Photo

ryan so rigger 3

phillipines ryan so
Computer Literate

 

CAREER OBJECTIVE

A responsible position that warrant my skill and abilities and will serve a strong foundation for my job and to able to expand my horizon and build a more successful career and fruitful future in much admired company   with a progressive management system.

ACADEMIC BACKGROUND

College:                        Central Colleges of the Philippines

#54 Aurora Blvd., Quezon City

Course:                         B.S ELECTRONICS & COMMUNICATION ENGINEERING

Secondary:                   Sauyo High School [S.Y 1994-1998]

2nd Laguna St. NIA Village. Sauyo Novaliches, Quezon City

Elementary:                            Sauyo Elementary School [S.Y 1988-1994]

Del Nacia IV Village, Sauyo Novaliches, Quezon City

 

SKILL

1.        Computer Literate

2.       Lettering

3.       Drawing

 

 

ORGANIZATIONAL & SEMINARS

ASSOCIATIONAL OF ELECTRONIC ENGINEERING (AECES)

TANGLAW DIWA TRAINING CENTER (DREAM PERSONALITY TRAINING/WORKSHOP (ATENEO DEMANILA UNIVERSITY)

 

DOCUMENT

Passport No.  P1717213B

Date issue.      Apr 242019

Date valid:      apr23 2019

WORK EXPERIENCE

 

Company             :               danieli Construction international

Destination        :               ABHU DABI UAE [Emirates Iron steel factory]

Position               :               Rigger

Inclusive Date   :               July 28 2010- august 10 2011

Job experience :               piping erection, structural

 

 

Company             :               Danieli Construction International

Destination        :               JEDDAH Industrial Beteiligung Service and Construction

Position               :               Rigger

Inclusive Date   :               October 19 2011-june 19 2012

 

Company             :               Doosan heavy Industries and Construction

Destination        :               Rabigh Power Plant 2

Position               :               Rigger

Inclusive Date   :               October 09 2012-March 15 2015

Experience         :               Lay down Ducting Installation, piping erection, structural,

 

Company             :               DAEAH ENGINEERING AND CONTRUCTION                                                Destination :               (SARB)   Package 4 Satah AL Razboot

Field Development Project Oil and Gas (OFFSHORE-ZIRKU ISLAND)

Position               :               Rigger

Inclusive Date   :               Feb 22 2017- Jun 30 2018

Expeirience        :               piping erection, structural,

 

Company             :               DAEAH ENGINEERING AND CONTRUCTION

Destination        :              RUWAIS FEFINERY WEST RESTORETION PROJECT, AL RUWAIS ABHUDABI

Inclusive Date   :               July 2 2018 to Nov 10 2018

Expeirience        :               Piping erection, Structural

 

JOB DESCRIPTION

·         Responsible for signaling, position of crane, material using for lifting and status of crane.

·         Working under supervision of the crane operator and the safety of the working area.

·         Performs other duties responsibilities as per direction by immediate supervisor

 

 

 

 

DAEAH ENGINNERING AND CONSTRUCTION  (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE  this project more on pipe track line  as a rigger my job is  installation of  pipe line and erection   using 100 ton  mobile crane TADANO with  appropriate material like shackle  sling belt  in different tons according to the weight of material  we lifting.  In our project we maintain our  material  like  the safety working load (SWL)  we make sure that we using a right  equipment for our lifting  procedure. I also  make a proper signal to the crane operator  that can easily  understand the lifting  area

 

 

 

DOOSAN HEAVY  INDUSTRIES AND  CONSTRUCTUION Rabigh Power Plant 2  SAUDI ARABIA  in this project  as  a rigger in power plant  I handle also  100 tons TADANO mobile crane for erection of ducting and  pipeline but most of all in  duckting that using for chimney and  also pipe that support  to the line .   I also using boom truck for some small material lifting that cannot allow our crane. In every  work  I make all my material make sure all are no damage like sling shackle with I a proper procedure using in lifting material by inspect  the quality of  all  material that  I most use for lifting  . Signal is the most important in rigging   and  lifting plan before start the work. I most fallow our supervision before we start my jo

 

 

DUTIES AND RESPONSIBILITIES OF RIGGER

 

As a rigger, it handles the equipment and supplies that are constantly being supplied  by any lifting  jobs. Responsible for hitching the load and give hand signal the crane operator who maneuvers the crane during lifting operation.

