Repair Procedures.
● To know several likely causes of weld defects or discontinuity likes porosity, inclusions,
Inadequate joint penetration, incomplete fusion, overlap, undercut, cracks and other weld
defects using the GTAW/SMAW welding process.
● Range qualified for the metal components such as carbon steel, stainless steel,
with the filler rods such likes, ER70SG-2, E7018 for carbon steel, ER316L, ER309L,
for stainless steel thru welding of GTAW/SMAW welding process.
Performed 0% welding rejection for Piping of 100% radiographic test.
● To know the Total Safety Tasks Instructions and job Safety Analysis before
and after the job.
● Passed all the welding tests and Safety Training through AG&P and Bechtel Facilities.
Characters References :
Ms Monica Bejasa
Human Resource Personnel
AG&P Fabrication Yard, San Roque, Bauan, Batangas,,Philippines
Phone no. +63 9989665107
Mr. Melvin Bicol
Piping Supervisor
AG&P Fabrication Yard, San Roque, Bauan Batangas Philippines
Mobile # +63 9102168121
Current Employment Location Mobile # +20 1099985124 (Egypt)
# 4.
Company : Granite International Services Inc. www.gsinc.com
( A wholly owned affiliate of General Electric Energy Services USA )
Address : Granite Philippine Branch Office
2289 UPRC 111 Bldg. Pasong Tamo Ext. Makati, Philippines 1231
Inclusive Dates : March 9, 2009 – December 20, 2012
Projects :
1.Major Inspection of Frame 9FA x 2 Units GE Gas Turbine 1& 2 (Shutdown)
ENKA Izmir Power Plant – Alliaga, Izmir, Turkey
March 9, 2009 – April 6, 2009
2. Hot Gas Path Inspection of Frame 6B GE Gas Turbine ( Unit 2 ) (Shutdown)
QVC- Qatar Vinyl Company – Mesaieed, Qatar
April 27, 2009 – May 11, 2009
3. GE Gas Turbine Frame 5 Twin Shaft Inspection & Adjustment (Shutdown)
GASCO – Abu Dhabi OGD 3 Projects – Abu Dhabi, UAE
June 05, 2009 – July 19, 2009
4. Hot Gas Path Inspection of Frame 6B GE Gas Turbine ( Unit 3 ) (Shutdown)
QVC- Qatar Vinyl Company – Mesaieed,Qatar
October 11, 2009 – October 26, 2009
5. Magic SR # 4 Inspection of Generator Unit 91,92, & 93 (Shutdown)
Qatar Electricity & Water Company – Ras Abu Fontas, Qatar
November 17,2009 – December 26,2009
6. Major Overhaul Inspection of Frame 9E Gas Turbine Train 4 C3 (Shutdown
RasLaffan Power Corp. – RasLaffan ,Qatar
March 05 , 2010 – April 29 , 2010
Qatargas Operating Co. Ltd. – RasLaffan, Qatar
May 04,2010 – June 11,2010
7. Major Inspection & CDC Replacement Frame 9FA Gas Turbine (Shutdown)
SembcorpCogen GT 11, Sakra Avenue,Jurong Island,Singapore
November 10, 2010 – December 25, 2010
8. Major Inspection Frame 9E Gas Turbine 3 (Shutdown)
Sembcorp Fujairah Power Plant, Fujairah, UAE
January 7, 2011 – March 5, 2011
9. Replacement of Load Coupling of GE Gas Turbine, Train 1 (Shutdown)
Oman LNG Plant, Sur, Oman
July 19, 2011 – July 30, 2011
10. Combustion Inspection of GE Gas Turbine 7FA (Shutdown)
Qurayyah Power Plant, Qurayyah, Saudi Arabia
October 7, 2011 – December 19, 2011
11. Hot Gas Path Inspection GE Gas Turbine 7EA (Shutdown)
Hawiyah NGL Recovery Plant Saudi Aramco, Saudi Arabia
November 19, 2011 – December 16, 2011
12. Combustion Inspection of GE Gas Turbine 6X 9FA (Shutdown)
Sabiyah Power Plant, State of Kuwait
February 28, 2012 – April 6, 2012
13. Combustion Inspection of GE NuovoPignone Gas Turbine 5 LP/MR Unit
Qatargas Operating Company Ltd. State of Qatar
April 6, 2012 – May 3, 2012
14. O Ring Replacement of Nuovo Pignone Compressor MR Unit (Shutdown)
Qatargas Operating Company Ltd. State of Qatar
September 17, 2012 – October 15, 2012
15. Major Inspection of Gas Turbine 5LP Unit – 2012 Turnaround Shutdown
Gulf Petrochemical Industries Co. Kingdom of Bahrain
November 5, 2012 – November 24, 2012
Positions : Welder / Mechanical Technician
Duties &Tasks :
• Follow the welding procedure as written in Welding Procedure Specification and able
to weld high pressure welding to 100 % x-ray quality.
• Having qualification as per affiliate / standard welding procedure and a certified for
GTAW / SMAW welding in all position to ASME section IX code.
• Assigned being a Welder / Mechanical Technician along General Electric
Gas Turbine Projects for assembly, re-assembly of gas turbine casing, inner casing,
variable nozzle Rotor, compressor and other parts of gas turbine.
• Assigned for mechanical weld repairs and know the proper procedures including analysis,
assessment, excavation, re-welding of excavation and NDT confirmation of repairs.
•Assists for disassemble / Assemble of Turbine Casing including Upper and internal
Casing , Rotor , Bucket , Shroud , Liner , Nozzles and other parts of Gas Turbine.
