Federal Electric and Water Authority ( FEWA )
Reach Employment services
Electrical Inspector
Oct. 17 2018 – Up to present
Preparation for required testing activities using latest reference documents .
Conduct onsite inspection carried out by contractor in respect of the work related to electrical power .
Ensure all Electrical contractor compliance as per FEWA rules and standards.
Carry out inspections on Exception Items as documented in the internal system and sign off a closed when activity is complete.
Mafumiera Sul Offshore Project
Chevron Angola / DSME / AG&P
Senior E&I commissioning Lead Technician
March 29 , 2016 – June 22 , 2017
Preparation for required testing activities using latest reference documents .
Perform joints inspection& testing activities within vendors as per project standard specification.
Filling of forms completed testing and loop testing report
Perform loop testing / checking / functional testing of instruments such as pressure / temperature / flow transmitters and switches.
Perform signal simulation and functional loop testing of flow instruments with coordination of BOARDMAN and DCS son sole to obtain and confirmed input / output signal.
Perform loop checking calibration re-calibration, troubleshooting, verification re – verification of various instrument control.
Preparation of test report for HI POT testing activities of High voltage cable 13800V /4160 KV
Control wiring rectification for power vendor scope of works switch gear panel.
Cable glanding and termination for all instrument & electrical equipment / panel board
Conduct High potential testing on High and Medium voltage 13.8 KV and 4.16 KV
Alhosn Gas Plant Abudhabi
Saipem Abudhabi
Instrument commissioning Supervisor
Sept. 01, 2014 – March 10,2015
Monitor and ensure work is completed in accordance with the commissioning plan & HSE Management plans and ensure full compliance to those plans.
Detailed planning of day to day work direction in fields activities and Documentations .
Ensure alignment to process operations schedules works, methods adequate, resourcing, Materials and safety equipment requirements.
Provide direct supervision and direction to unit 20 assigned Technician and assigned pre-commissioning Technicians.
Ensure regular communications with the operation field supervisor for priority operation activities in each unit.
Conduct day to day Tool box meeting and identifying and managing risk before work started in the field.
Attend and records commissioning meeting when specified by site commissioning manager and follow up implementation and close out all agreed actions
Perform signal simulation and functional loop testing of flow instruments with coordination of BOARDMAN and DCS son sole to obtain and confirmed l/0 signal.
Monitor / Facilitate new work order reports and closed work order reports.
Perform loop checking calibration recalibration, troubleshooting, verification re – verification and medication of various instrument control.
Ensure regular communication with various vendor packages (Field Service Representatives).
Ensure that all commissioning activities and work permits are in compliance with HSE management.
Kashagan Island,Kazakhstan ,Agip ,Eni
Experimental Project in Kashagan Island D Kazakhstan project
Saipem E & I Supervisor Mechanical Completion Department
Jan 02 2013 – July 10 2013
Inspect the production quality to establish if the client requirements are being achieved, Generate punch list through checking of the system, all observations and findings are recorded in Automated Completion System (ACS) and collated into a single Punch list.
Supervised and attend all necessary inspections as identified in the approved Inspection and Test Plan (ITP) .
Assure that all punches found during inspection were notified and brought to the attention of concerned departments.
Re-walk down together with the Client Inspector/Representative to verify whether the punch has been done prior to package handover to next phase.
Generate P&ID drawing , Lay out ,Termination drawing by Electronic Data Management system. Review of relevant documentation to verify compliance to specification and QC Plan prior to release testing.
Check to confirm valid certification exists and correct assembly and tagging of Electrical & instrument and other items per agreed design documents prior to handover to commissioning.
Supervised / Carry out inspections on Exception Items (EI) as documented in the internal system and sign off a closed when activity is complete .
Record and document any and all deviations from the Project Quality Program and the Company Integrated Management System (IMS)Knowledge on ACS & IMIS software to prepare needed plant drawings.
Provide support and advice to the construction personnel in relation to the Project Quality Program and the Company Integrated Management System (IMS).
Kashagan D-Island, Kazakhstan ,Agip ,Eni
Experimental Project in Kashagan Island D Kazakhstan project
Enertech E & I QC Inspector Mechanical Completion Department
April 01 2012 – Oct 29 2012
Monitor test package / sub-system status through Automated Completion System (ACS) prior to checking of the works.
Generate punch list through line checking of the system, all observations and findings are recorded in Automated Completion System (ACS) and collated into a single Punch list.