 

Oil rig workers, whether at sea or on land, begin at the rank of roustabout and move up from there. Roustabouts clean, inspect and maintain the equipment such as mud pumps, pipes and cranes. Oil riggers on land move up from roustabout to derrick operator to service unit operator to driller.

Riggers in the construction industry are involved with setting up the pieces of equipment necessary to keep the ship functioning: ropes, pulleys, winches, and cables.

1.Align, level, and anchor machinery.
2. Attach loads to rigging to provide support or prepare them for moving, using hand and power tools.

 

3.Attach pulleys and blocks to fixed overhead structures such as beams, ceilings, and gin pole booms, using bolts and clamps.

4.Control movement of heavy equipment through narrow openings or confined spaces, using chainfalls, gin poles, gallows frames, and other equipment.

5.Fabricate, set up, and repair rigging, supporting structures, hoists, and pulling gear, using hand and power tools.
6.Manipulate rigging lines, hoists, and pulling gear to move or support materials such as heavy equipment, ships, or theatrical sets.
7.Select gear such as cables, pulley

8. Dismantle and store rigging equipment after use.

 

 

 

PERSONAL DATA

Provincial Address:         Daan Bantayan, Cebu City

Zumaraga, W. Samar Leyte

Birth Date:                          February 21, 1981

Weight:                               150lbs.

Sex:                                       Male

Religion:                              Roman Catholic

Citizenship:                        Filipino

Father’s Name:                 Antolin I. So

Occupation:                       Retired gov’t Driver

Mother’s Name:              Luz A. So

Occupation:                       House Wife

 

 

LANGUAGE/DIALECT SPOKEN, WRITTEN AND UNDERSTOOD

English,Tagalog & Bisaya

PERSONAL TO BE CONTACT INN CASE OF EMERGENCY

Mrs. Maribel A. So

# 153 Pantabangan St.NPC Village Tandang Sora, Quezon City

Contact no. 5086758/ 09997771612

 

CHARACTER REFERENCE

Mrs. Mercy Buslon                                                                                          Mr. Mark Alberto B. Canlas

Public /Teacher                                                                                                                Corporate Planning Division

AMA COMPUTER Learning Center                                                           National Transmition Corporation

SO, Ryan Arriesgado

___________________________

Signature of empl

Education

1994/1998 high school graduate at sauyo high school

Experience

July 28 2010- august 10 2011 rigger 3 at danieli Construction international

• Responsible for signaling, position of crane, material using for lifting and status of crane

October 19 2011-june 19 2012 rigger 3 at Danieli Construction International

• Working under supervision of the crane operator and the safety of the working area.

October 09 2012-March 15 2015 rigger 3 at Doosan heavy Industries and Construction

•DOOSAN HEAVY INDUSTRIES AND CONSTRUCTUION Rabigh Power Plant 2 SAUDI ARABIA in this project as a rigger in power plant I handle also 100 tons TADANO mobile crane for erection of ducting and pipeline but most of all in duckting that using for chimney and also pipe that support to the line . I also using boom truck for some small material lifting that cannot allow our crane. In every work I make all my material make sure all are no damage like sling shackle with I a proper procedure using in lifting material by inspect the quality of all material that I most use for lifting . Signal is the most important in rigging and lifting plan before start the work. I most fallow our supervision before we start my jo

Feb 22 2017- Jun 30 2018 rigger 3 at DAEAH ENGINEERING AND CONTRUCTION ((SARB) Package 4 Satah AL Razboot UAE)

DAEAH ENGINNERING AND CONSTRUCTION (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE this project more on pipe track line as a rigger my job is installation of pipe line and erection using 100 ton mobile crane TADANO with appropriate material like shackle sling belt in different tons according to the weight of material we lifting. In our project we maintain our material like the safety working load (SWL) we make sure that we using a right equipment for our lifting procedure. I also make a proper signal to the crane operator that can easily understand the lifting area

July 2 2018 to Nov 10 2018 rigger 3 at DAEAH ENGINEERING AND CONTRUCTION (RUWAIS FEFINERY WEST RESTORETION PROJECT, AL RUWAIS ABHUDABI

DAEAH ENGINNERING AND CONSTRUCTION (SARB) package 4 Satah Al rasboot oil and gas refinery Abhudabi UAE this project more on pipe track line as a rigger my job is installation of pipe line and erection using 100 ton mobile crane TADANO with appropriate material like shackle sling belt in different tons according to the weight of material we lifting. In our project we maintain our material like the safety working load (SWL) we make sure that we using a right equipment for our lifting procedure. I also make a proper signal to the crane operator that can easily understand the lifting area