Performed welding of modification of piping including fuel line, air line and water line.
Performed Oxyacetylene cutting, heating, gauging and any welding methods that involves
Gas Turbine overhauling and assembly.
Responsible to all safety welding procedures and avoid property damaged.
CharactersReferences :
Ms. Mylene Cruz Capoy
Service Coordinator – Abu Dhabi, UAE
Granite Services International Inc. – Abu Dhabi Branch Office
Email Address: [email protected]
Telephone # : +971 43326960 ext. 1805
# 5.
Company : Global Process Services (GPS)
5110 Railroad Ave. Deer Park, Houston, Texas, USA
Projects : Omaha Power Plant Public District (Station 2)
Superheater Boiler Assembly (Zachry Construction Corp.)
Address : Nebraska City, Nebraska, USA
Inclusive Date : October 27,2007 to May 20,2008 (H2B Visa )
Position : Journeyman Combination Welder (GTAW/SMAW)
Duties & Tasks :
● Full welding of 1 ½ inches boiler omega tubes, 2”,4”,6” and 30” pipes for
a super heater assembly of Omaha Power Plant Project.
● A certified and Qualified for TIG and SMAW Welding in all position to ASME
Section IX code. Weld a high Pressure Components to 100 % X-ray quality.
● Assigned welding in Piping Fabrication shop, field Installation for Power Plant
using gas tungsten Arc Welding (GTAW) and Shieldmetal Arc welding
(SMAW) procedures, process and equipments.
● Assist for fit-up crew for fitting and assembling of piping and structural components.
● Read layouts, blueprints, work orders and prepare products for welding,
grinding and torch cutting or oxyacetylene cutting.
● Observes test on welded surfaces, such as Radiographic test and dimension
tolerance to evaluate weld quality and conformance to specifications.
Inspect grooves, angles or gap allowances using micrometer caliper
and precision measuring instruments.
● Assists in Stress reliefs procedures for quality control. Requires testing pipe
systems for adherence to engineering specifications material quantities and take off.
● Passed the welding test of ASME Section IX welding Procedure Specification.
● Perform welding tasks for different kinds of metals likes carbon steel, stainless steel
and chrome.
● Passed all the safety trainings and examination before start all the tasks to the jobsite.
CHARACTERS REFERENCES:
Mr. Drew Ashcraft(Logistic Coordinator) Ms. Nida P. Sarmiento
Global Process Services Administrator Manager
5110 Railroad Ave.Deer Park, Robinson Worldwide Placement Agency
Houston Texas, 77536 USA 2621 Eagle Bldg. Alejo Aquino St.
Singalong, Manila, Philippines
Telephone #(001)281-680-2120
Mobile # (001) 281-853-4304 Telephone # +63 2 5222903
# 6.
Company : Production Services Network Phil. Corp. www.psnworld.com
(Formerly Kellogg Brown &Root Phil. Inc.)
Address : Philippine Shell Petroleum Corporation
Shell Refinery, Tabangao, BatangasCity, 4200Philippines
Projects : Refinery General Maintenance, Shutdowns, and Projects
Duration : March 15,2002 to October 20, 2007
Position : TIG / ARC Welder
Duties & Tasks:
● Almost 5 years as a pipe welder maintenance inside Shell Petroleum Refinery also
assigned welding for Shutdown and Projects.
● A certified and Qualified for GTAW/SMAW/GMAW Welding process in all position
to ASME Section 9 code.Usually weld in a high pressure welding to 100% x-ray quality.
● Follow welding procedure as written in welding procedure specification ( WPS ). Have
ability to undrerstand results of non-destructive test including RT,Penetrant Test,
Visual Test and more. Know all Weld Repair Procedures.
● To know several likely causes of weld defects or discontinuity likes porosity, inclusions,
Inadequate joint penetration, incomplete fusion, overlap, undercut, cracks and other weld
defects using the GTAW/SMAW/GMAW/FCAW welding process.
● Range qualified for the metal components such as carbon steel, stainless steel,
chromewith the filler rods such likes, 308L, 316L, 309L, 347 and TGX for stainless steel
thru welding of GTAW/SMAW welding process.
● Assigned in full welding of Boiler pipes using GTAW welding process,CanInterprete
Isometric drawings and welding blueprints and operate welding equipment and flame
cutting or oxyacetylene equipments.
● Usually assigned welding for piping in Petroleum pipelines,steamline,
fire water line, fabrication, field installation including Tie-in and Hot Tapping
using GTAW/SMAW welding process.
● Know the permitry procedure before start the job and to know all the possible Hazards
about all the tasks inside the Petroleum Refinery.
● To know the Total Safety Tasks Instructions and job Safety Analysis before
and after the job.
● Passed all the welding tests and Safety Training inside Shell Refinery.
CHARACTER REFERENCE:
Mr.Rufino V. Faytaren Jr. (Human Resource Manager)
Production Services Network Philippines Corp.
Philippine Shell Petroleum Corporation
Shell Refinery, Tabangao, BatangasCity, 4200 Philippines
Tel # +63 43 723-4321 to 24 ext. 651 Mobile # +63 91750433 15
I hereby certify that the above information is true and correct to the best of my knowledge and beliefs
______________________
Applicant’s
Resigned December 2012 and Re-hired March 2016
Gas Turbine Maintenance for Oil and Gas / Power Generation Industry
Modular Projects for Piping and Structural / Fabrication and Field Erection.
H2B Working Visa – Skilled Manpower services for constructions projects all over the states.
Welder Maintenance at Shell Petroleum Refineries