Desirous to excel at all tasks with which I am entrusted, employing innovation and confidence, while upholding the ethics of, and working towards the organization’s vision and mission continually aspiring towards excellence.
Evaluated by World Education Services, WES – 16-12- 2019)
Supervising multi-disciplinary teams of staff, including cleaners, security and other external artisans.
Ensuring basic facilities such as water, air-conditioning is serviceable and well maintained.
Overseeing building projects, renovations or refurbishment.
Liaising with artisans on scheduled maintenance on equipments.
Communicating with Members of Staff about state of the Facility when needed.
Organized a Periodic maintenance of Equipment in the Materials Laboratory.
Participating in Failure Analysis on Aircraft parts.
Participating in Material Tests (Non-destructive or Destructive) on aircrafts parts.
Participate in the review of Metallurgical Reports from Airline operators.
Participate in the daily maintenance of the office equipment and facility.
Participate in ongoing research efforts to rehabilitate AIB material laboratory.
Participating in the timely publications of Accident Reports.
Sharing knowledge and enhancing international standards of accident and incident investigations.
Liaising with artisans on schedules maintenance on equipments.
Recording Generator Active Hours.
Preparing data from the Flight Data Recorder (FDR) and Cockpit Voice Recorder (CVR) for proper investigation.
Participated in August 2019 AIB – NTSB Aviation Safety Symposium in Conjunction with Safer Skies for Africa Initiative.
Sending out notifications to participating bodies of aircraft incidents/accidents
Accident and Incident Reconstructions with the Aid of AutoCAD software and the In-house Flight Analysis Software
Conducting hardness test on sample pre-cast concrete drain wall slab.
Ensuring comply with the relevant regulations and quality standards.
Ensure the quality of concrete and aggregate.
Performed Compression tests on molded specimens and on hardened concrete cores
Reviewing Engineering Drawing to evaluate Material Schedule
Preparing material Schedule
Preparing Bill of Quotation
Prepared Cost Evaluation
Prepared weekly Progress Report