Assure that all punches found during inspection were notified and brought to the attention of concerned departments.
Re-walk down together with the Client Inspector/Representative to verify whether the punch has been done prior to package handover to next phase.
Generate P&ID drawing , Lay out ,Termination drawing by Electronic Data Management system. Review of relevant documentation to verify compliance to specification and QC Plan prior to release testing.
Check to confirm valid certification exists and correct assembly and tagging of Electrical & instrument and other items per agreed design documents prior to handover to commissioning.
Provide support and advice to the construction personnel in relation to the Project Quality Program and the Company Integrated Management System (IMS).
Maintain good record keeping of activities carried out and inspection reports, surveillance reports ,etc.
Attend all necessary inspections as identified in the approved Inspection and Test Plan (ITP)
Inspect the production quality to establish if the client requirements are being achieved
Perform a variety of inspection functions under supervision
Record and document any and all deviations from the Project Quality Program and the Company Integrated Management System (IMS)
Coordinate with the client representatives to ensure that inspections are carried out expediently
Generate client Requests For Inspection (RFI) where required providing sufficient notice for Hold, Witness and Inspection points
Carry out inspections on Exception Items (EI) as documented in the internal system and sign off a closed when activity is complete
Continually carry out surveillance inspections on the project recording and documenting any and all deviations from the Project Quality Program and the Company Integrated Management System (IMS)
Review the calibration status of any test equipment being utilized on the project ensuring the equipment is within calibration prior to use.
Total E&P FPSO pazflor projects
Block 17 Angola offshore
Lead E & I Commissioning Technician
June 19, 2011 – Nov.29, 2011
Perform commissioning / loop checking functional testing on all electrical / instrument t equipment for water injection pump package ,LP/MP compressors .
Actively work on all the Pre-commissioning activities and works and punch list items .
Ensure all process related works for the facilities are in accordance with FSR / clients specifications and making sure they are maintained in order to safeguard technical integrity.
Supervised 3rd party Maintenance personnel on troubleshooting , loop checked and calibration .
Enforcement of Permit to Work system, (IIF) incident and injury free campaign and HSE procedures.
Provide technical support to the project commissioning, operating procedure and documentation .
Uses troubleshooting skills to resolve process related deviations and problem .
Do pre-commissioning testing of all process instruments ,Fire and gas system on FPSO .
Assist on LPMP compressor / Water injection pump Operator Training procedure testing .
Stand –by Commissioning technician during OTP testing .
Total E&P FPSO Pazflor projects,
DSME Shipyard Okpo Korea
Lead E & I Commissioning Technician
June 03, 2010 – Dec. 04 , 2010
Monitor condition of gas turbine instrument and controls including data collection & data analyses , provide recommendations based upon the findings which apply to both predictive & preventive maintenance .
Coordinate with the Field Service Representative the daily work activities for utilities unit start-up and Pre-commissioning .
Work for the Gas Turbine Unit for lube oil leak testing, system flushing and Unit pre-commissioning.
Supervise 3rd party maintenance personnel on Troubleshooting and maintenance of Gas Turbine Engine.
Coordinate and secure work permit issuance for every job schedules .
Stand by Maintenance during start –up operations of 3 units Water injection pumps packages .
Calibration and functional testing of all Fire & Gas system protection of Gas turbine packages .
Foster wheeler BP-Cooker Modules project .
AG&P site San Roque, Bauan ,Batangas
Lead Electrical Technician
Jan. 13 , 2010 – May 30 , 2010
Interpret electrical and P & ID drawing , symbols and schematic diagrams .
Perform troubleshooting and testing of electrica,l and instrument equipment .
Interface with the construction group on the integrity of the installed instruments .
Perform schedules and supervised maintenance activities & project improvements .
Enforcement of Permit to Work system and HSE procedures.
Follows safety rules and procedures pertaining to Electrical and instrument maintenance works.
Conduct pre – commissioning works on all electrical and instrument equipment .
Tumbua Landana Drilling production platform
Chevron Facilities Block 14 Angola offshore
Commissioning E&I Technician
Nov.27 2008 ─ Sept.2009
Follow operating discipline principles , procedures and practices to ensure safe and efficient operations .
Interface with the construction group on progress of construction and equipment modifications .
Ensures operational activities and process performance are aligned with plants and business goal .
Enforcement of Permit to Work system and HSE procedures.
Stand-by maintenance on company black start testing procedures sequence.
Do all punchlist item issued by client inspectors.
