Competent, diligent & result oriented civil engineer professional in the field of supervision, project coordination & project execution with a solid background in design and works preparation.
Proven effective in construction management, a meticulous and systematic worker with good organization skills, focused on cost efficiency and progress.
Prepare Project Baseline Schedule and Detailed Plan in Primavera.
Loading of resources – materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, & technical specification
Preparing project execution plans and construction sequence
Prepare construction schedule of materials, labor & equipment
Estimating and preparing quantity survey covering tender preparations, quantity take off, variation order, progress billing, valuation accomplishment and invoicing
Review the technical documents from vendors & subcontractor and managing all subcontracting works (contract, progress monitoring & control)
Preparing and submitting weekly progress report.
Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph
Hardworking and can work under pressure with minimum amount of supervision.
Working independently or as part of a team and highly motivated to provide an excellent result

Education

06/1982 - 04/1987 Bachelor of Science in Civil Engineering at Baliuag Colleges

Registered Civil Engineer Licensed No. 0064426 – since September 1992

03/1985 - 06/1985 Industrial Electricity at National Manpower & Youth Council

3rd Class Building Wiring Electrician Certificate No. 03-3-85-0850 – Since August 1985

Experience

09/2016 – 02/2019 Planning Engineer, Scheduler, Quantity Surveyor, Technical Office Engineer at Julius Berger Nigeria Plc

• Preparing project execution plans and construction sequence
• Preparing and submitting to the client the weekly progress report & weekly photo
• Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
• Loading of resources – materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
• Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man-hours
• Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph

05/2009 – 08/2016 Planning Engineer, Scheduler, Quantity Surveyor at Julius Berger Nigeria Plc

• Do planning for new incoming projects incorporating the engineering design, procurement aspect, and construction project to create a master program schedule
• Loading of resources – materials, labor, plant and machinery needed to carry out a construction project according to the BOQ, drawings, plans, and technical specification
• Weekly updating all activities and scheduling the progress of the project comparing the schedule % complete versus performance % complete (plan % versus actual %)
• Preparing and estimating the tender document
• Preparation of claims change and extra orders
• Preparing and submitting monthly valuation (value of work done) to the Client
• Preparing and submitting to the Client the actual weekly man-hours with direct and indirect man-hours
• Preparing and submitting to the client the Monthly Report which include of all engineering and procurement status, schedule and progress Summary (plan & actual), document control register, HSE statistic, cost and contract, equipment report and progress photograph

07/2006 - 03/2009 Planning Engineer, Scheduler, Quantity Surveyor at I.T.B. Nigeria Limited

• Preparing master schedule and detailed schedule for the new project which includes activity ID, activity name, original duration, baseline project start, baseline project finish, activity logic and total float
• Loading of resources – materials, labor, plant and machinery needed to carry out a construction project, plans, and technical specification.
• Creating schedule of rates items (SOR), rate analysis (Global & Site Level) and resources rate estimate
• Monitoring site progress through inputting actual date of activity start and finish, actual percentage work done, actual expenses, and actual resources consumption.
• Updating and scheduling the site progress status and directly reported to the Cost Control Manager.
• Recording daily resources consumption (materials, labor, tools & equipment)
• Inputting daily requisition which linked directly to inventory section
• Preparing weekly and monthly report such as resources contribution, cost breakup, cost variance, resource consumption, daily progress, monthly program, materials requisition, and material job cost.
• Preparing quotations, work orders, measuring work and billing for subcontractor

02/2001 – 03/2005 Site Engineer, Quantity Surveyor at Arabian Oil & Gasfield Services LLC

• Attending project progress site meeting with the clients and/or consultants
• Taking appointment to the clients for the new project’s inquiries
• Preparing quotation for new projects and estimating bill of quantity
• Daily supervising and monitoring the status of the site
• Preparing and submitting weekly and monthly report to the Project Manager (i.e. progress of every activity, summary progress percentage, man-hours report, cost report, etc.)
• Quantity survey and estimating of new change orders
• Do monthly invoicing on progress completed work

09/1994 – 12/1999 Site Engineer, Quantity Surveyor, Sales Engineer at Al-Zeera International Pools

• Submit weekly and monthly transparent report to the Director of Operation about the progress of the project
• Attend project site meeting and appointment with clients and/or consultants
• Responsible in Project production and quality monitoring
• Responsible in completion and turn-over of the project to the client
• Responsible in commissioning and demonstration of the project
• Responsible in after-sales maintenance of the project
• Design structures and hydraulic for water filtration systems of swimming pools, fountains, artificial lagoons, waterfalls, water walls, water features and other associated facilities
• Landscaping design and construction
• Estimate and prepare quotation for swimming pool and SPA Construction, water feature and renovation work
• Prepare list of manpower and their scope of work for everyday work schedule
• Procure and controlling of materials, tools, equipment’s, and chemicals
• Marketing and sales of products and services of the following categories: SBD Products for concrete repair and restoration, Industrial Coating Application, Mathios décor stone and refractories, Hayward and Certikin Products such as Pumps, Heat Pump, Blower, Filters, Chlorinator, Electric and Gas Heaters, Underwater light, Fountains, and Water Chillers

10/1987 – 08/1994 Site Engineer / Estimator at CEEMM Construction Corporation

• Manage and supervise construction of the manufacturing facilities such as the Production building, Administration building, Canteen building, Generator house, Warehouse building, roads and drainage, rip rapping, elevated water tank, deep well drilling, & water distribution system
• Estimating the Bill of Quantity (BOQ) of materials
• Prepare program of work in Bar Chart, PERT-CPM, Manpower Distribution and Cash Flow Diagram
• Preparing project costing and scheduling of payments
• Inspection and Payment approval of the progress billing presented by the sub-contractor
• Quality control of materials to be applied/purchased for the project
• Supervise, monitor and prepare weekly progress report
• Coordinate with the resident inspector regarding work schedule