Supervised hi-pot testing ,testing procedures by 3rd party contractors.
Do pre- calibration of all instrument equipments in the plants .
Agbami FPSO CHEVRON ,
Nigeria Usan Equatorial Guine Offshore
Commissioning E&I Technician
Apr. 17 , 2008 ─ Aug. 21 , 2008
Allign in company safety standards work practises .
Supervise during the Pre-commissioning of Solar gas turbine water injection pumps main equipments and other auxiliaries.
Execute commissioning activities as describe in the commissioning procedure.
Execute PTW (permit to work) and enforced regulations as required.
Assist on pre-start up commissioning activities in FPSO .
Work on calibration, Troubleshooting modification loop testing and functional testing of all process instruments to be used on oil productions.
Coastal Bay Chemicals inc.
San Miguel , Bolo , Bauan, Batangas
Maintenance Engineer
Mar. 2007 ─ Apr. 22 , 2008
Operates and field checks process equipment. Monitor process conditions, equipment and control systems. Performs tasks assigned to operations as per Master Task List Field checks, equipment preparation .
Logistics back up as RM batcher; assist bulk shipments & RM inventory.
Performs Safety Orientation for Contractor’s & New Employees as required.
RAW Materials handling and batch preparation.
Quality testing for finish goods deliveries.
Back up Maintenance Technician during Manpower unavailability.
Supervising of the re-commissioning of the main equipments of the boiler system.
Prepare all the commissioning reports and data records for the client approval.
Conduct proper inspection / calibration of all laboratory equipment .
Supervise all commissioning activities and the Operational process for the units
Do calibration and T&I testing procedures and testing reports .
Back up operators during manpower / operation unavailability .
Union Carbide Philippine ( Far East ) inc.
San Miguel , Bolo , Bauan, Batangas
Production Technologist
Oct. 3, 2003 ─ Mar. 3 , 2007
Monitor Equipment condition including data collection & data analyses; provide recommendations based upon the findings which apply to both predictive & preventive maintenance.
Operates and field checks process equipment. Monitor process conditions, equipment and control systems. Performs tasks assigned to operations as per Master Task List, e.g. Field checks, equipment preparation, samples, etc.
Supervise installation / removal / Replacement of the main boiler equipments.
Initiate start-up of plant equipment as per batch operating procedures.
Supervise Pre-commissioning of Boiler Auxiliary equipments.
Follow and execute as per batch operating procedure .
Initiate gas-in initialization to the power plant.
Trouble shooting of plant alarms and performed corrective action as required.
Reduced Equipment Un-planned breakdown for mechanical equipments by establishing Equipment Inspection plan, Proper Maintenance scheduling & Maintenance material Inventory.
Facilitated the installation of WIP recovery blending line that generates soft saving for the company.
Logistics back up as RM batcher; assist bulk shipments & RM inventory.
Performs Safety Orientation for Contractor’s & New Employees as required.
Knowledge on how to operate a chemical plants ( ex-process operators on dow chemicals a chemical plants )
I & E industrial System Services.
Libjo Takad Batangas city
Senior Maintenance Technician
Mar. 1998 ─ Oct. 1 , 2003
Senior Maintenance Technician assign in Union Carbide Phil’s to execute Routine /Preventive maintenance of various Instrument / Electrical equipments.
Assign also on Calibration of various instrument equipment use on processing and laboratory equipments used for quality testing.
Performed instrument installation wiring , loop checking, instrument configuration, calibration and commissioning instrument controls and do all documentation for services and calibration reports.
Such duties include monitoring, testing, repairs and provide technical supports to production personnel.
Performed the over hauling and calibration of safety valves.
Updated & documented appropriate Maintenance files, procedures, records & PPM program including improved Maintenance Operating Discipline.
Caltex Refinery BML Manpower supply
San Pascual , Bauan , Batangas
Industrial Electrical Technician
Feb. 1996 ─ Feb . 1998
Assigned in Caltex refinery as an industrial electrician performed electrical power termination, wiring and loop checking, conduit bending, cable pulling & splicing, control power termination, support fabrication.
Pre start up commissioning of all Electrical / Instrument equipment Tank Farm facilities .
Do proper documentation on maintenance progress reports .
Attend in the integrity testing of plant and equipments.
Performed troubleshooting of various electrical controls such as wye delta connection, stop start and forward /reverse controls. Such duties include monitoring, testing, repairs and provide technical supports to production personnel.